# US 2009/0269497 A1 · Built-up composite structures with a graded coefficient of thermal expansion for extreme environment applications

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2009/0269497 A1
- Document ID: US20090269497A1
- Status: Published application
- Kind: A1
- Application number: 12/110,595
- Filed: 2008-04-28
- Published: 2009-10-29
- Earliest claimed: 2008-04-28
- Assignees: The Boeing Company
- Inventors: Ali Yousefiani; John G. Vollmer; Michael L. Hand; John M. Comfort
- Web page: https://patentgrep.com/patent/US20090269497A1

## CPC

- B22F 3/115: by spraying molten metal, i.e. spray sintering, spray casting
- B22F 5/009: {of turbine components other than turbine blades (of turbine blades B22F5/04)}
- B22F 7/08: with one or more parts not made from powder {(B22F7/062 takes precedence)}
- C23C 4/04: characterised by the coating material
- C23C 28/021: {including at least one metal alloy layer}
- C23C 28/023: {only coatings of metal elements only}
- C23C 28/028: {Including graded layers in composition or in physical properties, e.g. density, porosity, grain size}
- F02K 1/00: Plants characterised by the form or arrangement of the jet pipe or nozzle; Jet pipes or nozzles peculiar thereto (rocket nozzles F02K9/97)
- F02K 1/78: Other construction of jet pipes
- F02K 9/34: Casings; Combustion chambers; Liners thereof
- B22F 10/25: Direct deposition of metal particles, e.g. direct metal deposition [DMD] or laser engineered net shaping [LENS]
- B22F 10/28: Powder bed fusion, e.g. selective laser melting [SLM] or electron beam melting [EBM]
- B22F 2999/00: Aspects linked to processes or compositions used in powder metallurgy
- B33Y 50/00: Data acquisition or data processing for additive manufacturing
- F05D 2300/21: Oxide ceramics
- F05D 2300/50212: dissimilar
- F05D 2300/603: Composites; e.g. fibre-reinforced
- Y02P 10/25: Process efficiency
- Y10T 29/49616: Structural member making
- Y10T 428/12611: Oxide-containing component
- B22F: WORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER (making alloys by powder metallurgy C22C); APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
- C23C: COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL (making metal-coated products by extrusion B21C23/22; covering with metal by connecting pre-existing layers to articles, see the relevant places, e.g. B21D39/00, B23K; metallising of glass C03C; metallising mortars, concrete, artificial stone, ceramics or natural stone C04B41/00; enamelling of, or applying a vitreous layer to, metals C23D; treating metal surfaces or coating of metals by electrolysis or electrophoresis C25D; single-crystal film growth C30B; by metallising textiles D06M11/83; decorating textiles by locally metallising D06Q1/04)
- F02K: JET-PROPULSION PLANTS (features of jet-propulsion plants common to gas-turbine plants, air intakes or fuel supply control of air-breathing jet-propulsion plants F02C7/00, F02C9/00)
- B33Y: ADDITIVE MANUFACTURING, i.e. MANUFACTURING OF THREE-DIMENSIONAL [3D] OBJECTS BY ADDITIVE DEPOSITION, ADDITIVE AGGLOMERATION OR ADDITIVE LAYERING, e.g. BY 3D PRINTING, STEREOLITHOGRAPHY OR SELECTIVE LASER SINTERING
- F05D: INDEXING SCHEME FOR ASPECTS RELATING TO NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES, GAS-TURBINES OR JET-PROPULSION PLANTS
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y10T: TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION

## Abstract

An integrated composite structure with a graded coefficient of thermal expansion (CTE) is formed by selecting a plurality of layers of materials with a graded CTE and using build-up (bottom-up) fabrication approaches such as metal deposition or powder metallurgy to produce a CTE-graded layered composite preform, which is then consolidated and heat treated to create the CTE graded integrated composite billet or near net shape. The integrated composite billet or near net shape is then processed to produce a first surface for attachment of a first structural member having a first CTE and to produce a second surface of for attachment of a second structural member having a second CTE.

## Claims

### Claim 1

A method for producing an integrated composite interface with a graded coefficient of thermal expansion (CTE) comprising the steps of:
selecting a plurality of layers of graded CTE;
building up the layers to form a CTE graded integrated composite; and,
processing the integrated composite to produce a first surface for attachment of a first structural member having a first CTE and to produce a second surface for attachment of a second structural member having a second CTE.

### Claim 2 (depends on 1)

The method of claim 1 wherein the step of building up the layers comprises the step of metal deposition.

### Claim 3 (depends on 1)

The method of claim 1 wherein the step of building up the layers employs powder metallurgy processing.

### Claim 4 (depends on 1)

The method of claim 1 wherein the step of selecting a plurality of layers comprises selecting layers from the group of Kovar, Alloy 42, Alloy 48, 15-5 PH and Inconel 718.

### Claim 5 (depends on 1)

The method of claim 1 wherein the step of building up layers provides a graded CTE billet and the step of processing further comprises the step of machining the billet to provide a strip with orthogonal interfaces between layers.

### Claim 6 (depends on 1)

The method of claim 1 wherein the step of building up layers provides a graded CTE billet and the step of processing further comprises the step of machining the billet to provide a strip with inclined interfaces between layers.

### Claim 7 (depends on 1)

The method of claim 1 wherein the step of building up layers provides a graded CTE billet and the step of processing further comprises the steps of:
machining the billet to produce a preliminary shape,
expanding the preliminary shape, and
rolling the expanded shape to form a near net shape attachment ring.

### Claim 8 (depends on 2)

The method of claim 2 wherein the step of metal deposition comprises thermal spray processing with plasma spray torch having a powder feed and further comprising the steps of:
providing a rotating mandrel;
applying predetermined material compositions to the mandrel in axial layers to create an attachment ring; and,
tailoring of material feed to create a scarfed interface between the axial layers.

### Claim 9

The method defined in step 8 further comprising the step of hot isostatic pressing (HIP) the CTE-graded integrated composite.

### Claim 10 (depends on 2)

The method of claim 2 wherein the step of metal deposition further comprises the step of selecting a metal deposition process from the set of laser assisted near net shape manufacturing, laser sintering, spray forming or thermal spray forming.

### Claim 11

A method for producing an integrated composite interface with a graded coefficient of thermal expansion (CTE) comprising the steps of:
using powder metallurgy to produce a CTE graded preform;
consolidating the preform;
heat treating the consolidated preform to create a CTE graded integrated composite billet; and,
forming the billet to provide a first surface for attachment of a first structural member having a first CTE and a second surface of for attachment of a second structural member having a second CTE.

### Claim 12 (depends on 11)

The method of claim 11 wherein the step of consolidating comprises hot isostatic pressing.

### Claim 13

A method for producing an integrated composite interface with a graded coefficient of thermal expansion (CTE) comprising the steps of:
using powder metallurgy to produce a CTE graded preform in near net shape;
consolidating the preform;
heat treating the consolidated preform to create a CTE graded near net shape component; and,
forming the component to provide a first surface for attachment of a first structural member having a first CTE and a second surface of for attachment of a second structural member having a second CTE.

### Claim 14 (depends on 13)

The method of claim 13 wherein the step of consolidating comprises hot isostatic pressing;

### Claim 15

A method for producing an aerospace structure with an integrated composite interface with a graded coefficient of thermal expansion (CTE) joining structural members with highly different CTE comprising the steps of:
identifying an extreme environment application for attachment of a first member and second member;
determining a connecting component design for a CTE-graded composite including determining the attachment methodology from the CTE-graded composite to the first member and to the second member
conducting a thermomechanical analysis including evaluating the temperature dependent CTE properties of each member to determine the level of CTE mismatch accommodation required by the structure; evaluating the level of heating/cooling temperature gradients encountered during service and, analyzing the thermomechanical loading conditions in the assembly;
conducting material selection for the graded CTE composite;
choosing a build-up fabrication technique;
determining a local interface design for layers in the CTE composite;
building up a CTE-graded member using layers of differing CTE materials employing the selected materials, fabrication technique and local interface design;
performing secondary processing; and,
assembling the first member and second member to the CTE graded component.

### Claim 16 (depends on 15)

The method of claim 15 wherein the step of building up the CTE-graded member comprises laser assisted metal deposition to produce a near net shape CTE-graded composite.

### Claim 17 (depends on 16)

The method of claim 16 wherein the step of determining a local interface design comprises the step of:
providing interlayers between first and second adjacent layers with a first interlayer having a material composition of about 75% of the material of the first adjacent layer and about 25% of the material of the second adjacent layer, a second interlayer having a material composition of about 50% of the material of the first adjacent layer and about 50% of the material of the second adjacent layer and a third interlayer having a material composition of about 25% of the material of the first adjacent layer and about 75% of the material of the second adjacent layer.

### Claim 18 (depends on 15)

The method of claim 15 wherein the step of building up the CTE-graded member comprises the steps of:
employing powder metallurgy processing to create a CTE graded directly billet;
machining the billet to form a starting component;
hot rolling the starting component to near net shape; and,
chemical machining end features to match requirements for a bolted attachment to the first member and the second member.

### Claim 19 (depends on 18)

The method of claim 18 wherein the step of determining a local interface design comprises the steps of:
providing an interlayer between each two adjacent layers comprising a plurality of alternating layers of each material of the two adjacent layers.

### Claim 20

An aircraft engine structure comprising:
a ceramic matrix composite nozzle;
an Inconel 718 superalloy flange; and
an integrated composite interface interconnecting the nozzle and flange and having a graded coefficient of thermal expansion (CTE), said interface formed by
powder metallurgy processing a billet with graded chemistry corresponding to the desired CTE gradation;
machining a starting component from the CTE graded billet;
hot ring rolling the component for further consolidation, machining a bolt interface for mating to the composite nozzle, and
machining a bolt interface for mating to the flange.

### Claim 21

A rocket engine assembly comprising:
ceramic matrix composite chamber;
a titanium injector;
an integrated composite interface joining the chamber and injector and having a graded coefficient of thermal expansion (CTE), said interface formed by
metal deposition processing to form the interface;
hot isostatic pressing of the interface; and,
machining attachments for joining the interface to the chamber and injector.

### Claim 22 (depends on 21)

The rocket engine assembly of claim 21 wherein the metal deposition is chosen from the set of laser assisted near net shape manufacturing, laser sintering, spray forming or thermal spray forming.

### Claim 23 (depends on 21)

The rocket engine assembly of claim 21 wherein the metal deposition process provides a composite interface having a first layer of titanium, a second layer of Alloy 42 and a third layer of Kovar.

### Claim 23 (depends on 20)

The rocket engine assembly of claim 20 wherein the metal deposition process includes
material feed for interface layering of 75% Alloy 42 and 25% Kovar, second transition layering of 50% Alloy 42 and 50% Kovar, and a third transition layering of 75% Kovar and 25% Alloy 42 intermediate the Alloy 42 layer and the Kovar layer.
