# US 2008/0302523 A1 · Wireline retrievable dsg/downhole pump system for cyclic steam and continuous steam flooding operations in petroleum reservoirs

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2008/0302523 A1
- Document ID: US20080302523A1
- Status: Published application
- Kind: A1
- Application number: 12/190,709
- Filed: 2008-08-13
- Published: 2008-12-11
- Earliest claimed: 1983-01-19
- Assignees: ConocoPhillips Company
- Inventors: Dennis C. Wegener; Riley B. Needham; David R. Zornes; Partha S. Sarathi
- Web page: https://patentgrep.com/patent/US20080302523A1

## CPC

- E21B 43/24: using heat, e.g. steam injection
- E21B 23/01: for anchoring the tools or the like (E21B23/02 - E21B23/06 take precedence; anchoring of drives in the borehole E21B4/18)
- E21B 43/121: {Lifting well fluids (monitoring of down-hole pump systems E21B47/008)}
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

A non-rigid carrier conveys a pump and/or the steam generator through a bore of the production tubing string to support enhanced oil recovery operations. An annular space separates the production tubing string and a wall of a wellbore intersecting a hydrocarbon-bearing subterranean formation. Using the non-rigid carrier, the steam generator is conveyed into the wellbore and operated to inject hot gases into the formation through the perforations in the casing. Afterwards, the steam generator is conveyed out of the cased wellbore and the pump is conveyed into the cased wellbore and operated to pump hydrocarbons to the surface. For cyclic injection operations, the pump may be retrieved to the surface and the steam generator may be returned into the well. The production tubing string, such as a production tubing, remains in the well while the pump and/or the steam generator are conveyed up and down the cased well. A base installed in the cased well receives either the pump or the steam generator.

## Claims

### Claim 1

A method of recovering hydrocarbons to the surface of the earth from a subterranean formation, comprising:
(a) positioning a steam generator in a wellbore intersecting the subterranean formation;
(b) installing a production tubing string in the wellbore;
(c) conveying the steam generator to the surface via a bore of the production tubing string; and
(d) conveying a pump into the wellbore via the bore of the production tubing string.

### Claim 2 (depends on 1)

The method of claim 1 wherein said wellbore is at least partially cased.

### Claim 3 (depends on 1)

The method of claim 1 further comprising:
installing a base in the wellbore;
positioning the steam generator on the base; and
positioning the pump on the base after the retrieving the steam generator.

### Claim 4 (depends on 2)

The method of claim 2 further comprising positioning the base external to the production tubing string.

### Claim 5 (depends on 1)

The method of claim 1 further comprising conveying the pump to the surface via the bore of the production tubing string.

### Claim 6 (depends on 1)

The method of claim 1 further comprising conveying the steam generator into the wellbore via the bore of the production tubing string.

### Claim 7 (depends on 1)

The method of claim 1 further comprising using a non-rigid carrier to convey one of: (i) the steam generator, and (ii) the pump.

### Claim 8 (depends on 1)

The method of claim 1 further comprising: injecting a steam into the subterranean formation using the steam generator.

### Claim 9 (depends on 8)

The method of claim 8 further comprising soaking the subterranean formation with the steam for a desired period of time.

### Claim 10 (depends on 1)

The method of claim 1 further comprising injecting steam and exhaust gases into the subterranean formation using the steam generator.

### Claim 11 (depends on 1)

The method of claim 1 further comprising pumping a fluid to the surface via the production tubing string using the pump.

### Claim 12 (depends on 11)

The method of claim 11 further comprising:
conveying the pump to the surface via the bore of the production tubing string;
conveying the steam generator into the wellbore via the bore of the production tubing string;
injecting steam into the subterranean formation using the steam generator;
conveying the steam generator to the surface via the bore of the production tubing string;
conveying the pump into the wellbore via the bore of the production tubing string; and
pumping a fluid to the surface via the production tubing string using the pump.

### Claim 13

A system for recovering hydrocarbons from a wellbore intersecting a subterranean formation, comprising:
(a) a production tubing string positioned in the wellbore intersecting the subterranean formation and having an annular space separating the production tubing string and a wall of the wellbore, the production tubing string having a bore configured to convey a fluid to the surface;
(b) a steam generator configured to be conveyed through the bore of the production tubing string; and
(c) a pump configured to be conveyed through the bore of the production tubing string.

### Claim 14 (depends on 12)

The system of claim 12 further comprising a base associated with the production tubing string, the base configured to receive either the steam generator or the pump.

### Claim 15 (depends on 12)

The system of claim 12 further comprising a base configured to be positioned in the wellbore, the base configured to receive either the steam generator or the pump.

### Claim 16 (depends on 12)

The system of claim 12 further comprising a casing cemented in the wellbore, wherein the wellbore wall includes an inner surface of a casing.

### Claim 18 (depends on 12)

The system of claim 12 further comprising a non-rigid carrier configured to convey at least one pump and at least one steam generator through the bore of the production tubing string.