# US 2009/0268231 A1 · System and method of forecasting print job related demand

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2009/0268231 A1
- Document ID: US20090268231A1
- Status: Published application
- Kind: A1
- Application number: 12/109,411
- Filed: 2008-04-25
- Published: 2009-10-29
- Earliest claimed: 2008-04-25
- Assignees: Xerox Corporation
- Inventors: Robert H. Sperry
- Web page: https://patentgrep.com/patent/US20090268231A1

## CPC

- G06F 3/1261: {by using alternate printing}
- G06F 3/1211: {Improving printing performance}
- G06F 3/1264: {by assigning post-processing resources}
- G06F 3/1282: {High volume printer device}
- G06F 3/1285: {Remote printer device, e.g. being remote from client or server}
- G06Q 10/04: Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem" (market predictions or forecasting for commercial activities G06Q30/0202)
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

A system and method are provided for performing forecasting with respect to total demand data (including two or more demand components) collected in a print production environment. Each demand component (comprising a set of demand component related points corresponding with a first time scale) may be processed in such a way that a demand component related point can be forecasted with demand component related points corresponded with the second time scale. Both the forecasted demand component related point and demand component related points corresponded with the second time scale can then be corresponded with the first time scale.

## Claims

### Claim 1

A print demand forecasting system for use with a print production system in which multiple print jobs are processed over a selected time interval, comprising:
a data collection tool, said data collection tool collecting print demand data for each print job processed during the selected time interval, wherein the print demand data comprises a set of aggregated demand related points corresponding with a first time scale;
a memory; and
a computer implemented service manager for processing the stored set of aggregated demand related points to obtain a first demand component and a second demand component, the first demand component including a first set of demand component related points and the second demand component including a second set of demand component related points, wherein each one of a total number of demand component related points in the first set of demand component related points and a total number of demand component related points in the second set of demand component related points is less than a total number of aggregated demand related points, said memory comprising one or more programming instructions that, when executed, instruct said computer implemented service manager to:
process the first set of demand component related points in such a way that at least some of the demand component related points of the first set of demand component related points are corresponded with a second time scale,
forecast a demand component related point with the first set of demand component related points corresponded with the second time scale, and
correspond both the forecasted demand component related point and the first set of demand related points corresponded with the second time scale with the first time scale to obtain a third set of demand component related points.

### Claim 2 (depends on 1)

The print demand forecasting system of claim 1, in which the set of aggregated demand related points comprises a first set of aggregated demand related points, and in which the forecasted demand component related point comprises a first forecasted demand component related point, wherein said memory further comprising one or more programming instructions that, when executed, instruct said computer implemented service manager to:
process the second set of demand component related points in such a way that the that at least some of the demand component related points of the second set of demand component related points are corresponded with a third time scale,
forecast a second demand component related point with the second set of demand component related points corresponded with the second time scale,
correspond both the second forecasted demand component related point and the second set of demand related points corresponded with the second time scale with the first time scale to obtain a fourth set of demand component related points, and
aggregate the third set of demand component related points with the fourth set of demand component related points to produce a second set of aggregated demand related points.

### Claim 3 (depends on 2)

The print demand forecasting system of claim 2, wherein an output, corresponding with the second set of aggregated demand related points, is provided.

### Claim 4 (depends on 1)

The print demand forecasting system of claim 1, in which a first demand component related point of the first set of demand component related points has a first weight and a second demand component related point of the first set of demand component related points has a second weight, wherein said memory further comprising one or more programming instructions that, when executed, instruct said computer implemented service manager to:
filter one or both of the first and second demand component related points to change one or both of the first and second weights.

### Claim 5 (depends on 4)

The print demand forecasting system of claim 4, wherein, pursuant to corresponding both the first forecasted demand component related point and the second set of demand related points with the first time scale with the first time scale, the second weight is changed to a third weight.

### Claim 6 (depends on 1)

The print demand forecasting system of claim 1, wherein said processing of the first set of demand component related points includes sampling the first set of demand component related points with a recurrence pattern.

### Claim 7 (depends on 1)

The print demand forecasting system of claim 1, in which the set of aggregated demand related points includes an original time series frequency, wherein at least some of the forecasted demand component related point and the first set of demand related points corresponded with the second time scale are resampled to obtain the third set of demand component related points.

### Claim 8 (depends on 1)

The print demand forecasting system of claim 1, in which both the first and second sets of demand component related points are a subset of two or more sets of demand component related points and in which a sum of demand component related points for the two or more sets of demand component related points is less than a total number of demand related points of the set of aggregated demand related points, wherein said computer implemented service manager processes the stored set of aggregated demand related points to obtain a fourth set of demand component related points, wherein a sum of a total number of demand component related points for the subset of two or more sets of demand component related points and the fourth set of demand component related points is substantially equal to the total number of demand related points of the set of aggregated demand related points.

### Claim 9 (depends on 1)

The print demand forecasting system of claim 1, further comprising a network with which at least one of said data collection tool and said computer implemented service manager communicate.

### Claim 10 (depends on 9)

The print demand forecasting system of claim 9, wherein said data collection tool is disposed remotely of said computer implemented service manager and the set of aggregated demand related points is transmitted across the network from said data collection tool to said computer implemented service manager.

### Claim 11 (depends on 9)

The print demand forecasting system of claim 9, in which the memory comprises a first memory, further comprising a second memory, wherein said second memory is operatively associated with said data collection tool and said first memory is operatively associated with said computer implemented service manager.

### Claim 12

A print demand forecasting method for use with a print production system in which multiple print jobs are processed over a selected time interval, comprising:
A. using a processor to process a stored set of aggregated demand related points, corresponding with a first time scale, to obtain a first demand component and a second demand component, the first demand component including a first set of demand component related points and the second demand component including a second set of demand component related points, wherein each one of a total number of demand component related points in the first set of demand component related points and a total number of demand component related points in the second set of demand component related points is less than a total number of aggregated demand related points; and
B. using the processor to (1) process the first set of demand component related points in such a way that the that at least some of the demand component related points of the first set of demand component related points are corresponded with a second time scale, (2) forecast a demand component related point with the first set of demand component related points corresponded with the second time scale, and (3) correspond both the forecasted demand component related point and the first set of demand related points corresponded with the second time scale with the first time scale to obtain a third set of demand component related points.

### Claim 13 (depends on 12)

The print demand forecasting method of claim 12, further comprising:
C. collecting print demand data for each print job processed during the selected time interval, wherein the print demand data comprises the set of aggregated demand related points corresponding with the first time scale.

### Claim 14 (depends on 13)

The print demand forecasting method of claim 13, where said at least one of said A and B is performed at a first network site and said C is performed at a second network site, further comprising disposing the first network site remotely of the second network site.

### Claim 15 (depends on 12)

The print demand forecasting method of claim 12, in which the set of aggregated demand related points comprises a first set of aggregated demand related points and the forecasted demand component related point comprises a first demand component related point, further comprising:
C. using the processor to (1) process the second set of demand component related points in such a way that the that at least some of the demand component related points of the second set of demand component related points are corresponded with a third time scale, (2) forecast a second demand component related point with the second set of demand component related points corresponded with the second time scale, (3) correspond both the second forecasted demand component related point and the second set of demand related points corresponded with the second time scale with the first time scale to obtain a fourth set of demand component related points, and (4) aggregate the third set of demand component related points with the fourth set of demand component related points to produce a second set of aggregated demand related points.

### Claim 16 (depends on 15)

The print demand forecasting method of claim 15, further comprising:
D. providing an output, corresponding with the second set of aggregated demand related points.

### Claim 17 (depends on 12)

The print demand forecasting method of claim 12, in which a first demand component related point of the first set of demand component related points has a first weight and a second demand component related point of the first set of demand component related points has a second weight, further comprising:
C. filtering one or both of the first and second demand component related points to change one or both of the first and second weights.

### Claim 18 (depends on 12)

The print demand forecasting method of claim 12, wherein said B includes sampling the first set of demand component related points with a recurrence pattern.

### Claim 19 (depends on 12)

The print demand forecasting method of claim 12, in which the set of aggregated demand related points includes an original time series frequency, wherein said B(3) includes resampling at least some of the forecasted demand component related point and the first set of demand related points corresponded with the second time scale to obtain the third set of demand component related points.

### Claim 20 (depends on 12)

The print demand forecasting method of claim 12, in which the first and second sets of demand component related points are a subset of two or more sets of demand component related points and in which a sum of demand component related points for the two or more sets of demand component related points are less than a total number of demand related points of the set of aggregated demand related points, further comprising:
C. processing the stored set of aggregated demand related points to obtain a fourth set of demand component related points, wherein a sum of a total number of demand component related points for the subset of two or more sets of demand component related points and the fourth set of demand component related points is substantially equal to the total number of demand related points of the set of aggregated demand related points.
