# US 2008/0301889 A1 · Construction method for girder in bridge, crane for pulling up girder, vehicle for carring girder, and girder used for the same

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2008/0301889 A1
- Document ID: US20080301889A1
- Status: Published application
- Kind: A1
- Application number: 12/133,974
- Filed: 2008-06-05
- Published: 2008-12-11
- Earliest claimed: 2007-06-05
- Assignees: Samsung Corporation
- Inventors: Dong-Ok KANG; Man-Geun YOON; Hyun-Yang SHIN; Yeong-Seon KIM
- Web page: https://patentgrep.com/patent/US20080301889A1

## CPC

- E01D 21/06: by translational movement of the bridge or bridge sections {(E01D15/127, E01D15/133 and E01D21/10 take precedence)}
- B66C 17/06: specially adapted for particular purposes, e.g. in foundries, forges; combined with auxiliary apparatus serving particular purposes (B66C17/04 takes precedence)
- E01D: CONSTRUCTION OF BRIDGES, {ELEVATED ROADWAYS} OR VIADUCTS; ASSEMBLY OF BRIDGES (bridges extending between terminal buildings and aircraft for embarking or disembarking passengers B64F1/305; {tracks for special kinds of railways E01B25/00; culverts E01F5/005})
- B66C: CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES ({specially adapted for lifting invalids A61G7/10;} rope, cable, or chain winding mechanisms, braking or detent devices therefor B66D; specially adapted for nuclear reactors G21)

## Abstract

A construction method for a girder in a bridge which a plurality of piers are installed in an interval in a longitudinal direction of the bridge, a plurality of copings are installed on the piers, and a plurality of girders respectively installed between the piers are installed on the copings, the method comprising the steps of: installing at least one temporary girder on a front coping of the copings and a rear coping adjacent to the rear coping of the copings; installing a crane for pulling up a girder having a girder pulling up space therein guided by the temporary girder; providing with a girder by a pre-cast method so as to install a girder on the front coping and the rear coping; providing with a vehicle for carrying a girder, the vehicle being constituted so that load of a girder to the piers carried by the vehicle is distributed to the piers through the upper surface of the girders installed in advance; introducing the vehicle carrying a first girder moving along a guide of the temporary girder to a girder pulling up space of the crane; pulling up the first girder by the crane; drawing out the vehicle backward from the girder pulling up space; moving a first temporary girder of the temporary girders from a position where the first girder is to be installed to a front of the front coping of the one of the copings and installing the first temporary girder on a next front coping installed in a next front of the front coping and the front coping; and settling the first girder on the front coping and the rear coping by the crane is disclosed.

## Claims

### Claim 1

A construction method for a girder in a bridge which a plurality of piers are installed in an interval in a longitudinal direction of the bridge, a plurality of copings are installed on the piers, and a plurality of girders respectively installed between the piers are installed on the copings, the method comprising the steps of:
installing at least one temporary girder on a front coping of the copings and a rear coping adjacent to the rear coping of the copings;
installing a crane for pulling up a girder having a girder pulling up space therein guided by the temporary girder;
providing with a girder by a pre-cast method so as to install a girder on the front coping and the rear coping;
providing with a vehicle for carrying a girder, the vehicle being constituted so that load of a girder to the piers carried by the vehicle is distributed to the piers through the upper surface of the girders installed in advance;
introducing the vehicle carrying a first girder moving along a guide of the temporary girder to a girder pulling up space of the crane;
pulling up the first girder by the crane;
drawing out the vehicle backward from the girder pulling up space;
moving a first temporary girder of the temporary girders from a position where the first girder is to be installed to a front of the front coping of the one of the copings and installing the first temporary girder on a next front coping installed in a next front of the front coping and the front coping; and
settling the first girder on the front coping and the rear coping by the crane.

### Claim 2 (depends on 1)

The construction method for a girder in a bridge of claim 1, further comprising: the steps of
introducing a vehicle moving by being guided by the temporary girder and the first girder and moving a second girder of the girders which is secondly installed for carrying a second girder to a girder pulling up space of the crane;
pulling up the second girder by the crane;
drawing out the vehicle backward from the girder pulling up space;
moving a second temporary girder of the temporary girders from a position where the second girder is to be installed to a front of the front coping of the one of the copings and installing the second temporary girder on a next front coping installed in a next front of the front coping and the front coping; and
settling the second girder on the front coping and the rear coping by the crane.

### Claim 3 (depends on 2)

The construction method for a girder in a bridge of claim 2, further comprising the step of:
moving the crane guided by a guide of the first and the second temporary girders, after the step of settling the second girder.

### Claim 4 (depends on 1)

The construction method for a girder in a bridge of claim 1, wherein the piers are provided with in an interval in a width direction of the bridge.

### Claim 5 (depends on 2)

The crane for the construction method of claim 2, the crane comprising a crane body and a plurality of supporters vertically installed at a lower side of the crane body, the supporters supporting the crane body,
wherein the supporters comprise:
a front left supporter and a front right supporter installed at the front coping; and
a rear left supporter and a rear right supporter installed at the girder installed in advance.

### Claim 6 (depends on 5)

The crane of claim 5, further comprising:
an up-down girder pulling device installed at the crane body, the up-down girder pulling device having a girder temporary mounting unit for pulling up a girder, in order to pull up or be settled to an upper side of a girder; and
a right-left girder moving device for moving the up-down girder pulling device in right and left directions.

### Claim 7 (depends on 5)

The crane of claim 5, further comprising a supplementary supporter installed at the lower side of the crane body so as to be opened and closed in up and down directions, and operated such that a lower end thereof is installed at the coping or the girder installed in advance when being closed, for resisting a load of the pulled-up girder together with the plurality of supporters when the girder is pulled up by the up-down girder pulling device.

### Claim 8 (depends on 7)

The crane of claim 7, wherein a crane base portion supported by being contacted with an upper surface of the coping or the girder installed in advance and a crane interval adjusting unit for adjusting an interval between the lower end of the supplementary supporter and the crane base portion are provided with at the end of the supplementary supporter.

### Claim 9 (depends on 7)

The crane for pulling up a girder of claim 7, wherein the supplementary supporter is installed between the rear left supporter and the rear right supporter.

### Claim 10 (depends on 5)

The crane of claim 5, further comprising:
an up-down temporary girder pulling device installed at the crane body, the up-down temporary girder pulling device having a temporary girder temporary mounting unit for pulling up a temporary girder in order to pull up or be settled to an upper side of a temporary girder; and
a back-forth temporary girder moving device for moving the up-down temporary girder pulling device in back and forth directions.

### Claim 11 (depends on 10)

The crane of claim 10, further comprising a right-left temporary girder moving device for moving the up-down temporary girder pulling device in right and left directions.

### Claim 12 (depends on 5)

The crane of claim 5, further comprising:
a temporary girder supporting portion vertically installed at a lower side of the crane body; and
a temporary girder mounting and driving unit installed at a lower end of the temporary girder supporting portion and mounted at the temporary girder, for allowing a relative operation between the temporary girder and the lower end of the temporary girder supporting portion.

### Claim 13 (depends on 12)

The crane of claim 12, the temporary girder mounting and driving unit comprises:
a temporary girder mounting portion extended by being divided into two parts from the lower end of the temporary girder supporting portion; and
a side guide roller portion installed at a lower end of the temporary girder mounting unit, and moving along side guide grooves formed at both sides of the temporary girder.

### Claim 14 (depends on 12)

The crane of claim 12, wherein the crane body comprises a crane extended body portion extending towards a front of the front coping, and the temporary girder supporting portion and the temporary girder mounting and driving unit are respectively installed at sides of the front left supporter and the front right supporter, and at a front lower side of the crane extended body portion, respectively.

### Claim 15 (depends on 13)

The crane of claim 13, wherein a pair of the temporary girder supporting portions are installed at right and left sides of the front left supporter, and a pair of the temporary girder mounting and driving units are installed at right and left sides of the front right supporter.

### Claim 16 (depends on 13)

The temporary girder for the construction method of claim 13, comprising side guide grooves formed at both sides for guiding the crane.

### Claim 17 (depends on 15)

A temporary girder used to the construction method for a girder in a bridge together with the crane for pulling up a girder of claim 15, wherein the temporary girder is installed at right and left sides of the front left supporter in one pair, and is installed at right and left sides of the front right supporter in one pair.

### Claim 18 (depends on 2)

A temporary girder used to the construction method for a girder in a bridge of claim 2, comprising:
a temporary girder base portion installed at a lower side thereof, and supported by contacting an upper surface of the coping; and
a temporary girder interval adjusting portion for adjusting an interval between a lower surface of the temporary girder and the temporary girder base portion.

### Claim 19 (depends on 2)

A temporary girder used to the construction method for a girder in a bridge of claim 2, comprising:
a temporary girder moving base portion installed on a lower surface of the temporary girder so as to be movable back and forth, and installed on an upper surface of the front coping or the next front coping, for preventing downward deformation of the temporary girder being moved towards a front side of the front coping; and
a moving base portion driving device for applying a driving force to the temporary girder moving base portion in back and forth directions.

### Claim 20 (depends on 10)

A temporary girder used to the construction method for a girder in a bridge together with the crane for pulling up a girder of claim 10, comprising:
a temporary girder moving base portion installed on a lower surface of the temporary girder so as to be movable back and forth, and installed on an upper surface of the front coping or the next front coping, for preventing downward deformation of the temporary girder being moved towards a front side of the front coping;
a moving base portion driving device for applying a driving force to the temporary girder moving base portion in back and forth directions; and
a moving base portion temporary coupling device for temporarily coupling the moving base portion to the temporary girder when the temporary girder is forward moved by the crane for pulling up a girder.

### Claim 21 (depends on 2)

A vehicle for carrying a girder, used to the construction method for a girder in a bridge of claim 2, comprising:
a left wheel operated by a guide of the first temporary girder or the first girder;
a right wheel operated by a guide of the second temporary girder or the second girder; and
a central body portion having a supporting portion for the girder at a central part thereof, for connecting the left and the right wheels with each other.

### Claim 22 (depends on 15)

A vehicle for carrying a girder, used to the construction method for a girder in a bridge together with the crane for pulling up a girder of claim 15, comprising:
a left wheel operated by a guide of the first temporary girder or the first girder;
a right wheel operated by a guide of the second temporary girder or the second girder; and
a central body portion having a supporting portion for the girder at a central part thereof, for connecting the left and right wheels with each other,
wherein one pair of right and left head portions are formed at a front end of the left wheel by being divided into two so as to be driven via one pair of temporary girder mounting and driving portions installed at right and left sides of the front left supporter,
wherein one pair of right and left head portions are formed at a front end of the right wheel by being divided into two so as to be driven via the one pair of temporary girder mounting and driving portions installed at right and left sides of the front right supporter.

### Claim 23 (depends on 22)

The vehicle for carrying a girder of claim 22, further comprising:
a wheel connecting portion installed at each front end of the one pair of head portions of the left wheel and the one pair of head portions of the right wheel, for connecting the respective one pair of head portions of the left and right wheels with each other; and
wheel connecting portion opening/closing means for opening and closing the wheel connecting portion, so as to prevent interference between the wheel connecting portion and the temporary girder mounting and driving portion while the wheel is driven.

### Claim 24 (depends on 23)

The vehicle for carrying a girder of claim 23, wherein the wheel connecting portion opening/closing means comprises:
a hinge portion installed at one end of the wheel connecting portion; and
a wheel connecting portion opening/closing device mounted at the hinge portion, for opening and closing another end of the wheel connecting portion.

### Claim 25 (depends on 7)

A vehicle for carrying a girder, used to the construction method for a girder in a bridge together with the crane for pulling up a girder of claim 7, comprising:
a left wheel operated by a guide of the first temporary girder or the first girder;
a right wheel operated by a guide of the second temporary girder or the second girder; and
a central body portion having a supporting portion for the girder at a central part thereof, for connecting the left and right wheels with each other,
wherein the supporting portion of the girder comprises:
one pair of wing portions for upward supporting the girder; and
a wing portion opening/closing device for inward closing the one pair of wing portions, so as to prevent interference between the one pair of wing portions and the supplementary supporter, at the time when the vehicle for carrying a girder is backward moved after the supplementary supporter is closed.

### Claim 26 (depends on 5)

A girder used to the construction method for a girder in a bridge together with the crane for pulling up a girder of claim 5, comprising:
a guide groove formed on an upper surface of the girder, for guiding a lower end of the rear left supporter or the rear right supporter of the crane for pulling up a girder, by a guide of the first and the second temporary girders installed at upper sides of the second front coping and the front coping, at the time when the crane for pulling up a girder is moved to be installed at upper sides of the next front coping and the front coping.

### Claim 27 (depends on 8)

A girder used to the construction method for a girder in a bridge together with the crane for pulling up a girder of claim 8, comprising:
a guide groove formed on an upper surface thereof, for guiding at least one lower end of the rear left supporter, the rear right supporter, or the supplementary supporter of the crane for pulling up a girder, by a guide of the first and the second temporary girders installed at upper sides of the next front coping and the front coping, at the time when the crane for pulling up a girder is moved to be installed at upper sides of the next front coping and the front coping.