# US 2010/0071906 A1 · System and method for simultaneous sea drilling operations

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2010/0071906 A1
- Document ID: US20100071906A1
- Status: Published application
- Kind: A1
- Application number: 12/562,389
- Filed: 2009-09-18
- Published: 2010-03-25
- Earliest claimed: 2008-09-19
- Assignees: Petroleo Brasileiro S.A. - Petrobras
- Inventors: Roberto RODRIGUES
- Web page: https://patentgrep.com/patent/US20100071906A1

## CPC

- E21B 7/128: from floating support with independent underwater anchored guide base
- B63B 35/4413: {Floating drilling platforms, e.g. carrying water-oil separating devices}
- E21B 15/003: {adapted to be moved on their substructure, e.g. with skidding means; adapted to drill a plurality of wells}
- E21B 15/02: specially adapted for underwater drilling (E21B15/04 takes precedence)
- E21B 19/002: {specially adapted for underwater drilling (E21B19/09, E21B19/143 take precedence)}
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- B63B: SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING (arrangements of vessel ventilation, heating, cooling, or air-conditioning B63J2/00; floating substructures as supports of dredgers or soil-shifting machines E02F9/06)

## Abstract

A system and method for carrying out simultaneous operations of assembling, dismantling, and maintaining equipment installed by an oil rig, using the tools, systems, and the areas available on the rig itself. The system includes two parallel and separated sustaining beams and two mobile bases supported on the beams to carry out the simultaneous operations. This system allows a method for simultaneously assembling two items of subsea equipment which are to be installed to be performed. Also, this system allows a method for simultaneously replacing and assembling subsea equipment to be performed. Additionally, the equipment can be lowered or recovered using either a derrick and pipe string or a winch and steel cable.

## Claims

### Claim 1

A system for simultaneous execution of operations by a drilling rig or completion rig comprising:
at least two sustaining beams which are substantially parallel to and separated from each other, which are substantially parallel to the sea surface, and extend horizontally over an entire length of a moon pool;
a first mobile base which is supported on the at least two sustaining beams and can move horizontally over the at least two sustaining beams with the use of sliding elements; and
a second mobile base which is supported on the at least two sustaining beams and can move horizontally on the at least two sustaining beams with the use of sliding elements.

### Claim 2 (depends on 1)

The system according to claim 1, wherein the sliding elements are of a roller bearing type.

### Claim 3 (depends on 1)

The system according to claim 1, further comprising a derrick.

### Claim 4 (depends on 1)

A method for simultaneously assembling two items of subsea equipment using the system according to claim 1, comprising:
positioning the first mobile base, which is supported on the at least two sustaining beams, immediately below a rotary table at a first operating position;
positioning the second mobile base, which is supported on the at least two sustaining beams, at a second operating position which is horizontally separated from the first operating position;
simultaneously assembling an item of subsea equipment on the first mobile base with the help of a derrick while assembling subsea equipment on the second mobile base with the help of support tools;
lowering and installing the equipment assembled on the first mobile base with the help of the derrick using a pipe string;
horizontally moving the first mobile base away from the second operating position to an auxiliary operating position which is horizontally separated from the first operating position;
moving the second mobile base to the first operating position; and
lowering and installing the equipment assembled on the second mobile base, with the help of the derrick, using a pipe string.

### Claim 5 (depends on 1)

A method for replacing and simultaneously assembling subsea equipment using the system according to claim 1, comprising:
positioning the first mobile base, which is supported on the at least two sustaining beams, immediately below the rotary table at a first operating position;
positioning the second mobile base, which is supported on the at least two sustaining beams, at a second operating position which is horizontally separated from the first operating position;
raising an item of subsea equipment up to the first mobile base with the help of a pipe string in order to dismantle the equipment raised;
dismantling the equipment raised to the first mobile base, with the help of a derrick, and simultaneously assembling an item of subsea equipment on the second mobile base;
horizontally moving the first mobile base to an auxiliary operating position and moving the second mobile base to the first operating position; and
lowering and installing the equipment assembled on the second mobile base, with the help of the derrick, using a pipe string.

### Claim 6 (depends on 1)

A method for simultaneously assembling two items of subsea equipment using the system according to claim 1, comprising:
positioning the first mobile base, which is supported on the at least two sustaining beams, immediately below a rotary table at a first operating position;
positioning the second mobile base, which is supported on the at least two sustaining beams, at a second operating position which is horizontally separated from the first operating position;
simultaneously assembling an item of subsea equipment on the first mobile base with the help of a derrick while assembling subsea equipment on the second mobile base with the help of support tools;
lowering and installing the equipment assembled on the first mobile base with the help of the derrick using a pipe string; and
lowering and installing the equipment assembled on the second mobile base with the help of a winch.

### Claim 7 (depends on 1)

A method for replacing and simultaneously assembling subsea equipment using the system according to claim 1, comprising:
positioning the first mobile base, which is supported on the at least two sustaining beams, immediately below the rotary table at a first operating position;
positioning the second mobile base, which is supported on the at least two sustaining beams, at a second operating position which is horizontally separated from the first operating position;
raising an item of subsea equipment up to the first mobile base with the help of a pipe string in order to dismantle the equipment raised;
dismantling the equipment raised to the first mobile base, with the help of a derrick, and simultaneously assembling an item of subsea equipment on the second mobile base; and
lowering and installing the equipment assembled on the second mobile base with the help of a winch.