Scheduling method for multi-user mimo
AssigneeNEC Corporation
InventorsSHOUSEI YOSHIDA, Masayuki KIMATA
Life of this patent
Estimating the term…
Loading patent…
AssigneeNEC Corporation
InventorsSHOUSEI YOSHIDA, Masayuki KIMATA
Estimating the term…
A priority computation process computes a priority of each user for each RB (Resource Brock) using a reception SINR. A maximum priority user selection/RB allocation process selects a user with the maximum priority for an unallocated RB and allocates the RB to the user. A frequency axis/space axis unallocated RB presence determination process proceeds to scheduling for a next user if there is an unallocated RB on the frequency or space axis. A projected channel vector update process updates a projected channel vector of an unselected user by GS orthogonalization. An orthogonal coefficient computation process computes an orthogonal coefficient. A corrected SINR computation process computes a corrected SINR. A next MIMO layer priority computation process computes priorities of unselected users for a corresponding RB in the next multiple MIMO layer. The priorities of the unselected users are used in the next user scheduling processing.
An MU-MIMO scheduling method for allocating frequency- and space-divided resource blocks to users, comprising:
A scheduling method for use in an MU-MIMO communication system allocating frequency- and space-divided carriers to users, the method being for performing scheduling for allocating carriers to users and comprising:
A scheduling method for use in an MU-MIMO communication system allocating frequency- and space-divided carriers to users, the method being for performing scheduling for allocating carriers to users and comprising:
Dependencies are inferred from the claim text.