# US 2010/0165789 A1 · Method for determination of the oil formation water-flooding area pattern and size in the wellbore zone

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2010/0165789 A1
- Document ID: US20100165789A1
- Status: Published application
- Kind: A1
- Application number: 12/648,868
- Filed: 2009-12-29
- Published: 2010-07-01
- Earliest claimed: 2008-12-29
- Assignees: Schlumberger Technology Corporation
- Inventors: Oleg Nikolaevich Zhuravlev; Dmitry Anatolievich Koroteev; Irina Anatolievna Gorban
- Web page: https://patentgrep.com/patent/US20100165789A1

## CPC

- G01V 3/22: using DC
- Y02A 90/30: Assessment of water resources
- G01V: GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS (means for indicating the location of accidentally buried, e.g. snow-buried, persons A63B29/02)
- Y02A: TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE

## Abstract

The method for the determination of an oil formation's water-flooding area pattern and size in a borehole zone comprises grounded electrode installation at a certain distance away from the borehole sufficient enough to avoid electrical breakdowns. An electrical pulse generator is connected to a wellhead and to the electrode. A voltage pulse is applied between the wellhead and the electrode and electrical and/or acoustic response to electrical disturbances are measured. Pattern and size of the oil formation's water-flooding area is determined by an acquisition and processing system using a 4D seismic method. This method is technically simple to implement and may be applied under different field conditions.

## Claims

### Claim 1

A method for the determination of an oil formation's water-flooding area pattern and size in a wellbore zone, comprising the steps of:
installing a grounded electrode at a certain distance away from the well sufficient enough to avoid electrical breakdowns;
connecting an electrical pulse generator to a wellhead and to said electrode;
applying a voltage pulse between the wellhead and said electrode;
measuring electrical and/or acoustic response to electrical disturbances; and
determining the oil formation's water-flooding area pattern and size by an acquisition and processing system using a 4D seismic method.

### Claim 2 (depends on 1)

A method of claim 1, wherein a rectangular voltage pulse is applied as a voltage pulse.

### Claim 3 (depends on 1)

A method of claim 1, wherein electrical and/or acoustic response to electrical disturbances is measured by at least one electrical and/or acoustic transducer located either on the surface, or in the wellbore.
