Method and interface to assist a senior manager reassign project work in a crisis-like situation
OwnerPrem Kiraninventor
Life of this patent
Estimating the term…
Loading patent…
OwnerPrem Kiraninventor
Estimating the term…
A method for enabling a senior manager/VP to reassign an affected project when a current manager resigns, uses a fact-driven approach to find a quick replacement manager (if necessary) with the full knowledge of the impact of the project reassignment on the organization. The senior manager uses a UI connected to a database with updated information (and optionally flash files) regarding all inputs which the senior manager would need to arrive at the decision through the use of a flow chart. Also taught is an article comprising a storage medium having instructions thereon which when executed by a computing platform will result in execution of the method. The invention may be implemented in a knowledge-based development system such as Netweaver®, or service oriented architecture SOA®. The flow chart can be tailored to cater varied customer requirements. The current database status is accessible to all senior managers/VPs through a validated interface.
A method for use by a senior manager in an organization for facilitating and automating reassignment of certain project work when said project work becomes interrupted because of a manger handling said certain project work becomes unavailable, comprising the steps of:
A user interface (UI) for use by a senior manager in an organization for facilitating and automating reassignment of certain project work during urgent need such as when said certain project work becomes interrupted because of a manger handling said certain project work becomes unavailable, comprising a UI station for use by the senior manager and connected to an organization database/information source and configured for:
An article comprising a storage medium having instructions thereon which when executed by a computing platform will result in execution of a method for use by a senior manager in an organization for facilitating and automating reassignment of certain project work when said project work becomes interrupted because of a manger handling said certain project work becomes unavailable, comprising the steps of: