# US 2008/0258557 A1 · Multiple generator loadcenter and method of distributing power from multiple generators

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2008/0258557 A1
- Document ID: US20080258557A1
- Status: Published application
- Kind: A1
- Application number: 11/738,832
- Filed: 2007-04-23
- Published: 2008-10-23
- Earliest claimed: 2007-04-23
- Assignees: Eaton Corporation
- Inventors: Todd M. Lathrop; Jonathan A. Wehrli
- Web page: https://patentgrep.com/patent/US20080258557A1

## CPC

- H02J 3/14: by switching loads on to, or off from, the networks, e.g. progressively balanced loading
- H02J 9/06: with automatic change-over {, e.g. UPS systems}
- H02J 2105/51: {according to a condition being electrical}
- Y02B 70/30: Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B 70/3225: Demand response systems, e.g. load shedding, peak shaving
- Y04S 20/222: Demand response systems, e.g. load shedding, peak shaving
- Y04S 20/248: UPS systems or standby or emergency generators
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

A loadcenter supplies power to a non-critical load, a critical load and an ultra-critical load, and is capable of isolating a first distribution panel distributing power to the non-critical load from a second distribution panel distributing power to the critical load to enable the isolated distribution panels to be supplied with power from separate generator power sources in response to power supplied by a utility power source to both distribution panels becoming unacceptable. A third distribution panel distributes power to the ultra-critical load and is selectively supplied with alternating current (AC) power from either the second distribution panel, when the second distribution panel has AC power, or from AC power generated from direct current (DC) power stored in a battery when the second distribution panel lacks AC power.

## Claims

### Claim 1

A loadcenter for a first power source having a first status, a second power source having a second status, a third power source having a third status, a battery having a fourth status, a non-critical load, a critical load, and an ultra-critical load, said loadcenter comprising:
a first distribution panel having a first circuit breaker to selectively receive power from the first power source;
a second distribution panel having a second circuit breaker to selectively receive power from the second power source;
a third distribution panel;
a third circuit breaker to selectively supply power from the third power source to the first distribution panel;
a fourth circuit breaker to selectively supply power from the first distribution panel to the non-critical load;
a fifth circuit breaker to selectively supply power from the second distribution panel to the critical load;
a sixth circuit breaker to selectively supply power from the third distribution panel to the ultra-critical load;
a circuit isolator to selectively supply power from the first distribution panel to the second distribution panel;
an uninterruptible power supply circuit structured to selectively receive power from one of the battery and the second distribution panel and to supply power to the third distribution panel; and
a controller structured to monitor at least the second status and the third status, and in response to the second power source being unacceptable and the third power source being unacceptable, being further structured to:
open the third circuit breaker;
open the second circuit breaker;
close the circuit isolator; and
close the first circuit breaker.

### Claim 2 (depends on 1)

The loadcenter of claim 1, wherein the fourth circuit breaker is structured to shed the non-critical load; wherein the fifth circuit breaker is structured to shed the critical load; and wherein the controller is further structured to signal at least one of the fourth circuit breaker to shed the non-critical load and the fifth circuit breaker to shed the critical load in response to the first power source providing power to both the first distribution panel and the second distribution panel.

### Claim 3 (depends on 2)

The loadcenter of claim 2, wherein the controller is structured to monitor the amount of power drawn from the first power source, and to be programmable to shed one or more loads supplied with power from the first power source in response to the amount of power drawn from the first power source.

### Claim 4 (depends on 1)

The loadcenter of claim 1, wherein the controller, in response to the third power source being unacceptable and the second power source being acceptable, is further structured to:
open the third circuit breaker;
open the circuit isolator;
close the first circuit breaker; and
close the second circuit breaker.

### Claim 5 (depends on 4)

The loadcenter of claim 4, wherein the controller is further structured to monitor the amount of power drawn from the second power source, and to be programmable to shed one or more loads supplied with power from the second power source in response to the amount of power drawn from the second power source.

### Claim 6 (depends on 1)

The loadcenter of claim 1, wherein the first and second power sources are generator power sources, and wherein the controller is further structured to be programmable with data concerning the power output capacity of the first power source and the second power source.

### Claim 7 (depends on 1)

The loadcenter of claim 1, wherein the uninterruptible power supply circuit is structured to recharge the battery in response to the second distribution panel having power.

### Claim 8 (depends on 7)

The loadcenter of claim 7, wherein the uninterruptible power supply circuit is further structured to monitor the fourth status and cease drawing power from the battery in response to the battery being depleted to a predetermined level.

### Claim 9 (depends on 7)

The loadcenter of claim 7, wherein the uninterruptible power supply circuit is further structured to monitor the fourth status and cease supplying power to the third distribution panel in response to the battery being depleted to a predetermined level and the second distribution panel having no power.

### Claim 10

A loadcenter for a first power source having a first status, a second power source having a second status, a third power source having a third status, a fourth power source having a fourth status, a fifth power source having a fifth status, a first non-critical load, a second non-critical load, a first critical load and a second critical load, said loadcenter comprising:
a first distribution panel having a first circuit breaker to selectively receive power from the first power source;
a second distribution panel having a second circuit breaker to selectively receive power from the second power source;
a third distribution panel having a third circuit breaker to selectively receive power from the third power source;
a fourth distribution panel having a fourth circuit breaker to selectively receive power from the second power source;
a fifth circuit breaker to selectively supply power from the fifth power source to the first distribution panel;
a first circuit isolator to selectively supply power from the first distribution panel to the second distribution panel;
a second circuit isolator to selectively supply power from the first distribution panel to the third distribution panel;
a third circuit isolator to selectively supply power from the third distribution panel to the fourth distribution panel;
a sixth circuit breaker to selectively supply power from the first distribution panel to the first non-critical load;
a seventh circuit breaker to selectively supply power from the second distribution panel to the first critical load;
an eighth circuit breaker to selectively supply power from the third distribution panel to the second non-critical load;
a ninth circuit breaker to selectively supply power from the fourth distribution panel to the second critical load;
a controller structured to monitor at least the first status, the third status and the fifth status, and in response to the third power source being unacceptable and the fifth power source being unacceptable, being further structured to:
open the fifth circuit breaker;
open the third circuit breaker;
close the first circuit breaker; and
close the second circuit isolator.

### Claim 11 (depends on 10)

The loadcenter of claim 10, wherein the sixth circuit breaker is structured to shed the first non-critical load, wherein the eighth circuit breaker is structured to shed the second non-critical load, and wherein the controller is further structured to signal at least one of the sixth circuit breaker to shed the first non-critical load and the eighth circuit breaker to shed the second non-critical load in response to the first power source providing power to both the first distribution panel and the third distribution panel.

### Claim 12 (depends on 11)

The loadcenter of claim 11, wherein the controller is further structured to monitor the amount of power drawn from the first power source, and to be programmable to shed one or more loads supplied with power from the first power source in response to the amount of power drawn from the first power source.

### Claim 13 (depends on 10)

The loadcenter of claim 10, wherein the controller, in response to the first power source being unacceptable and the fifth power source being unacceptable, is further structured to:
open the fifth circuit breaker;
open the first circuit breaker;
close the third circuit breaker; and
close the second circuit isolator.

### Claim 14 (depends on 13)

The loadcenter of claim 13, wherein the sixth circuit breaker is structured to shed the first non-critical load; wherein the eighth circuit breaker is structured to shed the second non-critical load; and wherein the controller is further structured to signal at least one of the sixth circuit breaker to shed the first non-critical load and the eighth circuit breaker to shed the second non-critical load in response to the third power source providing power to both the first distribution panel and the third distribution panel.

### Claim 15 (depends on 14)

The loadcenter of claim 14, wherein the controller is further structured to monitor the amount of power drawn from the third power source, and to be programmable to shed one or more loads supplied with power from the third power source in response to the amount of power drawn from the third power source.

### Claim 16 (depends on 10)

The loadcenter of claim 10, wherein the controller, in response to the fifth power source being unacceptable and the second power source being acceptable, is further structured to:
open the fifth circuit breaker;
open the first circuit isolator; and
close the second circuit breaker.

### Claim 17 (depends on 10)

The loadcenter of claim 10, wherein the first, second, third and fourth power sources are generator power sources, and wherein the controller is further structured to be programmable with data concerning the power output capacity of the first, second, third and fourth power sources.

### Claim 18 (depends on 17)

The loadcenter of claim 17, wherein the data includes a predetermined level of current usage of power supplied by at least one of the first, second, third and fourth power sources at which the shedding of at least one load is triggered.

### Claim 19 (depends on 10)

The loadcenter of claim 10, wherein the first, second and third circuit isolators are contactors.

### Claim 20

A loadcenter for a first power source having a first status, a second power source having a second status, a third power source having a third status, a fourth power source having a fourth status, a fifth power source having a fifth status, a first battery having a sixth status, a second battery having a seventh status, a first non-critical load, a second non-critical load, a first critical load, a second critical load, a first ultra-critical load and a second ultra-critical load, said loadcenter comprising:
a first distribution panel having a first circuit breaker to selectively receive power from the first power source;
a second distribution panel having a second circuit breaker to selectively receive power from the second power source;
a third distribution panel having a third circuit breaker to selectively receive power from the third power source;
a fourth distribution panel having a fourth circuit breaker to selectively receive power from the fourth power source;
a fifth distribution panel;
a sixth distribution panel;
a fifth circuit breaker to selectively supply power from the fifth power source to the first distribution panel;
a first circuit isolator to selectively supply power from the first distribution panel to the second distribution panel;
a second circuit isolator to selectively supply power from the first distribution panel to the third distribution panel;
a third circuit isolator to selectively supply power from the third distribution panel to the fourth distribution panel;
a sixth circuit breaker to selectively supply power from the first distribution panel to the first non-critical load;
a seventh circuit breaker to selectively supply power from the second distribution panel to the first critical load;
an eighth circuit breaker to selectively supply power from the third distribution panel to the second non-critical load;
a ninth circuit breaker to selectively supply power from the fourth distribution panel to the second critical load;
a tenth circuit breaker to selectively supply power from the fifth distribution panel to the first ultra-critical load;
an eleventh circuit breaker to selectively supply power from the sixth distribution panel to the second ultra-critical load;
a first uninterruptible power supply circuit structured to selectively receive power from one of the first battery and the second distribution panel and to supply power to the fifth distribution panel;
a second uninterruptible power supply circuit structured to selectively receive power from one of the second battery and the fourth distribution panel and to supply power to the sixth distribution panel; and
a controller structured to monitor at least the second status and the fifth status, and in response to the second power source being unacceptable and the fifth power source being unacceptable, being further structured to:
open the fifth circuit breaker;
open the second circuit breaker;
close the first circuit isolator; and
close the first circuit breaker.

### Claim 21 (depends on 20)

The loadcenter of claim 20, wherein the controller is further structured to monitor the first status and the third status, and in response to the first power source being unacceptable, the second power source being unacceptable, the third power source being unacceptable and the fifth power source being unacceptable, being further structured to:
open the fifth circuit breaker;
open the first circuit breaker;
open the second circuit breaker;
open the third circuit breaker;
close the first circuit isolator;
close the second circuit isolator;
close the third circuit isolator; and
close the fourth circuit breaker.

### Claim 22 (depends on 21)

The loadcenter of claim 21, wherein the controller is further structured to monitor the amount of power drawn from the fourth power source, and to be programmable to shed one or more of the first non-critical load, the second non-critical load, the first critical load and the second critical load in response to the amount of power drawn from the fourth power source.