# US 2005/0240382 A1 · Plant operation support system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2005/0240382 A1
- Document ID: US20050240382A1
- Status: Published application
- Kind: A1
- Application number: 11/079,248
- Filed: 2005-03-15
- Published: 2005-10-27
- Earliest claimed: 2004-04-22
- Assignees: Yokogawa Electric Corporation
- Inventors: Makoto Nakaya; Gentaro Fukano; Tetsuya Ohtani; Kenji Watanabe
- Web page: https://patentgrep.com/patent/US20050240382A1

## CPC

- G05B 17/02: electric
- G05B 19/41885: {characterised by modeling, simulation of the manufacturing system}
- G05B 23/0254: {based on a quantitative model, e.g. mathematical relationships between inputs and outputs; functions: observer, Kalman filter, residual calculation, Neural Networks}
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)

## Abstract

A plant operation support system of the present invention is characterized by the following: The present invention relates to a plant operation support system which performs process simulations in parallel with operations of an actual plant and predicts operations of the actual plant on the basis of the results simulated. The plant operation support system modifies a simulation model on the basis of actual data as required, modifies the simulation model on the basis of actual data received from the actual plant, and uses the modified simulation model to perform simulations in parallel with operations of the actual plant. Accordingly, the plant operation support system can reflect plant status in the simulation model consecutively and predict operations of the actual plant in a highly accurate manner.

## Claims

### Claim 1

A plant operation support system using a plant simulator, comprising:
a parameter modification means for receiving actual data from an actual plant and modifying parameters of a simulation model on the basis of this actual data; and a process simulation means for using said simulation model with modified parameters and performing simulations in parallel with operations of said actual plant.

### Claim 2 (depends on 1)

The plant operation support system of claim 1, comprising a parameter determination means for using correlations between plant data and variables of said simulation model and selecting parameters to be modified, whereby said parameter modification means modifies parameters selected by said parameter determination means after receiving actual data from said actual plant.

### Claim 3 (depends on 1, 2)

The plant operation support system of claim 1 or claim 2, wherein said process simulation means displays process data, which is not detected in said actual plant, and characteristic data of devices or materials among calculated results of simulations on display means.

### Claim 4 (depends on 1, 2)

The plant operation support system of claim 1 or claim 2, which receives actual data from said actual plant at a predetermined time, modifies parameters of said simulation model, and allows said simulation model to perform process simulations at a speed higher than the operating speed of said actual plant on the basis of the initial data of said simulation model if said initial data is set, comprising:
a future prediction means for simulating future trends of said actual plant.

### Claim 5 (depends on 4)

The plant operation support system of claim 4, wherein said future prediction means displays the simulated results of future trends on said display means.

### Claim 6 (depends on 4)

The plant operation support system of claim 4, wherein said future prediction means feeds the simulated results of future trends back to the control of said actual plant.

### Claim 7 (depends on 1, 2)

The plant operation support system of claim 1 or claim 2, wherein consistency between data calculated by said process simulation means and actual data received from said actual plant is checked and wherein any abnormality detected is displayed on said display means.

### Claim 8 (depends on 1, 2)

The plant operation support system of claim 1 or claim 2, comprising:
a plant diagnosis means which performs plant diagnoses by making a comparison between parameter data modified in past simulations and parameter data modified in the current simulation.

### Claim 9 (depends on 3)

The plant operation support system of claim 3, wherein said display means displays at least one of the screens for displaying time-series status amounts from the past to the present and the screen for providing trend displays of time-series predicts amounts of corresponding data from the present to the future.

### Claim 10 (depends on 3)

The plant operation support system of claim 3, wherein said display means memorizes the start time of a future prediction and displays said start time in a trend graph screen.

### Claim 11 (depends on 3)

The plant operation support system of any claim 3, wherein said display means displays time zones and time steps for prior predictions in said displayed trend graph screen.

### Claim 12 (depends on 3)

The plant operation support system of claim 3, wherein said display means allows future time-series status amounts to be scrolled according to the size of said trend graph screen.

### Claim 13 (depends on 3)

The plant operation support system of claim 3, wherein said display means displays an expected alarm generation time when a displayed prediction status amount goes beyond a predetermined upper or lower limit.

### Claim 14 (depends on 3)

The plant operation support system of claim 3, wherein said display means clears a previous prediction status trend if a future prediction is requested again while a future prediction screen is being displayed.

### Claim 15 (depends on 3)

The plant operation support system of claim 3, wherein said display means displays time-series prediction status amounts for physical amounts of a location where a sensor cannot be deployed or physical amounts which cannot be measured by said sensor.

### Claim 16 (depends on 3)

The plant operation support system of any claim 3, wherein said display means is equipped with a zooming function for horizontal and vertical axes.
