# US 2009/0269140 A1 · Multi-Planar Gas Recovery Bioreactor

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2009/0269140 A1
- Document ID: US20090269140A1
- Status: Published application
- Kind: A1
- Application number: 12/193,863
- Filed: 2008-08-19
- Published: 2009-10-29
- Earliest claimed: 2008-04-28
- Assignees: Waste Management, Inc.
- Inventors: Gary R. Hater; Kevin M. Mieczkowski; Roger Green; John A. Barbush
- Web page: https://patentgrep.com/patent/US20090269140A1

## CPC

- B09B 1/00: Dumping solid waste
- B09B 1/006: {Shafts or wells in waste dumps}
- B09B 3/60: Biochemical treatment, e.g. by using enzymes
- B09B 3/65: Anaerobic treatment
- Y02W 30/30: Landfill technologies aiming to mitigate methane emissions
- Y02W 30/40: Bio-organic fraction processing; Production of fertilisers from the organic fraction of waste or refuse
- B09B: DISPOSAL OF SOLID WASTE NOT OTHERWISE PROVIDED FOR
- Y02W: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT

## Abstract

A bioreactor including one or more features that improve bioreactor liquid infiltration and gas recovery including a porous material layer having a layer of first porous material including a trench, a second porous material located in the trench and extending beyond the top surface of the layer of first porous material and perforated gas recovery piping located in the second porous material.

## Claims

### Claim 1

A bioreactor comprising:
a compostable material; and
at least one bioreactor cell located in the compostable material wherein the bioreactor cell further comprises:
a porous material layer having a length X, a width Y, a bottom surface and a top surface and at least one trench;
a second porous material located in the first porous material at least one trench, the second porous material extending out of the at least one trench and above the top of the first porous material layer; and
at least one perforated gas collection pipe that is located in and substantially covered by the second porous material.

### Claim 2 (depends on 1)

The bioreactor of claim 1 wherein the at least one perforated gas collection pipe is located in the second porous material at a position corresponding to about the top surface of the first porous material layer.

### Claim 3 (depends on 1)

The bioreactor of claim 1 wherein a compostable material lies below the first porous material layer.

### Claim 4 (depends on 1)

The bioreactor of claim 1 wherein the at least one trench in the first porous material has a length corresponding to the length of a perforated portion of the perforated gas collection pipe and wherein all of the perforated portion lies in a second porous material a portion of which is located in the trench.

### Claim 5 (depends on 1)

The bioreactor of claim 1 wherein sensors selected from thermocouples and pressure sensor are located in the second porous material.

### Claim 6 (depends on 1)

The bioreactor of claim 1 wherein the first porous material and the second porous material are each selected from tire chips, gravel, stone, wood chips, glass, cullet, tire chips, selected construction and demolition debris, or any combination thereof.

### Claim 7 (depends on 5)

The bioreactor of claim 5 wherein the first porous material and the second porous material are different materials.

### Claim 8 (depends on 7)

The bioreactor of claim 7 wherein the first porous material is tire chips and the second porous material is gravel.

### Claim 9 (depends on 1)

The bioreactor of claim 1 wherein the first porous material layer has a depth ranging from about 12 inches to about 4 feet or more.

### Claim 10 (depends on 1)

The bioreactor of claim 1 wherein the first porous material layer is sloped from about 0.5 degrees to about 10 degrees from horizontal.

### Claim 11 (depends on 1)

A landfill including at least one bioreactor of claim 1 wherein the first porous material layer has a length X of from about 100 feet to about 1000 feet and a width Y of from about 60 feet to about 1000 feet.

### Claim 12 (depends on 1, 11)

The landfill of claim 11 including at least two bioreactors of claim 1 wherein the bioreactors are vertically separated by a layer of compostable material having a depth of from about 50 feet to about 150 feet.

### Claim 13 (depends on 11)

The landfill of claim 11 wherein the bioreactor does not include a covering barrier material.

### Claim 14

A bioreactor comprising:
a compostable material; and
at least one bioreactor cell located in the compostable material wherein the bioreactor cell further comprises:
a porous material layer having a bottom surface and a top surface;
two or more perforated gas collection pipe located in the material layer wherein the two or more gas collection pipes are essentially parallel to one another and wherein each of the two or more perforated gas collection pipes include an outlet; and
at least one gas riser that is associated with the outlet of at least two perforated gas collection pipes.

### Claim 15 (depends on 14)

The bioreactor of claim 14 wherein the porous gas recovery material layer is sloped from about 0.5 degrees to about 10 degrees from horizontal.

### Claim 16 (depends on 15)

The bioreactor of claim 15 wherein the porous gas recovery material layer has a high point and wherein the porous gas recovery material layer has a first portion that is sloped in a first direction and a second portion that is sloped in a second direction.

### Claim 17 (depends on 16)

The bioreactor of claim 16 wherein the first portion and second portion of the porous gas recovery material layer is sloped from about 0.5 to about 10 degrees below horizontal.

### Claim 18 (depends on 17)

The bioreactor of claim 17 wherein the slope ranges from about 0.5 to about 3 degrees below horizontal.

### Claim 20 (depends on 14)

A landfill including at least one bioreactor of claim 14.

### Claim 21 (depends on 1, 20)

The landfill of claim 20 including two bioreactors of claim 1 wherein the bioreactors are vertically separated by a layer of compostable material.

### Claim 22

A bioreactor comprising:
a compostable material; and
at least one sloped bioreactor cell located in the compostable material wherein the bioreactor cell has a first end and a second end wherein the first end lies above the second end; and
a leachate drain located at the bioreactor second end and including a trench, at least one leachate collection pipe located in the trench, a first porous material located in the trench and a second porous material covering the trench.

### Claim 23 (depends on 20)

The bioreactor of claim 20 wherein second porous material is mounded above the leachate drain.

### Claim 24 (depends on 20)

The bioreactor of claim 20 wherein the first porous material and the second porous material are each selected from tire chips, gravel, stone, wood chips, glass, cullet, tire chips, selected construction and demolition debris, or any combination thereof.

### Claim 25 (depends on 24)

The bioreactor of claim 24 wherein the first porous material and the second porous material are different materials.

### Claim 26 (depends on 24)

The bioreactor of claim 24 wherein the first porous material is gravel and the second porous material is tire chips.

### Claim 27 (depends on 20)

The bioreactor of claim 20 wherein the at least one leachate collection pipe is a horizontal perforated pipe.

### Claim 28

A method for constructing a landfill bioreactor comprising the steps of:
a. placing a layer of compostable material in a landfill;
b. locating a layer of a first porous material on top of the compostable material layer;
c. removing a portion of the first porous material from the porous material layer to form at least one trench;
d placing a second porous material into the at least one trench;
e. placing a gas collection pipe on top of the second porous material;
and
f. covering the gas collection pipe with additional second porous material to form a second porous material covered gas collection pipe.

### Claim 29 (depends on 30)

The method of claim 30 wherein the second porous material is placed in the trench in step d in an amount sufficient to bring to fill the trench with second porous material such that a top surface of the second porous material and the top surface of the first porous material layer are essentially co-planar.

### Claim 30 (depends on 29)

The method of claim 29 wherein one or more sensors are located in the trench before the trench is completely filled with second porous material.
