# US 2009/0265674 A1 · Methods for identifying failing timing requirements in a digital design

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2009/0265674 A1
- Document ID: US20090265674A1
- Status: Published application
- Kind: A1
- Application number: 12/103,845
- Filed: 2008-04-16
- Published: 2009-10-22
- Earliest claimed: 2008-04-16
- Assignees: International Business Machines Corporation
- Inventors: Nathan C. Buck; John P. Dubuque; Eric A. Foreman; Peter A. Habitz; Chandramouli Visweswariah
- Web page: https://patentgrep.com/patent/US20090265674A1

## CPC

- G06F 30/3312: Timing analysis
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

Methods for identifying failing timing requirements in a digital design. The method includes identifying at least one timing test in the digital design that has a passing slack in a base process corner and a failing slack in a different process corner. The method further includes computing a sensitivity of the failing slack to each of a plurality of variables and comparing each sensitivity to a respective sensitivity threshold. If the sensitivity of at least one of the variables is greater than the respective sensitivity threshold, then the at least one timing test is considered to fail.

## Claims

### Claim 1

A method of identifying failing timing requirements in a digital design, the method comprising:
identifying at least one timing test in the digital design that has a passing slack in a base process corner and a failing slack in a different process corner;
computing a sensitivity of the failing slack to each of a plurality of variables;
comparing each sensitivity to a respective sensitivity threshold; and
if the sensitivity of at least one of the variables is greater than the respective sensitivity threshold, determining that the at least one timing test fails.

### Claim 2 (depends on 1)

The method of claim 1 further comprising:
using the at least one timing test for timing closure during timing optimization.

### Claim 3 (depends on 1)

The method of claim 1 further comprising:
computing the failing slack via multi-corner timing analysis.

### Claim 4 (depends on 1)

The method of claim 1 further comprising:
computing the failing slack via statistical static timing analysis.

### Claim 5 (depends on 1)

The method of claim 1 further comprising:
computing the failing slack via slack extrapolation.

### Claim 6 (depends on 5)

The method of claim 5 further comprising:
computing the extrapolated failing slack by subtracting a multiple of a standard deviation of the sensitivity of the extrapolated failing slack to each of the variables from a mean slack.

### Claim 7 (depends on 5)

The method of claim 5 further comprising:
computing the extrapolated failing slack by subtracting a multiple of the standard deviation of the sensitivity of the extrapolated failing slack to a first group of the variables from a mean slack and subtracting a multiple of the sensitivity of the extrapolated failing slack to a second group of the variables from the mean slack.

### Claim 8 (depends on 5)

The method of claim 5 further comprising:
computing the extrapolated failing slack by subtracting a multiple of the sensitivity of the extrapolated failing slack to each of the variables from a mean slack.

### Claim 9 (depends on 5)

The method of claim 5 wherein determining that the at least one timing test fails further comprises:
determining that the timing test fails if the sensitivity of at least one of the variables is greater than the respective sensitivity threshold and the projected failing slack is reduced due to one of the variables moving to the opposite corner.

### Claim 10 (depends on 5)

The method of claim 5 wherein determining that the at least one timing test fails further comprises:
if the sensitivity of at least one of the variables is greater than the respective sensitivity threshold and the projected failing slack is reduced due to a variable moving to the opposite corner, determining that the timing test fails if the at least one of the variables is not part of a variable group.

### Claim 11 (depends on 5)

The method of claim 5 wherein determining that the at least one timing test fails further comprises:
if at least one sensitivity of the projected failing slack is greater than the respective sensitivity threshold, passing the at least one timing test with the projected failing slack if the variable is not flipped and the variable is not part of a variable group.

### Claim 12 (depends on 1)

The method of claim 1 further comprising:
if the sensitivity of the failing slack is greater than the respective sensitivity threshold, fixing the failing slack or the at least one sensitivity in advance of a subsequent timing run.

### Claim 13 (depends on 1)

The method of claim 1 further comprising:
if the sensitivity of the failing slack is greater than the respective sensitivity threshold, the variable is flipped, and the variable is part of a variable group, fixing the failing slack or the at least one sensitivity in advance of a subsequent timing run.