# US 2008/0313598 A1 · Technique for managing the process of developing software

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2008/0313598 A1
- Document ID: US20080313598A1
- Status: Published application
- Kind: A1
- Application number: 11/818,178
- Filed: 2007-06-12
- Published: 2008-12-18
- Earliest claimed: 2007-06-12
- Assignees: Intuit Inc.
- Inventors: Thomas A. Frasher; Todd M. Fitch
- Web page: https://patentgrep.com/patent/US20080313598A1

## CPC

- G06F 11/3616: {using software metrics}
- G06Q 10/06: Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q 10/063116: {Schedule adjustment for a person or group}
- G06Q 10/06393: {Score-carding, benchmarking or key performance indicator [KPI] analysis}
- G06Q 10/06395: {Quality analysis or management}
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

A system that manages development of software is described. During operation, this system aggregates status information and requirement information as a function of time, where the status information specifies the status of the development of the software and the requirement information specifies target requirements for the software. Next, the system dynamically determines a project estimate for the development of the software based on the status information and the requirement information.

## Claims

### Claim 1

A computer program product for use in conjunction with a computer system, the computer program product comprising a computer-readable storage medium and a computer-program mechanism embedded therein for managing development of software, the computer-program mechanism including:
instructions for aggregating status information as a function of time, wherein the status information specifies a status of the development of the software;
instructions for aggregating requirement information as a function of time, wherein the requirement information specifies target requirements for the software; and
instructions for dynamically determining a project estimate for the development of the software based on the status information and the requirement information.

### Claim 2 (depends on 1)

The computer program product of claim 1, wherein the dynamic determination involves:
generating a first multi-dimensional vector corresponding to at least a portion of the status information;
generating a second multi-dimensional vector corresponding to at least a portion of the requirement information; and
calculating a difference between the first multi-dimensional vector and the second multi-dimensional vector.

### Claim 3 (depends on 2)

The computer program product of claim 2, wherein generation of the first multi-dimensional vector involves using different weights for two variables in at least the portion of the status information.

### Claim 4 (depends on 2)

The computer program product of claim 2, wherein generation of the second multi-dimensional vector involves using different weights for two variables in at least the portion of the requirement information.

### Claim 5 (depends on 1)

The computer program product of claim 1, wherein the status information includes: time stamps, a number of reported bugs, features to be developed for the software, a number of development engineers, a number of hours worked developing the software, a number of hours worked testing the software, or a number of lines of code in the software.

### Claim 6 (depends on 1)

The computer program product of claim 1, wherein the requirement information includes: time stamps, a targeted completion time, budgetary constraints, user requirements, one or more quality metrics for the software, one or more operating environments, or a number of users.

### Claim 7 (depends on 1)

The computer program product of claim 1, wherein the requirement information includes a confidence region surrounding an end point in the development.

### Claim 8 (depends on 1)

The computer program product of claim 1, wherein the project estimate includes an estimated completion time.

### Claim 9 (depends on 1)

The computer program product of claim 1, wherein the project estimate includes recommended modifications to development resources to meet a targeted completion time.

### Claim 10 (depends on 9)

The computer program product of claim 9, wherein the recommended modifications include changes to a number of development engineers.

### Claim 11 (depends on 9)

The computer program product of claim 9, wherein the recommended modifications include changes to features to be developed for the software.

### Claim 12 (depends on 1)

The computer program product of claim 1, wherein the project estimate includes recommended modifications to user requirements or quality metrics for the software.

### Claim 13 (depends on 12)

The computer program product of claim 12, wherein the recommended modifications include changes to features to be developed for the software.

### Claim 14 (depends on 12)

The computer program product of claim 12, wherein the recommended modifications include changes to a confidence region surrounding an end point in the development.

### Claim 15 (depends on 1)

The computer program product of claim 1, wherein aggregation of the status information involves adding or subtracting variables as a function of time.

### Claim 16 (depends on 1)

The computer program product of claim 1, wherein aggregation of the requirement information involves adding or subtracting variables as a function of time.

### Claim 17 (depends on 1)

The computer program product of claim 1, wherein the project estimate is based on a rate at which development engineers develop a given feature for the software.

### Claim 18 (depends on 1)

The computer program product of claim 1, wherein the project estimate is based on a rate at which development engineers correct a given reported bug in the software.

### Claim 19

A method for managing development of software, comprising:
aggregating status information as a function of time, wherein the status information specifies a status of the development of the software;
aggregating requirement information as a function of time, wherein the requirement information specifies target requirements for the software; and
dynamically determining a project estimate for the development of the software based on the status information and the requirement information.

### Claim 20 (depends on 19)

The method of claim 19, wherein the dynamic determination involves:
generating a first multi-dimensional vector corresponding to at least a portion of the status information;
generating a second multi-dimensional vector corresponding to at least a portion of the requirement information; and
calculating a difference between the first multi-dimensional vector and the second multi-dimensional vector.

### Claim 21 (depends on 19)

The method of claim 19, wherein the requirement information includes a confidence region surrounding an end point in the development.

### Claim 22 (depends on 19)

The method of claim 19, wherein the project estimate includes an estimated completion time.

### Claim 23 (depends on 19)

The method of claim 19, wherein the project estimate includes recommended modifications to development resources to meet a targeted completion time.

### Claim 24 (depends on 23)

The method of claim 23, wherein the recommended modifications include changes to a number of development engineers.

### Claim 25 (depends on 23)

The method of claim 23, wherein the recommended modifications include changes to features to be developed for the software.

### Claim 26 (depends on 19)

The method of claim 19, wherein the project estimate includes recommended modifications to user requirements.

### Claim 27 (depends on 26)

The method of claim 26, wherein the recommended modifications include changes to features to be developed for the software.

### Claim 28 (depends on 26)

The method of claim 26, wherein the recommended modifications include changes to a confidence region surrounding an end point in the development.

### Claim 29

A computer system to manage development of software, comprising:
a processor;
memory;
a program module, wherein the program module is stored in the memory and configurable to be executed by the processor, the program module including:
instructions for aggregating status information as a function of time, wherein the status information specifies a status of the development of the software;
instructions for aggregating requirement information as a function of time, wherein the requirement information specifies target requirements for the software; and
instructions for dynamically determining a project estimate for the development of the software based on the status information and the requirement information.
