Pegging resources to shipments in a pre-existing production plan
OwnerRobert Wittrockinventor
Life of this patent
Estimating the term…
Abstract
In software systems for resource-constrained production planning (RCPP), it is often beneficial to determine a detailed association, or “pegging”, between the resources and the shipments that are enabled by those resources. The method implemented in the software systems is called “Pegging By Explosion” (PBE), for constructing a pegging of a production plan for an RCPP problem. The Pegging By Explosion technique takes a feasible production plan and reconstructs it, using its own specialized incremental allocation technique. A Pegging By Monitoring technique is applied to this reconstruction in order to produce the pegging. The reconstruction is accomplished by a specialized “explosion” technique related to the explosion technique of Material Requirements Planning (MRP).
Claims30
A computer implemented method for constructing a pegging of a production plan for a resource-constrained production planning (RCPP) problem, comprising the step of constructing the pegging after the production plan has already been generated.
A computer readable medium containing code implementing a method for constructing a pegging of a production plan for a resource-constrained production planning (RCPP) problem, said method comprising the step of constructing the pegging after the production plan has already been generated.
Dependencies are inferred from the claim text.