LNG power plant and operation method thereof
AssigneeKabushiki Kaisha Toshiba
InventorsShiro Hino, Shunji Nakagawa, Hiroshi Tsuji, Shigeru Misumi, Yoichi Sugimori
Life of this patent
Estimating the term…
Loading patent…
AssigneeKabushiki Kaisha Toshiba
InventorsShiro Hino, Shunji Nakagawa, Hiroshi Tsuji, Shigeru Misumi, Yoichi Sugimori
Estimating the term…
An LNG (liquefied natural gas) power plant has a heating/cooling device. The heating/cooling device is controlled by a command generated by a temperature control device. The temperature control device receives a heating value and a temperature of the fuel gas. The heating value of the fuel gas introduced to a gas turbine power generation unit from an LNG vaporization facility is detected by a heating value detector. The temperature of the fuel gas is detected by a temperature detector. A target temperature calculator installed in the temperature control device calculates a target temperature based on the heating value. A command generator installed in the temperature control device generates the command by comparing the target temperature and the fuel temperature.
An LNG power plant comprising:
A fuel gas temperature control system for an LNG power plant having a gas turbine power generation unit having a gas turbine and a power generator, an LNG vaporization facility configured to feed vaporized LNG as a fuel gas to the gas turbine power generation unit, and a gas feed pipe extended from the LNG vaporization facility to the gas turbine power generation unit, the system comprising:
A method of operating an LNG power plant, the method comprising:
The method of operating an LNG power plant of claim 15, wherein:
Dependencies are inferred from the claim text.