# US 2009/0269135 A1 · Coquina Based Underwater Mitigation Reef and Method of Making Same

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2009/0269135 A1
- Document ID: US20090269135A1
- Status: Published application
- Kind: A1
- Application number: 12/432,321
- Filed: 2009-04-29
- Published: 2009-10-29
- Earliest claimed: 2008-04-29
- Inventors: Louis Arvai; Charles Chase
- Web page: https://patentgrep.com/patent/US20090269135A1

## CPC

- E02B 3/04: Structures or apparatus for, or methods of, protecting banks, coasts, or harbours ({E02B1/003 takes precedence;} sealing or joints E02B3/16 )
- A01K 61/70: Artificial fishing banks or reefs
- B28B 19/0053: {to tiles, bricks or the like}
- B28B 23/0012: {Producing brick netting}
- C02F 3/10: Packings; Fillings; Grids (packing elements in general B01J19/30, B01J19/32)
- E02B 3/129: {Polyhedrons, tetrapods or similar bodies, whether or not threaded on strings}
- Y02A 40/81: Aquaculture, e.g. of fish
- Y02W 10/10: Biological treatment of water, waste water, or sewage
- E02B: HYDRAULIC ENGINEERING (ship-lifting E02C; dredging E02F)
- A01K: ANIMAL HUSBANDRY; AVICULTURE; APICULTURE; PISCICULTURE; FISHING; REARING OR BREEDING ANIMALS, NOT OTHERWISE PROVIDED FOR; NEW BREEDS OF ANIMALS
- B28B: SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER (foundry moulding B22C; working stone or stone-like material B28D; shaping of substances in a plastic state, in general B29C; making layered products not composed wholly of these substances B32B)
- C02F: TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE (separation in general B01D; special arrangements on waterborne vessels of installations for treating water, waste water or sewage, e.g. for producing fresh water, B63J; adding materials to water to prevent corrosion C23F; treating radioactively-contaminated liquids G21F9/04; regeneration of reactants for recirculation into processes, see the relevant places for the processes)
- Y02A: TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02W: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT

## Abstract

A method of forming a concrete block embedded with coquina stone comprising the steps of positioning a layer of sand on the bottom surface of a concrete block form, then positioning a layer of coquina stone above the layer of sand positioned on the bottom surface, then pouring concrete over the layer of sand and the layer of coquina stone, thereafter allowing the concrete to harden to form a concrete block which is then removed from the concrete block form.

## Claims

### Claim 1

A method of forming a concrete block embedded with coquina stone comprising the steps of:
positioning a layer of sand on a bottom surface of concrete block form;
positioning a layer of coquina stone above the layer of sand positioned on the bottom surface;
pouring concrete over the layer of sand and the layer of coquina stone;
allowing the concrete to harden to form a concrete block;
removing the concrete block from the concrete block form.

### Claim 2 (depends on 1)

The method of claim 1, wherein the layer of sand is approximately one inch deep.

### Claim 3 (depends on 2)

The method of claim 2, wherein the layer of coquina stone is approximately one to two inches deep.

### Claim 4 (depends on 1)

The method of claim 1, further including the step, prior to the step of pouring the concrete, of positioning a rope or cable within the concrete block form that extends from a point within the concrete block form to a point outside the concrete block form.

### Claim 5 (depends on 4)

The method of claim 4, wherein the cable or rope extends through two sidewalls of the concrete block form.

### Claim 6 (depends on 5)

The method of claim 5, wherein the cable or rope is comprised of polyester.

### Claim 7

A method of making a mat of cable concrete including a plurality of concrete blocks embedded with coquina stone, comprising the steps of:
preparing a plurality of concrete block forms to be poured with concrete;
positioning a layer of sand on a bottom surface of the plurality of concrete block forms;
positioning a layer of coquina stone above the layer of sand positioned on the bottom surface of the concrete block forms;
positioning a rope or cable within the plurality of concrete block forms that extends from a point within the concrete block forms to a point outside the concrete block forms;
pouring concrete over the layer of sand and the layer of coquina stone and the rope or cable in the plurality concrete block forms;
allowing the concrete to harden to form a plurality of concrete blocks;
removing the concrete blocks from the plurality of concrete block forms.

### Claim 8 (depends on 7)

The method of claim 7, wherein the layer of sand is approximately one inch deep.

### Claim 9 (depends on 8)

The method of claim 8, wherein the layer of coquina stone is approximately one to two inches deep.

### Claim 10 (depends on 7)

The method of claim 7, wherein the rope or cable extends from one concrete block form into an adjacent concrete block form.

### Claim 11 (depends on 7)

The method of claim 7, wherein the connecting step is performed by having a cable or rope extend from one concrete block form into an adjacent concrete block form such that when the concrete hardens, the adjacent concrete blocks are connected by the rope or cable.

### Claim 12 (depends on 1)

The method of claim 1, further including the step, prior to the step of pouring the concrete, of positioning a first plastic or metal tube within the concrete block form that extends all the way through the concrete block form.

### Claim 13 (depends on 12)

The method of claim 12, further including the step, subsequent to the step of positioning the first plastic or metal tube, of positioning a second plastic or steel tube within the concrete block form that is perpendicular to the first plastic or steel tube and that extends all the way through the concrete block form.

### Claim 14 (depends on 12)

The method of claim 12, further including the step of threading rope or cable through the first plastic or metal tube.

### Claim 15 (depends on 12)

The method of claim 12, further including the step of threading rope or cable through the first and second plastic or metal tubes.

### Claim 16 (depends on 15)

The method of claim 15, wherein the concrete block is connected to an adjacent concrete block that was made in accordance with the same process as the concrete block.

### Claim 17 (depends on 15)

The method of claim 15, wherein the concrete block is connected to other concrete blocks made in accordance with the same process as the concrete block to form a cable concrete mat.

### Claim 18 (depends on 1)

The method of claim 1, wherein the coquina stone comprises coral stone.

### Claim 19 (depends on 7)

The method of claim 7, wherein the coquina stone comprises coral stone.
