# US 2007/0041793 A1 · Fine-grained fill reinforcing apparatus and method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2007/0041793 A1
- Document ID: US20070041793A1
- Status: Published application
- Kind: A1
- Application number: 11/511,079
- Filed: 2006-08-28
- Published: 2007-02-22
- Earliest claimed: 2005-06-16
- Assignees: Mega Corporation
- Inventors: Arthur Moss
- Web page: https://patentgrep.com/patent/US20070041793A1

## CPC

- E02D 29/0208: {Gabions}
- E02B 3/127: {bags filled at the side}
- E02D: FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B); UNDERGROUND OR UNDERWATER STRUCTURES {(tunnels, tunnelling, mining E21)}
- E02B: HYDRAULIC ENGINEERING (ship-lifting E02C; dredging E02F)

## Abstract

A geosynthetic reinforcement comprising a container formed of semipermeable material mutually conformed with a portion of earthen material contained therein. A structural member such as a geogrid may engage (e.g. frictional) the container and extend therefrom to engage and support a structure such as a retaining wall, earthen slope, etc. Accordingly, the container may function as an anchor to the structure. Due to the containment provided by the container, the physical characteristics of the earthen material therewithin become less important. Thus, low quality fills such as fine-grained fill or fill with a high moisture content may be used in structural applications. If desired, more than one container and structural member may be incorporated. Containers may be stacked, positioned side-by-side, positioned end-to-end, etc. Structural members may be incorporated as needed to adequate support the structure. Drain layers may be incorporated to control moisture. In some cases, containers may comprise geotextile tubes.

## Claims

### Claim at position 1

1-20. (canceled)

### Claim 21

A reinforcement comprising:
a material comprising particles having at least one of a sufficiently small size, sufficiently high moisture content, and sufficiently high percent concentration in the material as to impart a shear strength in the material insufficient to support a desired structure connected thereto;
a first container formed of a first semipermeable material and conformally containing a first quantity of the material;
a second container formed of a second semipermeable material and conformally containing a second quantity of the material;
the first container, wherein the semipermeable material is selected to be effective to drain moisture therefrom at a rate sufficient to increase the effective shear strength of the material therein sufficiently to support the second container thereon; and
the second container stacked to be supported by the first container.

### Claim 22 (depends on 21)

The reinforcement of claim 21, wherein the first container is substantially tubular.

### Claim 23 (depends on 21)

The reinforcement of claim 21, further comprising a first structural member positioned between the first and second containers and transferring tensile loads applied thereto to the first and second containers.

### Claim 24 (depends on 23)

The reinforcement of claim 23, further comprising an outer layer secured to the first structural member to provide a facing over the first and second containers.

### Claim 25 (depends on 24)

The reinforcement of claim 24, wherein the facing has at least one of a size, texture, structure, and position providing at least one of a change the aesthetic appearance of the reinforcement, a space extending laterally between the facing and the first and second containers, protection on top of the second container, and a structure standing on top of the second container.

### Claim 26 (depends on 21)

The reinforcement of claim 21, wherein the first and second semipermeable materials are geosynthetics permeable to water and substantially impermeable to the material.

### Claim 27 (depends on 21)

The reinforcement of claim 21, further comprising a first drain layer positioned between the first and second containers and forming a network of voids conducting a flow of water through the drain layer.

### Claim 28 (depends on 27)

The reinforcement of claim 27, wherein the first drain layer is formed by a portion of the second container and a portion of the first container in contact with one another.

### Claim 29 (depends on 27)

The reinforcement of claim 27, wherein the first drain layer comprises a third material positioned between the first and second containers to form a network of voids substantially larger than voids corresponding to the porosity of the semipermeable material.

### Claim 30 (depends on 1)

The reinforcement of claim 1, further comprising:
a first drain layer positioned between the first and second containers;
a third container formed of a third semipermeable material, conformally containing a third quantity of the earthen material, and stacked to be supported by the second container;
a second structural layer positioned between the second and third containers, the second structural layer transferring tensile loads applied thereto to the second and third containers; and
a second drain layer positioned between the second and third containers.

### Claim 31

A retaining wall reinforcement comprising:
of particles imparting a shear strength insufficient to support a structure conected thereto;
earthen material;
a first container, formed of semipermeable material mutually conformed with a portion of the earthen material contained therein;
a retaining wall; and
a first structural member engaging the first container and extending to engage the retaining wall.

### Claim 32 (depends on 31)

The retaining wall reinforcement of claim 31, wherein the first structural member transfers at least a portion of the outwardly directed loads imposed on the retaining wall to the first container.

### Claim 33 (depends on 32)

The retaining wall reinforcement of claim 32, further comprising:
a second container stacked to be supported by the first container;
the first structural member extending from between the first and second containers to engage the retaining wall; and
the first and second containers comprising geotextile tubes.

### Claim 34

A method comprising:
preparing a surface upon which to place a structure;
positioning a first containment formed of a semipermeable geosynthetic material over the surface;
filling the first containment with a material comprising particles having at least one of a sufficiently small size, sufficiently high moisture content, and sufficiently high percent concentration in the material as to impart a shear strength in the material insufficient to support the structure;
positioning a second containment comprising a semipermeable geosynthetic material over the first containment;
filling the second containment with a material comprising particles having at least one of a sufficiently small size, sufficiently high moisture content, and sufficiently high percent concentration in the material as to impart a shear strength in the material insufficient to support the structure;
constructing a structure proximate the first and second containments; and
securing the structure to at least one of the first and second containments to support the structure.

### Claim 35 (depends on 34)

The method of claim 34, wherein the structure is a facing covering at leat one of the first and second containments.

### Claim 36 (depends on 35)

The method of claim 35, wherein the facing is selected from a retaining wall, a protective layer, a berm, and a fill material.

### Claim 37 (depends on 34)

The method of claim 34, further comprising backfilling behind the first and second containments with earthen material having a combination of particle size, moisture content, and particle distribution imparting a shear strength insufficient to support itself at the time of backfilling.

### Claim 38 (depends on 36)

The method of claim 36, further comprising positioning a drain layer over the surface before positioning the first containment.

### Claim 39 (depends on 37)

The method of claim 37, further comprising positioning a geosynthetic drain layer between the first and second containments and draining water therethrough from the earthen material.