# US 2009/0263769 A1 · Method and system for arranging and displaying project management intelligence

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2009/0263769 A1
- Document ID: US20090263769A1
- Status: Published application
- Kind: A1
- Application number: 12/105,200
- Filed: 2008-04-17
- Published: 2009-10-22
- Earliest claimed: 2008-04-17
- Inventors: Kenneth J. Sweeney
- Web page: https://patentgrep.com/patent/US20090263769A1

## CPC

- G09B 19/18: Book-keeping or economics
- G09B: EDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS (devices for psychotechnics or for testing reaction times A61B5/16; games, sports, amusements A63; projectors, projector screens G03B)

## Abstract

A method and system for arranging, displaying, conveying, learning, and communicating project management intelligence utilizes a device formed of a plurality of 3-dimensional geometric polytopes movably connected together and movable relative to one another. The polytopes represent the domain of project knowledge, the domain of project process groups, and the domain of project management competency, respectively and each polytope has surfaces or sections bearing indicia representing clusters of functional information and aspects of project management relative to the respective project management intelligence domain. The polytopes are manipulated individually to align selected surfaces or sections of each polytope relative to one another so as to collectively visually display selected combinations of interrelated and conjoined functional information and aspects of project management intelligence within the domains.

## Claims

### Claim 1

An interactive project management pedagogic system for displaying and communicating interrelated aspects of project management intelligence, comprising:
a plurality of 3-dimensional geometric polytopes movably connected together to be movable relative to one another, each polytope representing a respective project management intelligence domain, and each polytope having surfaces or sections bearing indicia representing clusters of functional information and aspects of project management relative to the respective project management intelligence domain; wherein
said polytopes are individually manipulated to align selected said surfaces or sections of each polytope relative to one another so as to collectively visually display interrelated and conjoined functional information and aspects of project management intelligence within the domains.

### Claim 2 (depends on 1)

The interactive project management pedagogic system according to claim 1, wherein
said polytopes comprise a first polytope representing the domain of project knowledge, a second polytope representing the domain of project process groups, and a third polytope representing the domain of project management competency.

### Claim 3 (depends on 2)

The interactive project management pedagogic system according to claim 2, wherein
said first polytope representing the domain of project knowledge has a number of surfaces or sections bearing indicia representing a number of core knowledge areas, and a number of surfaces or sections bearing indicia representing a number of facilitating knowledge areas;
said second polytope representing the domain of project process groups has a number of surfaces or sections bearing indicia representing a number of process group areas; and
said third polytope representing the domain of project management competency has a number of surfaces or sections bearing indicia representing a number of management skill set areas.

### Claim 4 (depends on 3)

The interactive project management pedagogic system according to claim 3, wherein
said first polytope representing the domain of project knowledge has four surfaces or sections bearing indicia representing four core knowledge areas, and five surfaces or sections bearing indicia representing five facilitating knowledge areas;
said second polytope representing the domain of project process groups has five surfaces or sections bearing indicia representing five process group areas; and
said third polytope representing the domain of project management competency has twelve surfaces or sections bearing indicia representing twelve management skill set areas.

### Claim 5 (depends on 4)

The interactive project management pedagogic system according to claim 4, wherein
said four core knowledge areas are scope, time, cost, and quality, and said five facilitating knowledge areas are risk, procurement, communications, integration, and human resources.

### Claim 6 (depends on 4)

The interactive project management pedagogic system according to claim 4, wherein
said five process group areas are initiation, planning, execution, control, and closure.

### Claim 7 (depends on 4)

The interactive project management pedagogic system according to claim 4, wherein
said twelve management skill set areas are communications, leadership, planning, team development, time management, negotiation, consensus building, financial management, problem solving, decision making, conflict resolution, and organization.

### Claim 8

An interactive pedagogic method for displaying and communicating interrelated aspects of project management intelligence, comprising the steps of:
providing a plurality of 3-dimensional geometric polytopes movably connected together to be movable relative to one another, said polytopes comprising a first polytope representing the domain of project knowledge, a second polytope representing the domain of project process groups, and a third polytope representing the domain of project management, and each polytope having surfaces or sections bearing indicia representing clusters of functional information and aspects of project management relative to the respective project management intelligence domain; and
manipulating said polytopes individually to align selected said surfaces or sections of each polytope relative to one another so as to collectively visually display interrelated and conjoined functional information and aspects of project management intelligence within the domains.

### Claim 9 (depends on 8)

The method according to claim 8, wherein
said first polytope representing the domain of project knowledge has surfaces or sections bearing indicia representing core knowledge areas, and surfaces or sections bearing indicia representing facilitating knowledge areas;
said second polytope representing the domain of project process groups has surfaces or sections bearing indicia representing process group areas;
said third polytope representing the domain of project management competency has surfaces or sections bearing indicia representing management skill set areas; and
said step of manipulating said polytopes comprises aligning selected said surfaces or sections bearing indicia representing said core knowledge areas, said surfaces or sections bearing indicia representing facilitating knowledge areas, said surfaces or sections bearing indicia representing process group areas, and said surfaces or sections bearing indicia representing management skill set areas, relative to one another so as to collectively visually display interrelated and conjoined functional information and aspects of project management intelligence within the domains.

### Claim 10

A pedagogic device for displaying and communicating interrelated aspects of project management intelligence, comprising:
a device formed of a plurality of 3-dimensional geometric polytopes movably connected together to be movable relative to one another, each polytope representing a respective project management intelligence domain, and each polytope having surfaces or sections bearing indicia representing clusters of functional information and aspects of project management relative to the respective project management intelligence domain; wherein
said polytopes are individually manipulated to align selected said surfaces or sections of each polytope relative to one another so as to collectively visually display interrelated and conjoined functional information and aspects of project management intelligence within the domains.

### Claim 11 (depends on 10)

The device according to claim 10, wherein
said polytopes comprise a first polytope representing the domain of project knowledge, a second polytope representing the domain of project process groups, and a third polytope representing the domain of project management competency.

### Claim 12 (depends on 11)

The device according to claim 11, wherein
said first polytope representing the domain of project knowledge has a number of surfaces or sections bearing indicia representing a number of core knowledge areas, and a number of surfaces or sections bearing indicia representing a number of facilitating knowledge areas;
said second polytope representing the domain of project process groups has a number of surfaces or sections bearing indicia representing a number of process group areas; and
said third polytope representing the domain of project management competency has a number of surfaces or sections bearing indicia representing a number of management skill set areas.

### Claim 13 (depends on 12)

The device according to claim 12, wherein
said first polytope representing the domain of project knowledge has four surfaces or sections bearing indicia representing four core knowledge areas, and five surfaces or sections bearing indicia representing five facilitating knowledge areas;
said second polytope representing the domain of project process groups has five surfaces or sections bearing indicia representing five process group areas; and
said third polytope representing the domain of project management competency has twelve surfaces or sections bearing indicia representing twelve management skill set areas.

### Claim 14 (depends on 13)

The device according to claim 13, wherein
said first polytope representing the domain of project knowledge is an inverted generally pyramidal polytope having a triangular top surface and three triangular planar side surfaces, each bearing indicia representing a respective said project management core knowledge area, and each having a hole therethrough;
a spherical polytope rotatably mounted in said triangular polytope with segments of its outer circumference protruding through a respective hole to define four convex spherical surfaces on said surfaces of said triangular polytope, each segment bearing indicia representing a respective project management facilitating knowledge area; and
lower ends of said triangular side surfaces converging downwardly and inwardly and secured to a generally cylindrical collar having a surface bearing indicia representing a project management facilitating knowledge area.

### Claim 15 (depends on 13)

The device according to claim 13, wherein
said second polytope representing the domain of project process groups is a generally pentagonal polytope having five rectangular side surfaces, each bearing indicia representing a respective said project management process group area.

### Claim 16 (depends on 13)

The device according to claim 13, wherein
said third polytope representing the domain of project management competency is a generally cylindrical disk-like polytope having a top surface and side wall surface divided into twelve sections each bearing indicia representing a respective project management skill set area.
