Method of managing manufacturing process
AssigneeOki Electric Industry Co., Ltd.
InventorShunji Hayashi
Life of this patent
Estimating the term…
Loading patent…
AssigneeOki Electric Industry Co., Ltd.
InventorShunji Hayashi
Estimating the term…
A priority number of each combination of a manufacturing device and a step are first calculated by the equation=processing time×number of processible steps×number of usable devices. From the combination having the smallest priority number (i.e. highest priority), a lot will be allotted to the device for the step. The priority number is updated every after allotment of one lot by the equation=processing time×number of processible steps×number of usable devices×{(device load×10)k+1}. By repeating this procedure, all the lots scheduled to be processed are allotted to the corresponding devices. In addition, in the actual manufacturing process, whenever there is a lot that has to be processed, execution of processing such a lot is directed by successively selecting a device having the lowest accomplishment rate.
A method of managing a manufacturing process, in which a device is successively selected from a plurality of devices that can perform at least one process step, comprising:
Dependencies are inferred from the claim text.