# US 2008/0302265 A1 · Method for Replacing Old Ties of a Railroad Track with New Ties

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2008/0302265 A1
- Document ID: US20080302265A1
- Status: Published application
- Kind: A1
- Application number: 11/631,888
- Filed: 2005-05-18
- Published: 2008-12-11
- Earliest claimed: 2004-07-19
- Assignees: Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H.
- Inventors: Josef Theurer; Manfred Brunninger
- Web page: https://patentgrep.com/patent/US20080302265A1

## CPC

- E01B 29/09: under, or from under, installed rails
- E01B: PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS (derailing or rerailing blocks on track, track brakes or retarders B61K)

## Abstract

The invention relates to the replacement of old ties of a railway track by new ties. This aim can be achieved by spreading the two rails apart from each other. The reception of ballast gravel for producing a recess of ballast is carried out in a region below of the sleeper head of a ballast bed, which is located adjacent to the region of the old sleepers along their longitudinal axis. The received ballast gravel is temporarily stored and, once the new sleepers have been deposited, thrown off for the purpose of ballasting. In parallel and prior to the deposit of new sleepers, excess ballast gravel is ploughed in the recess of ballast so as to produce a leveled surface of ballast.

## Claims

### Claim at position 1

1: Method for replacing old ties (6) of a railroad track (8) with new ties (11), whereby rails (7) that are released from the old ties (6) are spread apart from one another laterally, and the production of a ballast level (27) takes place before the new ties (11) are laid down, wherein in a tie pre-head region (25) of a ballast bed (33) that follows the old ties (6) in the tie longitudinal direction, ballast (26) for producing a bed depression (31) is picked up, temporarily stored, and, after the new ties (11) have been laid down, thrown down to provide ballast for the latter, and that parallel to this, before the new ties (11) are laid down, excess ballast (26) is plowed into the bed depression (31), to produce the ballast level (27).
