# US 2009/0269206 A1 · Process for building up an edge of a machine component, and machine component remanufacturing strategy

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2009/0269206 A1
- Document ID: US20090269206A1
- Status: Published application
- Kind: A1
- Application number: 12/150,246
- Filed: 2008-04-25
- Published: 2009-10-29
- Earliest claimed: 2008-04-25
- Assignees: Caterpillar Inc.
- Inventors: Alexei Yelistratov; Marion Grant
- Web page: https://patentgrep.com/patent/US20090269206A1

## CPC

- F01D 5/005: {Repairing methods or devices}
- B23K 26/342: Build-up welding
- B23P 6/007: {using only additive methods, e.g. build-up welding}
- B23K 35/0261: {Rods, electrodes or wires}
- B23K 2101/001: {Turbines}
- F05D 2230/30: with deposition of material
- F05D 2230/80: Repairing, retrofitting or upgrading methods
- F05D 2240/121: related to the leading edge of a stator vane
- F05D 2240/303: related to the leading edge of a rotor blade
- Y10T 428/12396: Discontinuous surface component
- F01D: NON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES (machines or engines for liquids F03; non-positive displacement pumps F04D)
- B23K: SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23P: METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS (arrangements for copying or controlling B23Q)
- F05D: INDEXING SCHEME FOR ASPECTS RELATING TO NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES, GAS-TURBINES OR JET-PROPULSION PLANTS
- Y10T: TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION

## Abstract

A process for building up a leading edge of a machine component such as a leading edge of a turbine blade for a turbocharger includes forming a molten pool along the edge of the machine component, feeding a filler material in a solid state into the molten pool and melting the filler material via heat transfer between the molten pool and the filler material. A solid layer may be formed along the leading edge by cooling the molten pool. The process is applicable to remanufacturing damaged machine components having a plurality of blades with relatively thin leading edges.

## Claims

### Claim 1

A process for building up an edge of a machine component comprising the steps of:
forming a molten pool of a first material along the edge of the machine component by melting the machine component via a laser;
feeding a second material comprising a filler material in a solid state into the molten pool;
melting the second material within the molten pool via heat transfer with the molten pool; and
forming a solid layer comprising a mixture of the first material and the second material along the edge of the machine component by cooling the molten pool.

### Claim 2 (depends on 1)

The process of claim 1 wherein the step of forming a molten pool comprises a step of applying a beam of a diode laser to the edge of the machine component, and wherein the step of feeding a second material further comprises feeding a wire into the molten pool.

### Claim 3 (depends on 2)

The process of claim 2 wherein the step of applying a beam of a diode laser comprises locating a beam spot of the beam on the edge of the machine component, and wherein the step of feeding a second material comprises feeding the wire into a portion of the molten pool which is not within the beam spot.

### Claim 4 (depends on 3)

The process of claim 3 wherein the step of feeding a second material further comprises feeding the wire into the molten pool without contacting a bottom of the molten pool.

### Claim 5 (depends on 3)

The process of claim 3 wherein the step of applying a beam further comprises applying a flat beam having a rectangular beam spot and orienting the rectangular beam spot longitudinally along the edge of the machine component, the process further comprising a step of moving the beam spot longitudinally relative to the edge of the machine component during the forming step and during the feeding step.

### Claim 6 (depends on 5)

The process of claim 5 wherein the step of feeding the second material comprises feeding the wire into the molten pool ahead of the beam spot during moving the beam spot.

### Claim 7 (depends on 7)

The process of claim 7 wherein the step of forming a solid layer comprises building up the edge of the machine component via a first solid layer, the process further comprising a step of further building up the edge via a plurality of additional solid layers.

### Claim 8 (depends on 7)

The process of claim 7 comprising a process for building up a leading edge of a turbine blade, wherein the step of forming a solid layer comprises forming a first solid layer having a first width and wherein the step of further building up the edge includes forming a second solid layer having a second, relatively lesser width.

### Claim 9 (depends on 8)

The process of claim 8 further comprising a step of oscillating the beam spot back and forth across a width of the edge of the machine component during forming a first solid layer.

### Claim 10

A method of remanufacturing a machine component having a leading edge comprising the steps of:
receiving a machine component removed from service having a leading edge which defines a leading edge contour different from a specified contour; and
returning the leading edge contour to the specified contour at least in part via the steps of forming a molten pool of a first material along the leading edge of the machine component by melting the machine component via a laser, feeding a second material comprising a filler material in a solid state into the molten pool, melting the second material within the molten pool via heat transfer with the molten pool and forming a solid layer comprising a mixture of the first material and the second material along the leading edge by cooling the molten pool.

### Claim 11 (depends on 10)

The method of claim 10 wherein the machine component comprises a rotatable element having a plurality of blades, and wherein the receiving step comprises receiving a rotatable element having at least one damaged blade which defines the leading edge contour different from the specified contour.

### Claim 12 (depends on 11)

The method of claim 11 further comprising a step of preparing the leading edge prior to the step of returning the leading edge contour to a specified contour, including removing damaged material of the at least one damaged blade.

### Claim 13 (depends on 12)

The method of claim 12 wherein the step of forming a molten pool comprises applying a flat beam of a diode laser to the leading edge of the machine component, including locating a rectangular beam spot of the flat beam on the leading edge of the machine component, and wherein the step of melting the second material within the molten pool comprises feeding a wire into a portion of the molten pool which is not within the rectangular beam spot.

### Claim 14 (depends on 13)

The method of claim 13 wherein the step of forming a solid layer comprises forming a first solid layer and the step of returning the leading edge contour to the specified contour comprises building up the leading edge via the first solid layer, the step of returning the leading edge contour to the specified contour further comprising building up the leading edge via forming a plurality of additional solid layers along the leading edge.

### Claim 15 (depends on 14)

The method of claim 14 wherein the method comprises a method of remanufacturing a turbocharger, and further comprising the steps of returning a plurality of leading edges of a plurality of damaged blades of a damaged turbine wheel for the turbocharger to the specified contour, then reassembling the turbine wheel with a turbocharger housing.

### Claim 16

A machine component remanufactured according to a process comprising the steps of:
receiving a machine component having a leading edge which defines a leading edge contour different from a specified contour; and
returning the leading edge contour to the specified contour at least in part via the steps of forming a molten pool of a first material along the leading edge of the machine component by melting the machine component via a laser, feeding a second material comprising a filler material in a solid state into the molten pool, melting the second material within the molten pool via heat transfer with the molten pool and forming a solid layer comprising a mixture of the first material and the second material along the leading edge by cooling the molten pool.

### Claim 17 (depends on 16)

The machine component of claim 16 wherein the step of forming a solid layer comprises forming a first solid layer and the step of returning the leading edge contour to the specified contour comprises building up the leading edge via the first solid layer, the step of returning the leading edge contour to the specified contour further comprising building up the leading edge via forming a plurality of additional solid layers along the leading edge.

### Claim 18 (depends on 17)

The machine component of claim 17 comprising a turbine wheel for a turbocharger having a plurality of turbine blades.

### Claim 19 (depends on 18)

The machine component of claim 18 wherein the receiving step further comprises receiving a turbine wheel having a plurality of damaged turbine blades each defining a leading edge contour different from the specified contour, the process further comprising a step of returning the leading edge contour of each one of the damaged turbine blades to the specified contour.
