System and method for phase load discovery
AssigneeSensus USA Inc.
InventorsGeorge Uram, Jeff Gallagher
Life of this patent
Estimating the term…
Loading patent…
AssigneeSensus USA Inc.
InventorsGeorge Uram, Jeff Gallagher
Estimating the term…
A system and method for determining the relative phase of each of a plurality of load meters connected to a three-phase power distribution system. The system includes a gateway that communicates information to and from each of the individual load meters. The gateway generates a timing pulse that is received by each of the load meters. Based upon the delay from the receipt of the timing pulse to the next zero crossing of the single phase power supply received by the meter, the utility can determine the phase of the individual meter. The system can include a feeder meter connected to each phase of the electrical supply system to determine the energy consumption for each of the meters connected to a specific phase. The utility can compare the energy consumption information from the feeder meter to all of the load meters connected to the same phase to determine whether any energy theft is occurring.
A method of determining which phase of a three-phase power supply a load meter is connected to, the method comprising the steps of:
A method of monitoring the load on a three-phase power supply that provides power to a plurality of load meters each connected to one of three supply lines of the power distribution system, wherein each of the supply lines carries a different one of the three voltage phases, the method comprising the steps of:
A method of determining which phase of a three-phase power supply each of a plurality of load meters are connected to, the method comprising the steps of:
A system for determining the load on each phase of a three-phase power supply, comprising:
Dependencies are inferred from the claim text.