# US 2010/0161359 A1 · Risk Management for Cable Protection Via Dynamic Buffering

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2010/0161359 A1
- Document ID: US20100161359A1
- Status: Published application
- Kind: A1
- Application number: 12/339,006
- Filed: 2008-12-18
- Published: 2010-06-24
- Earliest claimed: 2008-12-18
- Assignees: AT&T Intellectual Property I, L.P.
- Inventors: Michael Asher
- Web page: https://patentgrep.com/patent/US20100161359A1

## CPC

- G06Q 10/06: Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q 10/0635: Risk analysis of enterprise or organisation activities
- G06Q 40/08: Insurance
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

Devices, systems and methods are disclosed which relate to optimizing a minimum cost function associated with buried asset lines by using a GIS application to generate a “dynamic buffer” around each asset line based on a risk management algorithm. A risk management algorithm, by which a GIS application can generate a “dynamic buffer”, is employed to minimize asset line damage risk and operating costs by balancing potential costs from damage against the fixed labor costs of manually screened and located tickets. Embodiments of the invention utilize the geography of the situation as well as factors for the asset itself.

## Claims

### Claim 1

A method of minimizing the cost risk of an asset line carrying a utility, comprising:
assessing a first factor identifying an ability to automatically re-route the utility in the event of a loss of the asset line;
assessing a second factor measuring the total value of the utility carried by the asset line;
inputting the first factor and the second factor into a risk management algorithm;
solving the risk management algorithm for a dynamic buffer width; and
assigning the dynamic buffer width to the asset line;
wherein a dig location is evaluated by its position with respect to the dynamic buffer width.

### Claim 2 (depends on 1)

The method in claim 1, further comprising reassessing the first and second factors in real time.

### Claim 3 (depends on 1)

The method in claim 1, wherein the assigning further comprises overlaying the dynamic buffer width on a map layer of a GIS application.

### Claim 4 (depends on 3)

The method in claim 3, further comprising overlaying the dig location on the map layer of the GIS application.

### Claim 5 (depends on 1)

The method in claim 1, further comprising sending a technician to a dig location evaluated to be within the dynamic buffer width of the asset line.

### Claim 6

A system for minimizing the cost risk of a buried asset line carrying a utility, comprising:
a server;
a GIS application on the server;
a risk management logic on the server; and
a database having a plurality of restorability factors and a plurality of revenue factors in communication with the server;
wherein the server responds to a dig location query with an evaluation of a dig location with respect to a dynamic buffer width calculated using the risk management logic.

### Claim 7 (depends on 6)

The system in claim 6, wherein the plurality of restorability factors and plurality of revenue factors are updated periodically.

### Claim 8 (depends on 7)

The system in claim 7, wherein the GIS application is refreshed when the plurality of restorability factors and plurality of revenue factors are updated.

### Claim 9 (depends on 6)

The system in claim 6, wherein the server is in communication with a plurality of utility companies.

### Claim 10 (depends on 6)

The system in claim 6, wherein the GIS application has a dynamic buffer layer overlaying a map layer.

### Claim 11 (depends on 6)

The system in claim 6, wherein the GIS application dedicates an individual dynamic buffer layer to each utility.

### Claim 12

A software program, stored on a computer readable medium, for minimizing the cost risk of an asset line carrying a utility, comprising:
a first code segment for assessing a first factor identifying an ability of the network to automatically re-route communication in the event of a loss of the asset line;
a second code segment for assessing a second factor measuring the total value of the utility carried by the asset line;
a third code segment for inputting the first factor and the second factor into a risk management algorithm;
a fourth code segment for solving the risk management algorithm for a dynamic buffer width; and
a fifth code segment for assigning the dynamic buffer width to the asset line;
wherein a dig location is evaluated by its position with respect to the dynamic buffer width.

### Claim 13 (depends on 12)

The software program in claim 12, further comprising a sixth code segment for reassessing the first and second factors in real time.

### Claim 14 (depends on 12)

The method in claim 12, wherein the fifth code segment further comprises overlaying the dynamic buffer width on a map layer of a GIS application.

### Claim 15 (depends on 14)

The method in claim 14, further comprising a seventh code segment for overlaying the dig location on the map layer of the GIS application.
