# US 2009/0276528 A1 · Methods to Optimally Allocating the Computer Server Load Based on the Suitability of Environmental Conditions

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2009/0276528 A1
- Document ID: US20090276528A1
- Status: Published application
- Kind: A1
- Application number: 12/435,388
- Filed: 2009-05-04
- Published: 2009-11-05
- Earliest claimed: 2008-05-05
- Assignees: Siemens Industry, Inc.
- Inventors: William Thomas Pienta; Pornsak Songkakul
- Web page: https://patentgrep.com/patent/US20090276528A1

## CPC

- G06F 1/206: {comprising thermal management}
- G06F 9/505: {considering the load}
- G06F 9/5094: {where the allocation takes into account power or heat criteria (power management in computers in general G06F1/3203; thermal management in computers in general G06F1/206)}
- H05K 7/20836: {Thermal management, e.g. server temperature control}
- Y02D 10/00: Energy efficient computing, e.g. low power processors, power management or thermal management
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- H05K: PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- Y02D: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE

## Abstract

A method includes generating a space information value for each of a plurality of spaces based on at least one environmental condition measurement for the corresponding space. Each space includes one or more computing devices. The space information value includes information regarding the relative suitability of a corresponding space for accepting computing load. The method also includes determining an allocation of additional computing load based on the space information values.

## Claims

### Claim 1

A method, comprising
a) generating a space information value for each of a plurality of spaces based on at least one environmental condition measurement for the corresponding space, each space including one or more computing devices, the space information value including information regarding the relative suitability of a corresponding space for accepting computing load, and
b) determining an allocation of additional computing load based on the space information values.

### Claim 2 (depends on 1)

The method of claim 1, further comprising:
obtaining at least one sensor measurement from a sensor disposed within each of the plurality of spaces, and wherein the at least one environmental condition measurement for each space is based on the at least one sensor measurement for the space.

### Claim 3 (depends on 1)

The method of claim 1, wherein step a) further comprises generating the space information value based at least in part on computing load information regarding the computing devices in each space.

### Claim 4 (depends on 1)

The method of claim 1, wherein step b) further comprises
b) selecting a first computing device for handling additional computing load from a plurality of computing devices based on an evaluation of the information regarding the relative suitability of a first space in which the first computing device is located and information regarding the relative suitability of other spaces.

### Claim 5 (depends on 1)

The method of claim 1, further comprising:
obtaining data identifying an association between each of a plurality of computer devices and a select one of the plurality of spaces; and wherein step b) further comprises determining the allocation of the additional computing load by allocating the additional computing load to computing devices associated with a first space based on the space information values of the first space and the other of the plurality of spaces.

### Claim 6 (depends on 5)

The method of claim 5, wherein step b) further comprises:
i) allocating more computing load to computing devices associated with one or more spaces having space information values representative of higher relative suitability; and
ii) allocating less computing load to computing devices associated with one or more spaces having space information values representative of lower relative suitability.

### Claim 7 (depends on 1)

The method of claim 1, further comprising:
c) providing updated space information values at a subsequent time based on new environmental information; and
d) determining a reallocation of at least some computing load based on the updated space information values.

### Claim 8 (depends on 7)

The method of claim 7, wherein determining the reallocation includes moving a process from a first computing device in a first space to a second computing device in a second space.

### Claim 9 (depends on 1)

The method of claim 1, wherein step a) further comprises:
generating the space information value for each of a plurality of spaces based on at least a temperature measurement value for the corresponding space.

### Claim 10 (depends on 9)

The method of claim 9, wherein step a) further comprises:
generating the space information value for each of a plurality of spaces based on at least one of the group consisting of: a humidity measurement value for the corresponding space, an air flow measurement value for the corresponding space, and a pressure measurement value for the corresponding space.

### Claim 11 (depends on 9)

The method of claim 9, wherein step a) further comprises:
generating the space information value for each of a plurality of spaces based in part on a current computing load value of computing devices located within the corresponding space.

### Claim 12 (depends on 11)

The method of claim 11, wherein step a) further comprises:
generating the space information value for each of a plurality of spaces based in part on a predictive computing load value of computing devices located within the corresponding space.

### Claim 13 (depends on 9)

The method of claim 9, wherein step a) further comprises:
generating the space information value for each of a plurality of spaces based in part on a predictive computing load value of computing devices located within the corresponding space.

### Claim 14 (depends on 1)

The method of claim 1, wherein step a) further comprises:
generating the space information value for each of a plurality of spaces based in part on a predictive computing load value of computing devices located within the corresponding space.

### Claim 15

An arrangement, comprising
a) a plurality of computing devices disposed in a plurality of spaces, such that each space includes one or more computing device;
b) a processing arrangement configured to
generate a space information value for each of a plurality of spaces based on at least one environmental condition measurement for the corresponding space, each space including one or more computing devices, the space information value including information regarding the relative suitability of a corresponding space for accepting computing load, and
determine an allocation of additional computing load based on the space information values.

### Claim 16 (depends on 15)

The arrangement of claim 15, wherein the processing arrangement includes a first processor configured to generate the space information value and a second processor configured to determine the allocation of additional computing load.

### Claim 17 (depends on 16)

The arrangement of claim 16, further comprising:
at least one sensor disposed within each of the plurality of spaces, and
wherein the first processor is further configured to obtain at least one sensor measurement from the at least one sensor disposed within each of the plurality of spaces, and wherein the at least one environmental condition measurement for each space is based on the at least one sensor measurement for the space.

### Claim 18 (depends on 15)

The arrangement of claim 15, further comprising:
at least one sensor disposed within each of the plurality of spaces, and
wherein the processing arrangement is further configured to obtain at least one sensor measurement from the at least one sensor disposed within each of the plurality of spaces, and wherein the at least one environmental condition measurement for each space is based on the at least one sensor measurement for the space.

### Claim 19 (depends on 15)

The arrangement of claim 15 wherein the processing arrangement is configured to select a first computing device for handling additional computing load from a plurality of computing devices based on an evaluation of the information regarding the relative suitability of a first space in which the first computing device is located and information regarding the relative suitability of other spaces.

### Claim 20 (depends on 15)

The arrangement of claim 15 wherein the processing arrangement is configured to obtaining data identifying an association between each of a plurality of computer devices and a select one of the plurality of spaces; and to determine the allocation of the additional computing load by allocating the additional computing load to computing devices associated with a first space based on the space information values of the first space and the other of the plurality of spaces.
