Method and system of controlling a hydroelectric plant
AssigneeGeneral Electric Plant
InventorReginald L. Nicoson
Life of this patent
Estimating the term…
Loading patent…
AssigneeGeneral Electric Plant
InventorReginald L. Nicoson
Estimating the term…
An embodiment of the present invention may incorporate an adaptive model based control (MBC) for determining a physical parameter, such as, but not limiting of, generator output, head, generator speed, or the like. The adaptive MBC may reduce the need for pre-defined control curves. The adaptive MBC may receive a plurality of data on the hydroelectric plant and then build an operating model. This model may then be used to forecast and/or control an output variable, such as, but not limiting of, a generator output of the hydroelectric plant. The control system of an embodiment of the present invention may be configured to automatically and/or continuously monitor the hydroelectric plant to determine whether a physical parameter is within a desired range. Alternatively, the control system may be configured to require a user action to the initiate operation. An embodiment of the control system of the present invention may function as a stand-alone system. Alternatively, the control system may be integrated as a module, or the like, within a broader system, such as a turbine control or a plant control system.
A method of controlling a hydroelectric plant, the method comprising:
A system for controlling a hydroelectric plant, the system comprising:
Dependencies are inferred from the claim text.