# US 2009/0260485 A1 · Method and Device for Controlling a Hydraulically Operated Power Wrench

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2009/0260485 A1
- Document ID: US20090260485A1
- Status: Published application
- Kind: A1
- Application number: 12/425,423
- Filed: 2009-04-17
- Published: 2009-10-22
- Earliest claimed: 2008-04-18
- Inventors: Jorg Hohmann; Frank Hohmann
- Web page: https://patentgrep.com/patent/US20090260485A1

## CPC

- B25B 21/005: {driven by a radially acting hydraulic or pneumatic piston}
- B25B 23/145: specially adapted for fluid operated wrenches or screwdrivers
- B25B 23/1456: {having electrical components}
- B25B: TOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING, OR HOLDING

## Abstract

In a method for controlling a hydraulic power wrench with a pivotable lever pivoted by a piston-cylinder unit and a ratchet arrangement for stepwise rotation of a ratchet bushing by advancing and return strokes, parameters such as nominal torque or pre-load or screw parameters are entered into an electronic input unit. Nominal pressure corresponding to the parameters is determined by an electronic evaluation unit and generated by the pump. The piston-cylinder unit is pressure-loaded for performing a pre-stroke until the nominal pressure is reached followed immediately by a return stroke. A time interval from beginning of pressure loading until reaching nominal pressure or until reaching an initial pressure after pressure relief is measured. Pressure loading and measuring are repeated. The measured time intervals are compared. Pressure loading cycles are stopped when at least the last measured time interval is shorter than at least the penultimate measured time interval.

## Claims

### Claim 1

A method for controlling a hydraulically operated power wrench comprising a pivotable lever pivoted by a piston-cylinder unit, comprising a ratchet arrangement for a stepwise rotation of ratchet bushing by advancing strokes and return strokes, and a drive unit with a motor-driven pump for tightening a screw connection; the method comprising:
a) entering a nominal torque or a nominal pre-load or a screw size, material quality, pitch of a thread, and clamping length into an electronic input unit;
b) determining with an electronic evaluation unit a nominal pressure to be generated by the pump, which nominal pressure corresponds to the nominal torque or the nominal pre-load or the screw size, material quality, thread pitch, and clamping length;
c) pressure loading of the piston-cylinder unit for performing a pre-stroke until the nominal pressure is reached and immediate reversing to a return stroke upon reaching the nominal pressure by pressure relief and spring pressure or by controlling pressure loading of the piston-cylinder unit to perform a return stroke;
d) measuring a time interval from beginning of the pressure loading step until the nominal pressure is reached or until an initial pressure after pressure relief is reached;
e) repeating the steps c) and d);
f) comparing the measured time intervals and switching off the pressure loading cycles according to the step c) when at least the last measured time interval is shorter than at least the penultimate measured time interval.

### Claim 2 (depends on 1)

The method according to claim 1, wherein, after determination of a first short measured time interval in step f), two further pressure loading actions according to the step c) are carried out, wherein, based on the three short time intervals measured accordingly and based on three longer measured time intervals measured prior to the three short measured time intervals an average value is calculated or a sum is calculated, respectively, and pressure-loading according to step e) is switched off when the average value or the sum of the short measured time intervals is smaller than the average value or the sum of the longer measured time intervals.

### Claim 3 (depends on 1)

The method according to claim 1, wherein a duration of first pressure loading cycles according to the step c) is measured and the pressure loading cycles according to the step c) are switched off when the duration of the first pressure loading cycles according to step c) is shorter than a preset duration corresponding to a screw-on process.

### Claim 4 (depends on 3)

The method according to claim 3, wherein the duration is measured for the first six pressure loading cycles according to step c).

### Claim 5 (depends on 3)

The method according to claim 3, wherein an error message is generated by the electronic evaluation unit when pressure-loading according to the step c) is switched off immediately upon screwing on a loose nut or screw.

### Claim 6 (depends on 3)

The method according to claim 3, wherein the time intervals of screwing on a loose nut or screw until biting, the time intervals of tightening the nut or the screw until the nominal pressure corresponding to the nominal torque is reached, and at least one time intervals after having reached the nominal pressure corresponding to the nominal torque without further rotation of the nut or screw are measured and pressure loading according to the step c) is switched off when at least the last time interval is shorter than the preceding ones.

### Claim 7 (depends on 1)

A hydraulically operated power wrench for performing the method according to claim 1, comprising:
a piston-cylinder unit;
a ratchet bushing;
a pivotable lever that is pivoted by the piston-cylinder unit and provided with a ratchet arrangement for stepwise rotation of the ratchet bushing;
a drive unit with a motor-driven pump;
an electronic input unit for inputting parameters selected from nominal torque; nominal pre-load force; and screw size, material quality, thread pitch, and clamping length;
an electronic evaluation unit for determining a nominal pressure based on the parameters;
an adjustable pressure valve that is arranged between the piston-cylinder unit and the pump and is adjustable to the nominal pressure;
an actual pressure sensor;
a time measuring device for measuring a time interval of each pressure loading cycle from an initial pressure to the point in time when the nominal pressure is reached or from the beginning of pressure loading action up to the point in time when the nominal pressure is reached and subsequent pressure relief until the initial pressure is reached;
wherein the electronic evaluation unit controls the pressure loading cycles taking into account the measured time intervals such that the pressure loading cycles are switched off when at least the last measured time interval is shorter than at least the penultimate time interval.

### Claim 8 (depends on 7)

The power wrench according to claim 7, wherein the electronic evaluation unit calculates average values or a sum of three short time intervals and of three longer time intervals immediately preceding the three short time intervals, wherein the pressure loading cycles are switched off when the average value or the sum of the three short time intervals is smaller than the average value or the sum of the three longer time intervals.

### Claim 9 (depends on 7)

The power wrench according to claim 7, wherein the electronic evaluation unit measures the duration of the first pressure loading cycles and switches off the pressure loading cycles when the duration of the first pressure loading cycles is shorter than a predetermined duration of a screw-on action.

### Claim 10 (depends on 7)

The power wrench according to claim 7, wherein the electronic evaluation unit generates an error message when the pressure loading cycles are switched off immediately when screwing on a nut or a screw.

### Claim 11 (depends on 7)

The power wrench according to claim 7, wherein the electronic evaluation unit measures the time intervals when screwing on a loose nut or screw until biting, the time intervals for tightening the nut or screw until reaching the nominal pressure corresponding to the nominal torque, and at least one time interval after having reached the nominal pressure corresponding to the nominal torque without further rotation of the nut or screw and switches off the pressure loading cycles when at least the last measured time interval is shorter than the preceding time intervals.
