# US 2008/0304918 A1 · Reinforced-concrete column in the soil pit and method of its construction

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2008/0304918 A1
- Document ID: US20080304918A1
- Status: Published application
- Kind: A1
- Application number: 12/193,554
- Filed: 2008-08-18
- Published: 2008-12-11
- Earliest claimed: 2003-06-02
- Assignees: Yurkevich Engineering Bureau Ltd.
- Inventors: Pavel Borisovich YURKEVICH
- Web page: https://patentgrep.com/patent/US20080304918A1

## CPC

- E04C 3/34: of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings (E04C3/36 takes precedence)
- E02D 5/48: Piles varying in construction along their length {, i.e. along the body between head and shoe, e.g. made of different materials along their length (E02D5/50, E02D5/52 take precedence)}
- E04C 5/0604: {Prismatic or cylindrical reinforcement cages composed of longitudinal bars and open or closed stirrup rods (E04C5/0631 takes precedence)}
- E02D 5/44: with enlarged footing or enlargements at the bottom of the pile
- E04C: STRUCTURAL ELEMENTS; BUILDING MATERIALS (for bridges E01D; specially designed for insulation or other protection E04B; elements used as building aids E04G; for mining E21; for tunnels E21D; structural elements with broader range of application than for building engineering F16, particularly F16S)
- E02D: FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B); UNDERGROUND OR UNDERWATER STRUCTURES {(tunnels, tunnelling, mining E21)}

## Abstract

A reinforced-concrete column contains reinforcing cage and inserts made monolithic with concrete mix and comprises the upper bearing and lower foundation parts. The method of construction of the column includes operations of manufacture of the column reinforcing cage with inserts, placement of concrete in the non-removable casing in the project position in single- or multi-slit pit with the column making monolithic. The column reinforcing cage is loaded vertically into the pit, centered vertically, and the upper part is fixed from horizontal displacements, the lower foundation part of the column and the inner part of the non-removable casing with the closed-type casing in the upper bearing part of the column are made monolithic with concrete from down to top. After making monolithic, the soil base is widened and cemented via the process pipeline placed inside the reinforcing cage; the space between the non-removable casing and the pit walls in the upper bearing part is filled with granular material.

## Claims

### Claim 1

A method of construction of a reinforced-concrete column in a soil pit, comprising operations of:
manufacture of the column reinforcing cage with inserts,
concreting in a non-removable casing in a project position in the single- or multi-slit pit with the column making monolithic,
wherein the column is made from an upper bearing and a lower foundation parts;
the soil pit is made with sizes along axis Y taken with a proviso that
ABi>AKi+2(εΓ+αγ+βγ)
and along axis X taken with a proviso that
BBi>BKi+2(εχ+αχ+βχ), where
Y—axis passing through geometric center of a cross-section of a cage lower part;
X—axis passing through geometric center of the cross-section of the cage lower part perpendicular to axis Y.
AKi—basic sizes of branches of the lower part of the column cage along axis Y;
BKi—basic sizes of the branches of the lower part of the column cage along axis X;
ABi—basic sizes of the pit slits along axis Y corresponding to them;
BBi—basic sizes of the pit slits along axis X;
K—index of the size related to the cage;
B—index of the size related to pit slits;
i—size index;
εγεχ—components of eccentricity along axes Y and X, respectively, of projection of geometric center of the column one-piece reinforcing cage with respect to projection of its center of masses in the plane of its top;
αγand αχ—maximum deviations of the pit from vertical along axes Y and X, respectively;
βγβχ—deviations of geometric center of the pit cross-section in the plane along axes Y and X, respectively, in the plane of the column top,
the column reinforcing cage is placed vertically into the pit with the gap from its bottom,
the upper part is vertically centered with compensation for eccentricity and fixed from horizontal displacements,
the lower foundation part of the column is made monolithic from bottom to top with concrete, and
an inner part of the non-removable casing with the closed-type contour is made monolithic with concrete in the upper bearing part of the column.

### Claim 2 (depends on 1)

The method of claim 1, wherein the placement of concrete in the non-removable casing in the project position is carried out in a borehole with the column making monolithic,
the borehole is drilled with diameter Dc=AB=BB≧Dk=AK=BK+2(εΓ+αΓ+βΓ), where Dk, maximum equivalent outer diameter of the column reinforcing cage; εΓ=√(εχ2+εγ2)—total eccentricity of projection of geometric axis related to projection of axis of center of masses of the column in the plane of the column top;
αΓ√(αχ2αγ2)—total deviation of the borehole axis from vertical;
βΓ=√(βχ2+βγ2)—total deviation of the borehole axis in the plane;
the column reinforcing cage is vertically placed into the borehole with a gap from the borehole bottom by value P≧0.1 Dc,
the upper part is vertically centered with compensation for eccentricity and fixed from horizontal displacements;
the upper part is vertically sinked onto the borehole base with fixation of the lower part by fixing plates,
the lower foundation part of the column and the inner part of the non-removable casing of the upper bearing part of the column are made monolithic with concrete.

### Claim 3 (depends on 1)

The method of claim 1, wherein widening and cementation of the soil base are made after the column made monolithic via a process pipeline arranged inside the reinforcing cage, the space between the non-removable casing and the pit walls in the upper bearing part is filled with granular material.

### Claim 4 (depends on 2)

The method of claim 2, wherein widening and cementation of the soil base are made after the column made monolithic via a process pipeline arranged inside the reinforcing cage, the space between the non-removable casing and the pit walls in the upper bearing part is filled with granular material.