Turbine starting controller and turbine starting control method
AssigneeKabushiki Kaisha Toshiba
InventorsKoji Yakushi, Akimasa Nakai
Life of this patent
Estimating the term…
Loading patent…
AssigneeKabushiki Kaisha Toshiba
InventorsKoji Yakushi, Akimasa Nakai
Estimating the term…
A turbine starting controller includes: an optimum starting control unit for predicting, while taking as a variable a turbine acceleration rate/load increase rate as a directly manipulated variable, thermal stress generated in a turbine rotor over a prediction period from a current time to the future, calculating for each control cycle a manipulated variable optimum transition pattern in the prediction period which makes a turbine starting time shortest while keeping the predicted thermal stress equal to or lower than a prescribed value, and determining as an actual optimum manipulated value a value at the current time in the manipulated variable optimum transition pattern; and an rpm/load control unit to which the optimum manipulated variable from the optimum starting control unit is input, for controlling the drive of control valves.
A turbine starting controller for adjusting and controlling an amount of steam or gas flowing into a turbine using a control valve, comprising:
A turbine starting control method for adjusting and controlling an amount of steam or gas flowing into a turbine using a control valve, comprising:
A turbine starting controller for adjusting and controlling an amount of steam or gas flowing into a turbine, comprising:
A turbine starting control method for a turbine having a control valve for adjusting and controlling an amount of steam or gas flowing into the turbine, comprising:
Dependencies are inferred from the claim text.