# US 2008/0307376 A1 · Method for Verifying Timing of a Multi-Phase, Multi-Frequency and Multi-Cycle Circuit

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2008/0307376 A1
- Document ID: US20080307376A1
- Status: Published application
- Kind: A1
- Application number: 12/186,444
- Filed: 2008-08-05
- Published: 2008-12-11
- Earliest claimed: 2005-02-03
- Assignees: Sage Software, Inc.
- Inventors: Mau-Chung Chang
- Web page: https://patentgrep.com/patent/US20080307376A1

## CPC

- G06F 30/3315: using static timing analysis [STA]
- G06F 30/33: Design verification, e.g. functional simulation or model checking
- G06F 30/3312: Timing analysis
- G06F 30/367: Design verification, e.g. using simulation, simulation program with integrated circuit emphasis [SPICE], direct methods or relaxation methods
- G06F 2119/12: Timing analysis or timing optimisation
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

A single verification tool provides both static timing analysis and timing simulation capabilities targeted at both full-custom and ASIC designs in a unified environment. In various embodiments the verification tool includes the following features: (a) Integrating both static timing analysis and dynamic simulation tools into a single tool, (b) Efficient path search for multi-phase, multi-frequency and multi-cycle circuit in the presence of level sensitive latch, (c) Automatically identifying circuit structure, e.g. complex gate, for timing characterization, (d) Circuit structures at transistor level solved by incorporating function check, (e) Carrying out functional check to filter out failing path and identifying gate with simultaneously changing inputs, (f) Finding maximum operation frequency in the presence of level sensitive latches after filtering out false paths, (g) Crosstalk solver by utilizing the admittance matrix and voltage transfer of RLC part in frequency domain coupled with the non-linear driver in time domain implemented in spice-like simulator, (h) Making use of the correlation between inputs of aggressors and victim to determine switching time at victim's output iteratively.

## Claims

### Claim 1

A method of verifying timing of a multi-phase, multi-frequency and multi-cycle circuit with level sensitive latches, comprising:
generating an event graph of nodes for paths in the circuit including at least one level-sensitive latch;
identify late arrival times for the nodes with respect to a plurality of clock phases;
identify clock phases at a destination in the circuit; and
trace back from the destination to find a failing path in the circuit.

### Claim 2 (depends on 1)

A method according to claim 1, further comprising:
computing the value Q(x, node, y) for a node with respect to a source clock phase y and a destination clock phase x as Q(x,node,y)=TimingConstraint (x,y)−LAT(node,y),
wherein TimingConstraint (x,y) is a timing constraint between source clock phase y and destination clock phase x; and
wherein LAT(node,y) is a Latest Arrival Time at the node with respect to clock phase y.

### Claim 3 (depends on 2)

A method according to claim 2, wherein for any pair of y and z from the set of source clock phases:
if Q(x,node,y)<=Q(x,node,z) for all destination clock phase x, store y for the node;
else if Q(x,node,y)>=Q(x,node,z) for all destination clock phase x, store z for the node;
else store y and z for the node.

### Claim 4 (depends on 1)

A method according to claim 1, wherein the step of finding the failing path includes tracing backward based on depth first traversal.

### Claim 5 (depends on 2)

A method according to claim 2, wherein the step of finding the failing path includes determining slack between an input (in) and output (out), using the formula,
slack(in)=slack(out)+Qin→out(x)−Q(x,out,y);
wherein Qin→out(x)=Q(x,in,z)−Delayin→out,
and wherein Q(x,in,z)=TimingConstraint (x,z)−LAT(in,z);
and wherein Q(x,out,y)=TimingConstraint(x,y)−LAT(out,y).
