# US 2008/0077380 A1 · Power consumption peak estimation program for LSI and device therefor

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2008/0077380 A1
- Document ID: US20080077380A1
- Status: Published application
- Kind: A1
- Application number: 11/896,943
- Filed: 2007-09-06
- Published: 2008-03-27
- Earliest claimed: 2006-09-06
- Assignees: Fujitsu Limited
- Inventors: Kazuhide Tamaki; Ryuji Fujita; Junichi Nitsuma; Takayuki Sasaki
- Web page: https://patentgrep.com/patent/US20080077380A1

## CPC

- G06F 30/33: Design verification, e.g. functional simulation or model checking
- G06F 30/367: Design verification, e.g. using simulation, simulation program with integrated circuit emphasis [SPICE], direct methods or relaxation methods
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

As a program tool of the embodiment estimating the peak of power consumption, primary processing is performed in which logic simulation is executed in a first time period to extract operation data of a gated clock for every predetermined section within the first time period, e.g. operation waveform data or data on the number of operations. Then, a narrowed section, which is composed of one or more sections and in which the switching activity per unit time is higher compared to other sections, is discovered, the switching activity being obtained from the operation data, and this narrowed section is taken as a second time period. Then, secondary processing is performed in which logic simulation is executed in the second time period to extract signal waveform data for every clock cycle and obtain power consumption data corresponding to the clock cycles from the extracted signal waveform data.

## Claims

### Claim 1

A power consumption peak estimation program estimating a power consumption peak, the program causing a computer to construct:
a primary processing unit, which executes logical simulation on the netlist throughout a first time period to extract operation data of a gated clock for every predetermined section within the first time period;
a secondary processing unit, which executes logical simulation on the netlist throughout a narrowed section to extract signal waveform data for every clock cycles in the narrowed section, the narrowed section being composed of one or a plurality of sections in which the switching activity of the gated clock, which is obtained from the operation data extracted by the primary processing unit, is higher than the switching activity in other sections; and
a power consumption generating unit, which generates power consumption data corresponding to the clock cycles, from the signal waveform data extracted by the secondary processing unit.

### Claim 2 (depends on 1)

The power consumption peak estimation program according to claim 1, wherein
the primary processing unit repeats the primary processing a plurality of times, and in primary processing subsequent to a first primary processing, the logical simulation is executed on the netlist throughout a narrowed section to extract the operation data for every section which is shorter than the predetermined section in a previous primary processing, the narrowed section being composed of one or a plurality of sections in which the switching activity of the gated clock, which is obtained from the operation data extracted by the previous primary processing, is higher than the switching activity in other sections.

### Claim 3 (depends on 1)

The power consumption peak estimation program according to claim 1, wherein the primary processing unit performs logical simulation on the netlist of the LSI to extract the signal waveform data of the gated clock as the operation data.

### Claim 4 (depends on 1)

The power consumption peak estimation program according to claim 1, wherein the primary processing unit adds a counter counting the number of pulses of the gated clock to the netlist of the LSI so as to generate a counter-added netlist, executes the logical simulation on the counter-added netlist, and extracts a counter value of the counter as the operation data.

### Claim 5 (depends on 4)

The power consumption peak estimation program according to claim 4, wherein the primary processing unit extracts the counter value of the counter for the each predetermined section.

### Claim 6 (depends on 1)

The power consumption peak estimation program according to claim 1, wherein the switching activity of the gated clock is subjected to weighting processing on the basis of a weighting coefficient allocated to a circuit to which the gated clock is supplied, and the narrowed section is determined based on the switching activity which is subjected to the weighting processing.

### Claim 7

A power consumption peak estimation program estimating a power consumption, the program causing a computer to construct:
a counter-added netlist generating unit, which generates, from the netlist, a counter-added netlist in which a counter counting the number of changes of a gated clock is added to a gated clock buffer within the netlist;
a primary processing unit, which executes logical simulation on the counter-added netlist throughout a first time period, and extracts a counter value of the gated clock for every predetermined section within the first time period;
a narrowed section determining unit, which determines a narrowed section which is composed of one or a plurality of sections in which switching activity of the gated clock, which is obtained from the counter value extracted by the primary processing unit, is higher than the switching activity in other sections;
a secondary processing unit, which executes logical simulation on the netlist throughout the narrowed section to extract signal waveform data for every clock cycles in the narrowed section; and
a power consumption generating unit, which generates power consumption data corresponding to the clock cycles, from the signal waveform data extracted by the secondary processing unit.

### Claim 8 (depends on 7)

The power consumption peak estimation program according to claim 7, wherein
the primary processing unit repeats the primary processing a plurality of times, and in primary processing subsequent to a first primary processing, the logical simulation is executed on the counter-added netlist throughout a narrowed section to extract the operation data for every section which is shorter than the predetermined section in a previous primary processing, the narrowed section being composed of one or a plurality of sections in which the switching activity of the gated clock, which is obtained from the counter value extracted by the previous primary processing, is higher than the switching activity in other sections.

### Claim 9 (depends on 7)

The power consumption peak estimation program according to claim 7, wherein the switching activity of the gated clock is subjected to weighting processing on the basis of a weighting coefficient allocated to a circuit to which the gated clock is supplied, and the narrowed section is determined based on the switching activity which is subjected to the weighting processing.

### Claim 10

A power consumption peak estimation device estimating a power consumption peak, the power consumption peak estimation device comprising:
a primary processing unit, which executes logical simulation on the netlist throughout a first time period to extract operation data of a gated clock for every predetermined section within the first time period;
a secondary processing unit, which executes logical simulation on the netlist throughout a narrowed section to extract signal waveform data for every clock cycles in the narrowed section, the narrowed section being composed of one or a plurality of sections in which the switching activity of the gated clock, which is obtained from the operation data extracted by the primary processing unit, is higher than the switching activity in other sections; and
a power consumption generating unit, which generates power consumption data corresponding to the clock cycles, from the signal waveform data extracted by the secondary processing unit.

### Claim 11 (depends on 10)

The power consumption peak estimation device according to claim 10, wherein
the primary processing unit repeats the primary processing a plurality of times, and in primary processing subsequent to a first primary processing, the logical simulation is executed on the netlist throughout a narrowed section to extract the operation data for every section which is shorter than the predetermined section in a previous primary processing, the narrowed section being composed of one or a plurality of sections in which the switching activity of the gated clock, which is obtained from the operation data extracted by the previous primary processing, is higher than the switching activity in other sections.

### Claim 12

A power consumption peak estimation device estimating a power consumption, the power consumption peak estimation device comprising:
a counter-added netlist generating unit, which generates, from the netlist, a counter-added netlist in which a counter counting the number of changes of a gated clock is added to a gated clock buffer within the netlist;
a primary processing unit, which executes logical simulation on the counter-added netlist throughout a first time period, and extracts a counter value of the gated clock for every predetermined section within the first time period;
a narrowed section determining unit, which determines a narrowed section which is composed of one or a plurality of sections in which switching activity of the gated clock, which is obtained from the counter value extracted by the primary processing unit, is higher than the switching activity in other sections;
a secondary processing unit, which executes logical simulation on the netlist throughout the narrowed section to extract signal waveform data for every clock cycles in the narrowed section; and
a power consumption generating unit, which generates power consumption data corresponding to the clock cycles, from the signal waveform data extracted by the secondary processing unit.

### Claim 13 (depends on 12)

The power consumption peak estimation device according to claim 12, wherein
the primary processing unit repeats the primary processing a plurality of times, and in primary processing subsequent to a first primary processing, the logical simulation is executed on the counter-added netlist throughout a narrowed section to extract the operation data for every section which is shorter than the predetermined section in a previous primary processing, the narrowed section being composed of one or a plurality of sections in which the switching activity of the gated clock, which is obtained from the counter value extracted by the previous primary processing, is higher than the switching activity in other sections.
