# US 2008/0289823 A1 · Degradable Material Assisted Diversion or Isolation

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2008/0289823 A1
- Document ID: US20080289823A1
- Status: Published application
- Kind: A1
- Application number: 12/126,501
- Filed: 2008-08-08
- Published: 2008-11-27
- Earliest claimed: 2004-09-01
- Assignees: Schlumberger Technology Corporation
- Inventors: Dean M. Willberg; Marina Bulova; Christopher N. Fredd; Alexey Vostrukhov; Curtis L. Boney; John Lassek; Ann M.W. Hoefer; Philip F. Sullivan
- Web page: https://patentgrep.com/patent/US20080289823A1

## CPC

- C09K 8/80: Compositions for reinforcing fractures, e.g. compositions of proppants used to keep the fractures open
- C09K 8/42: Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells (compositions for plastering C09K8/50)
- C09K 8/467: containing additives for specific purposes
- C09K 8/508: macromolecular compounds {(C09K8/512 takes precedence)}
- C09K 8/68: containing organic compounds
- C09K 8/76: for preventing or reducing fluid loss
- E21B 43/26: by forming crevices or fractures
- E21B 2200/08: Down-hole devices using materials which decompose under well-bore conditions
- C09K: MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

A method for well treatment by forming a temporary plug in a fracture, a perforation, a wellbore, or more than one of these locations, in a well penetrating a subterranean formation is provided, in which the method of well treatment includes: injecting a slurry comprising a degradable material, allowing the degradable material to form a plug in a perforation, a fracture, or a wellbore in a well penetrating a formation; performing a downhole operation; and allowing the degradable material to degrade after a selected time such that the plug disappears.

## Claims

### Claim at position 1

1-37. (canceled)

### Claim 38

A method of well treatment, comprising:
a) injecting a slurry comprising a degradable material selected from the group consisting of powder, beads and chips,
b) allowing the degradable material to form a plug in one or more than one of a perforation, a fracture, and a wellbore in a well penetrating a formation;
c) performing a downhole operation; and
d) allowing the degradable material to at least partially degrade after a selected duration such that the plug disappears.

### Claim 39 (depends on 38)

The method of claim 38, wherein the degradable material is selected from a polymer of lactide, glycolide, polylactic acid, polyglycolic acid, amide, and mixtures thereof.

### Claim 40 (depends on 38)

The method of claim 38, wherein the degradable material is present at a concentration of no less than 40 lbm/1,000 gal (4.8 g/L).

### Claim 41 (depends on 38)

The method of claim 38, wherein the operation is a fracturing operation and the method further comprises injecting a second material to induce a screenout during the fracturing operation.

### Claim 42 (depends on 38)

The method of claim 38, wherein the slurry further comprises a particulate material.

### Claim 43 (depends on 42)

The method of claim 42, wherein the particulate material is degradable.

### Claim 44 (depends on 42)

The method of claim 42, wherein the particulate material is a proppant.

### Claim 45 (depends on 44)

The method of claim 44, wherein the proppant comprises particles having a distribution of sizes.

### Claim 46 (depends on 38)

The method of claim 38, wherein the slurry further comprises an additive for delaying degradation of the degradable material.

### Claim 47 (depends on 38)

The method of claim 38, wherein the slurry further comprises an additive for accelerating degradation of the degradable material.

### Claim 48 (depends on 38)

The method of claim 38, further comprising modeling to optimize parameters for the well treatment, wherein the step of injecting the slurry is based on the optimized parameters.

### Claim 49 (depends on 48)

The method of claim 48, wherein the optimized parameters comprise the selected duration before the degradable material degrades.

### Claim 50 (depends on 38)

The method of claim 38, wherein the well treatment comprises hydraulic fracturing.

### Claim 51 (depends on 50)

The method of claim 50, wherein the hydraulic fracturing comprises injecting a pad, said pad comprising the degradable material.

### Claim 52 (depends on 50)

The method of claim 50, wherein hydraulic fracturing is applied to more than one layer of a multilayer formation.

### Claim 53 (depends on 52)

The method of claim 52, wherein the step of injecting the slurry is performed at the tail end of fracturing a layer.

### Claim 54 (depends on 53)

The method of claim 53, wherein no bridge plug or sand plug is placed in the wellbore before fracturing a subsequent layer.

### Claim 55 (depends on 53)

The method of claim 53, wherein the slurry further comprises a proppant, wherein the degradable material forms the plug in the fracture by bridging with the proppant when placed in the fracture.

### Claim 56 (depends on 38)

The method of claim 38, wherein the well treatment comprises acid fracturing or waterfrac.

### Claim 57 (depends on 38)

The method of claim 38, wherein the selected duration for the plug to disappear is between 0.5 and 6 hours.

### Claim 58 (depends on 38)

The method of claim 38, wherein the step of injecting the slurry is via coiled tubing installed in the well.

### Claim 59 (depends on 38)

The method of claim 38 wherein the degradable material comprises a polyvinyl ester.

### Claim 60 (depends on 38)

The method of claim 38, wherein the treatment is used to isolate a region selected from the fracture, a production zone, and a part of the wellbore, wherein the part of the wellbore is above the formation pressure.

### Claim 61 (depends on 38)

The method of claim 38, wherein the degradable material is selected from limestone materials and glass materials.

### Claim 62 (depends on 39)

The method of claim 39, wherein the well treatment comprises chemical strimulation.

### Claim 63

A method of well treatment, comprising:
a) injecting a slurry comprising a degradable material selected from the group consisting of powder, beads, chips, fibers, or any combination thereof;
b) allowing the degradable material to form a plug in one or more than one of a perforation, a fracture, and a wellbore in a well penetrating a formation; and,
c) performing a downhole operation; and

### Claim 64 (depends on 64)

The method of claim 64, wherein the well treatment further comprises allowing the degradable material to at least partially degrade after a selected duration such that the plug disappears.

### Claim 65

A method of well treatment, comprising:
a) injecting a slurry comprising a degradable material selected from the group consisting of powder, beads, chips,
b) allowing the degradable material to form a plug in one or more than one of a perforation, a fracture, and a wellbore in a well penetrating a formation; and,
c) performing at least one downhole operation.
