# US 2009/0276261 A1 · Assessment method for process improvement decisions

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2009/0276261 A1
- Document ID: US20090276261A1
- Status: Published application
- Kind: A1
- Application number: 12/164,534
- Filed: 2008-06-30
- Published: 2009-11-05
- Earliest claimed: 2008-05-05
- Assignees: Inotera Memories, Inc.
- Inventors: SHIH-LUNG CHEN
- Web page: https://patentgrep.com/patent/US20090276261A1

## CPC

- G06Q 10/06: Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q 10/0635: Risk analysis of enterprise or organisation activities
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

A risk assessment method for process improvement decisions applying for semiconductor process change comprises: performing a risk assessment evaluation to compute a polarity (plurality?) of items corresponding to their values, generating a risk assessment evaluation value to determine if the risk assessment evaluation value is in a risk setting value, go to next two steps; not, go to next step; performing an active inspect for the polarity (plurality?) of items corresponding to their item setting values, if not satisfied with the active inspect, repeat the above step; if not, transferring the semiconductor process change to online process.

## Claims

### Claim 1

An assessment method for process improvement decisions which is applicable to a semiconductor process change, comprising the following steps:
performing a risk assessment evaluation computation for a plurality of items each with a corresponding value, wherein the product of the corresponding value is for generating a risk assessment evaluation value;
comparing and determining whether the risk assessment evaluation value has exceeded a predetermined risk value or not, if not, then go to the final step of transferring the semiconductor process change to assembly line process;
if yes, then performing an active inspection for the corresponding values of the plurality of items against their respective predetermined item setting values, in order to determine if the predetermined item setting values has been exceeded or not;
next, if the predetermined item setting values has been exceeded, repeat the above step of risk assessment evaluation value comparison; otherwise
if the predetermined item setting values has not been exceeded, then go to the final step of transferring the semiconductor process change to online process.

### Claim 2 (depends on 1)

The assessment method for process improvement decisions according to claim 1, wherein the said plurality of items consist of at least an EXPERIENCE, an INFLUENCE AREA and an AGGRESSIVE CHECK POINT.

### Claim 3 (depends on 2)

The assessment method for process improvement decisions according to claim 2, wherein the said EXPERIENCE includes:
QD ECN (Quality Design with Engineering Change Note: there exist other factories of the same category);
QD PILOT/IMI SWR (Quality Design Pilot/Incoming Material Inspection of Semiconductor Wafer Representation: batch experiment in median/small quantity during experiment);
SUPPORTING ANALYSIS; or
NO EXPERIENCE.

### Claim 4 (depends on 3)

The assessment method for process improvement decisions according to claim 3, wherein the value to which the EXPERIENCE corresponds is a confidence value, and which confidence value is sequentially 1, 2, 3 and 4.

### Claim 5 (depends on 2)

The assessment method for process improvement decisions according to claim 2, wherein the INFLUENCE AREA includes WAT (Wafer Acceptance Test: electronic analysis), FE (front-end), BE (back-end) or RELIABILITY.

### Claim 6 (depends on 5)

The assessment method for process improvement decisions according to claim 5, wherein the value to which the INFLUENCE AREA corresponds is a coverage value, and which coverage value is sequentially 1, 2, 3 and 4.

### Claim 7 (depends on 2)

The assessment method for process improvement decisions according to claim 2, wherein the Aggressive Check Point consists of INLINE INSPECTION (assembly line check), WAT (Wafer Acceptance Test: electronic analysis), FE (front-end) or BE/ELT (back-end/essential laboratory test: client side).

### Claim 8 (depends on 7)

The assessment method for process improvement decisions according to claim 7, wherein the value to which the Aggressive Check Point corresponds is a criteria value, and which criteria value is sequentially 1, 2, 3 and 4.

### Claim 9 (depends on 1)

The assessment method for process improvement decisions according to claim 1, wherein the said predetermined risk value and item setting value can be determined either manually by a user, or else automatically set by a computer.

### Claim 10

An assessment method for process improvement decisions which is applicable to a semiconductor process change, comprising the following steps:
classifying the plurality of items concerning the semiconductor process change;
performing a risk assessment evaluation computation for a plurality of items each with a corresponding value;
generating a risk assessment evaluation value, wherein the risk assessment evaluation value is the product of the corresponding values;
comparing and determining whether the risk assessment evaluation value has exceeded a predetermined risk value or not, if not, then go to the final step of transferring the semiconductor process change to assembly line process;
if yes, then performing an active inspection for the corresponding values of the plurality of items against their respective predetermined item setting values, in order to determine if the predetermined item setting values has been exceeded or not;
next, if the predetermined item setting values has been exceeded, repeat the above step of risk assessment evaluation value comparison;
otherwise if the predetermined item setting values has not been exceeded, then go to the final step of transferring the semiconductor process change to online process.

### Claim 11 (depends on 10)

The assessment method for process improvement decisions according to claim 10, wherein the said plurality of items consist of at least an EXPERIENCE, an INFLUENCE AREA and an AGGRESSIVE CHECK POINT.

### Claim 12 (depends on 11)

The assessment method for process improvement decisions according to claim 11, wherein the said EXPERIENCE includes:
QD ECN (Quality Design with Engineering Change Note: there exist other factories of the same category);
QD PILOT/IMI SWR (Quality Design PILOT/Incoming Material Inspection of Semiconductor Wafer Representation: batch experiment in median/small quantity during experiment);
SUPPORTING ANALYSIS; or
NO EXPERIENCE.

### Claim 13 (depends on 12)

The assessment method for process improvement decisions according to claim 12, wherein the value to which the EXPERIENCE corresponds is a confidence value, and which confidence value is sequentially 1, 2, 3 and 4.

### Claim 14 (depends on 11)

The assessment method for process improvement decisions according to claim 11, wherein the INFLUENCE AREA includes WAT (Wafer Acceptance Test: electronic analysis), FE (front-end), BE (back-end) or RELIABILITY.

### Claim 15 (depends on 14)

The assessment method for process improvement decisions according to claim 14, wherein the value to which the INFLUENCE AREA corresponds is a coverage value, and which coverage value is sequentially 1, 2, 3 and 4.

### Claim 16 (depends on 11)

The assessment method for process improvement decisions according to claim 11, wherein the Aggressive Check Point consists of INLINE INSPECTION (assembly line check), WAT (Wafer Acceptance Test: electronic analysis), FE (front-end) or BE/ELT (back-end/essential laboratory test: client side).

### Claim 17 (depends on 16)

The assessment method for process improvement decisions according to claim 16, wherein the value to which the Aggressive Check Point corresponds is a criteria value, and which criteria value is sequentially 1, 2, 3 and 4.

### Claim 18 (depends on 10)

The assessment method for process improvement decisions according to claim 10, wherein the said predetermined risk value and item setting value can be determined either manually by a user, or else automatically set by a computer.