# US 2008/0288364 A1 · Construction project submittal management

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2008/0288364 A1
- Document ID: US20080288364A1
- Status: Published application
- Kind: A1
- Application number: 12/123,998
- Filed: 2008-05-20
- Published: 2008-11-20
- Earliest claimed: 2003-10-24
- Inventors: ELBERT HARRIS
- Web page: https://patentgrep.com/patent/US20080288364A1

## CPC

- G06Q 10/06313: {Resource planning in a project environment}
- G06Q 10/063114: {Status monitoring or status determination for a person or group}
- G06Q 10/0875: Itemisation or classification of parts, supplies or services, e.g. bill of materials
- G06Q 20/10: specially adapted for electronic funds transfer [EFT] systems; specially adapted for home banking systems
- G06Q 30/0206: {Price or cost determination based on market factors}
- G06Q 30/0611: {Request for offers or quotes}
- G06Q 30/0637: {requiring approval before final submission, e.g. parental approval}
- G06Q 30/08: Auctions
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

A network based construction project management system. The system includes network accessible databases of project information including drawings and specifications. The system allows for varying amount of access for various user including general contractors, subcontractors, architects and project owners. The system allows for the effective creation, management and long term accessible storage of project submittals.

## Claims

### Claim 1

A method of completing construction project submittal requirements including the steps of:
submitting information to a submittal document stored on a component of a computer network, said component of said computer network being controlled by a subscription service provider, said submittal document including a set of actual material specifications to meet a set of required specifications for materials necessary to meet design parameters for the construction project;
requesting submittal document required information, including said set of actual material specifications, from access points connected to said computer network;
requesting approval through said computer network of said submittal document stored on said component of said computer network; and
archiving electronically completed submittal documents for future retrieval after a construction project is completed.

### Claim 2 (depends on 1)

The method of claim 1 wherein said computer network comprises the Internet.

### Claim 3 (depends on 1)

The method of claim 1 wherein at least one of said access points is a PDA or other portable device.

### Claim 4 (depends on 3)

The method as claimed in claim 3 further comprising the step of providing a limited set of capabilities to said PDA from a larger set of capabilities provided to other access points.

### Claim 5 (depends on 1)

The method as claimed in claim 1 wherein said submittal document is in an xml format.

### Claim 6 (depends on 1)

The method as claimed in claim 1 wherein said submittal document is selected from the group consisting of product data, samples, redline drawings, shop drawings, change orders, requests for information, requests for quotation, invoicing, prevailing wage rate reports, union wage rate reports and certification for payment.

### Claim 7 (depends on 1)

The method as claimed in claim 1 further comprising the step of deducting a fee from a prepaid account for each approval that is requested for a submittal document.

### Claim 8 (depends on 7)

The method as claimed in claim 7 further comprising the step of notifying a system user when said prepaid account falls below a threshold level.

### Claim 9 (depends on 1)

The method as claimed in claim 1 further comprising the steps of:
submitting a request for payment through said computer network;
requesting approval through said computer network of said request for payment;
notifying a payor upon approval of said request for payment through said computer network; and
completing payment by said payor for said request for payment.

### Claim 10 (depends on 9)

The method as claimed in claim 9 further comprising the step of limiting access to said request for payment to specified users of said subscription service provider.

### Claim 11 (depends on 1)

The method as claimed in claim 1 wherein said computer network includes a project bidding system that is controlled by said subscription service provider.

### Claim 12 (depends on 11)

The method as claimed in claim 11 wherein information from said bidding system may be accessed for utilization in said submittal document.

### Claim 13 (depends on 11)

The method as claimed in claim 11, wherein said bidding system utilizes a method for receiving bids comprising the steps of:
creating a bid request prior to said submitting step;
posting said bid request on said computer network;
receiving sealed electronic bids over said computer network;
storing said sealed bids unopened until a specified time;
essentially simultaneously opening all said sealed bids at an electronic bid opening accessible to bidders via said computer network.

### Claim 14

A method of managing submittals for a construction project, said method comprising the steps of:
preparing a submittal containing requirements and/or specifications for at least a component of the construction project including a set of required specifications for materials necessary to meet design parameters for the construction project;
posting at least required specifications of the submittal at a central location controlled by a service provider;
accessing the submittal at the central location by a contributor to the submittal;
completing the submittal by the contributor by providing a set of actual material specifications to meet said set of required specifications;
updating the posting of the submittal to include the completed submittal at the central location; and
archiving electronically completed submittal documents for future retrieval after a construction project is completed.

### Claim 15 (depends on 14)

The method as claimed in claim 14 further comprising the step of notifying the contributor electronically of the posting, and/or updating, of the submittal at the central location.

### Claim 16 (depends on 15)

The method as claimed in claim 15 wherein said step of notifying the contributor comprises automatically sending an email message upon achievement of said step of posting, and/or updating, the submittal at the central location.

### Claim 17 (depends on 14)

The method as claimed in claim 14 wherein said contributor comprises a subcontractor on the construction project.

### Claim 18 (depends on 14)

The method as claimed in claim 14 wherein said step of preparing the submittal is performed by a prime contractor on the construction project.

### Claim 19 (depends on 14)

The method as claimed in claim 14 wherein said steps of posting and updating are accomplished electronically.

### Claim 20 (depends on 19)

The method as claimed in claim 19 wherein said steps of electronically posting and updating are accomplished on an Internet website.

### Claim 21 (depends on 14)

The method as claimed in claim 14 further comprising the steps of approving the submittal and updating the posting to include the approved submittal at the central location.

### Claim 22 (depends on 14)

The method as claimed in claim 14 further comprising the step of storing a submittal history, said submittal history including information on when specific submittal information was updated and who was responsible for responding to the submittal and any resulting impact on the schedule of the construction project.

### Claim 23 (depends on 22)

The method as claimed in claim 22 wherein said submittal history is maintained beyond completion of the construction project.

### Claim 24 (depends on 22)

The method as claimed in claim 22 wherein said submittal history includes submittal information.

### Claim 25 (depends on 14)

The method as claimed in claim 14 further comprising the step of tracking submittal information.

### Claim 26 (depends on 25)

The method as claimed in claim 25 wherein said step of tracking submittal information comprises the step of updating a submittal history archive.

### Claim 27

A method of managing submittals for a construction project, said method comprising the steps of:
storing information regarding a submittal document on a component of a computer network, said component of said computer network being controlled by a subscription service provider, said submittal document including a set of actual material specifications to meet a set of required specifications for materials necessary to meet design parameters for the construction project;
storing information regarding system users on another component of a computer network, said another component of said computer network being controlled by said subscription service provider;
receiving submittal document required information, including said set of actual material specifications, from at least one system user via an access point connected to said computer network;
requesting approval by an other system user through said computer network of said submittal document stored on said component of said computer network;
archiving electronically completed submittal documents for future retrieval after a construction project is completed; and
archiving information regarding when said submittal document was updated and who updated.