US 2006/0136871 A1Published application
Method and system for holistic project management
AssigneeBank of America Corporation
InventorsTim O'Connor, Eric Seal, Michael Inniss
Life of this patent
Estimating the term…
Abstract
A method for holistic project management may include presenting a graphical user interface for a user to enter project information for a project. The method may also include determining a priority for the project based on an impact of the project to each of a plurality of predetermined drivers.
Claims33
A method for holistic project management, comprising:
- presenting a graphical user interface for a user to enter project information for a project;
- and
- determining a priority for the project based on an impact of the project to each of a plurality of predetermined drivers.
A method for holistic project management, comprising:
- presenting a graphical user interface for a user to enter project information for a project;
- and
- determining a priority for the project based on an impact of the project to each of a plurality of predetermined drivers
- providing means to enter or select a level of impact for each of the plurality of predetermined drivers including a risk driver;
- a growth driver;
- a product and service driver;
- a customer delight driver;
- a productivity driver;
- and an associate satisfaction driver;
- determining the priority as a function of a level of importance assigned to each of selected ones of the plurality of predetermined drivers and the impact selected for each driver.
7 more elements
A system for holistic project management, comprising:
- a data structure operable on a processor to present a graphical user interface for a user to enter project information;
- and
- a data structure operable on the processor to determine a priority for the project based on an impact of the project to each of a plurality of predetermined drivers.
A computer-readable medium having computer executable instructions for performing a method, the method comprising:
- presenting a graphical user interface for a user to enter project information for a project;
- and
- determining a priority for the project based on an impact of the project to each of a plurality of predetermined drivers.