# US 2008/0302535 A1 · Subsea Intervention Riser System

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2008/0302535 A1
- Document ID: US20080302535A1
- Status: Published application
- Kind: A1
- Application number: 11/760,301
- Filed: 2007-06-08
- Published: 2008-12-11
- Earliest claimed: 2007-06-08
- Inventors: David Barnes
- Web page: https://patentgrep.com/patent/US20080302535A1

## CPC

- E21B 17/012: {with buoyancy elements (E21B17/015 takes precedence)}
- E21B 17/01: Risers
- E21B 17/015: {Non-vertical risers, e.g. articulated or catenary-type}
- E21B 19/004: {supporting a riser from a drilling or production platform}
- E21B 41/04: Manipulators for underwater operations, e.g. temporarily connected to well heads
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

The invention comprises a multi-component system for subsea intervention. The system comprises a lower riser component which is held vertical by a buoyance element and an upper riser system. The upper riser system is a continuous, enjoined conduit with sufficient flexibility to absorb the motion of the deployment vessel without adversely affecting the function of the intervention system.

## Claims

### Claim 1

A subsea intervention system comprising:
(a) a lower riser component;
(b) a first buoyancy element attached to the upper end of said lower riser component;
(c) an upper riser component extending between the upper end of said lower riser component and a surface vessel, said upper riser component having sufficient flexibility to absorb the motion of said surface vessel without adversely affecting the operation of said intervention system;
(d) a second buoyancy element attached to said upper riser system, wherein said upper riser component comprises continuous un-jointed, unbonded composite pipe.

### Claim 2 (depends on 1)

The intervention system of claim 1 wherein said lower and upper user components comprise multi bore risers.

### Claim 3 (depends on 1)

The intervention system of claim 1 further comprising a disconnect system between said upper and lower riser components.

### Claim 4 (depends on 1)

The intervention system of claim 1 wherein said lower riser component is connected to a Xmas tree.

### Claim 5 (depends on 4)

The intervention system of claim 4 further comprising a Blowout Preventer placed between said lower riser component and said Xmas tree.

### Claim 6 (depends on 1)

The intervention system of claim 1 further comprising an external conduit mounted to said upper and lower riser components.

### Claim 7 (depends on 1)

The intervention system of claim 1 wherein the upper and lower riser components are lined.

### Claim 8 (depends on 1)

The intervention system of claim 1 further comprising a pressure activated sealing system at the bottom of the upper riser component.

### Claim 9 (depends on 1)

The intervention system of claim 1 further comprising a motion compensation system located between the upper and lower riser components.

### Claim 10

A subsea intervention system comprising:
(a) a lower riser component;
(b) an upper riser component extending between said lower riser component and a surface vessel, said upper riser component comprising continuous, un-jointed, unbonded composite pipe;

### Claim 11 (depends on 10)

The intervention system of claim 10 wherein the upper riser component has sufficient flexibility to absorb the motion of said surface vessel without adversely affecting the operation of said intervention system.

### Claim 12 (depends on 10)

The intervention system of claim 10 wherein the said upper and lower riser components comprise two or more bores.

### Claim 13 (depends on 10)

The intervention system of claim 10 further comprising a disconnect system located between said upper and lower riser components.

### Claim 14 (depends on 10)

The intervention system of claim 10 further comprising a disconnect system between said upper and lower riser components.

### Claim 15 (depends on 10)

The intervention system of claim 10 wherein said lower riser component is connected to a Xmas tree.

### Claim 16 (depends on 15)

The intervention system of claim 15 further comprising a Blowout Preventer placed between said lower riser component and said Xmas tree.

### Claim 17 (depends on 10)

The intervention system of claim 10 further comprising an external conduit mounted to said upper and lower riser components.

### Claim 18 (depends on 10)

The intervention system of claim 10 wherein the upper and lower riser components are lined.

### Claim 19 (depends on 10)

The intervention system of claim 10 further comprising a pressure activated sealing system at the bottom of the upper riser component.

### Claim 20 (depends on 10)

The intervention system of claim 10 further comprising a motion compensation system located between the upper and lower riser components.

### Claim 21 (depends on 10)

The intervention system of claim 10 where in the lower riser component comprises continuous/un-jointed unbonded composite pipe.
