Method for generating a substantially uninterrupted connection of the peripheral wall portions of two adjacent tubular segments
AssigneeGeneral Electric Company
InventorsWolfgang Fuellhaas, Holger Luhn
Life of this patent
Estimating the term…
Loading patent…
AssigneeGeneral Electric Company
InventorsWolfgang Fuellhaas, Holger Luhn
Estimating the term…
The method for generating a substantially uninterrupted connection of the peripheral wall portions of two adjacent tubular segments each provided with flanges having holes therein, of a tower, in particular for a wind energy turbine, comprises the steps of: arranging a first tubular segment (18) and a second tubular segment (20) with said flanges (26, 28) thereof facing each other and said holes (34, 36) in said flanges (26, 28) aligned with each other; connecting said tubular segments (18, 20) by prefastening screws (38) extending through said aligned holes (34, 36) in said flanges (26, 28); forming into the side (50) of the tubular segments (18, 20) opposite to the flanges (26, 28) a notch (52) of a predetermined width at least at a location of said contacting flanges (26, 28) where a gap (48) having a width greater than a minimum width exists; inserting into said notch (52) at least one insert part (60) having a width substantially equal to the width of said notch (52); and completely fastening said screws (38) connecting said flanges 826, 28) of said tubular segments (18, 20) providing a substantially uninterrupted connection of said peripheral wall portions (22, 24) of said tubular segments (18, 20) through said at least one insert part (60).
Method for generating a substantially uninterrupted connection of the peripheral wall portions of two adjacent tubular segments each provided with flanges having holes therein, of a tower, in particular for a wind energy turbine, wherein the method comprises the steps of
Method for generating a substantially uninterrupted connection of the peripheral wall portions of two adjacent tubular segments of a tower, in particular of a wind energy turbine, wherein the tubular segments are provided with flanges having holes therein and fastened screws are extending through the holes of the contacting flanges of the tubular segments, the method comprising the following steps
Dependencies are inferred from the claim text.