# US 2005/0087009 A1 · Method for measuring formation properties with a time-limited formation test

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2005/0087009 A1
- Document ID: US20050087009A1
- Status: Published application
- Kind: A1
- Application number: 10/989,224
- Filed: 2004-11-15
- Published: 2005-04-28
- Earliest claimed: 2002-09-09
- Assignees: Schlumberger Technology Corporation
- Inventors: Jean-Marc Follini; Julian Pop
- Web page: https://patentgrep.com/patent/US20050087009A1

## CPC

- E21B 49/00: Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B 49/008: {by injection test; by analysing pressure variations in an injection or production test, e.g. for estimating the skin factor (measuring pressure E21B47/06)}
- E21B 49/10: using side-wall fluid samplers or testers
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

An apparatus and method for determining at least one downhole formation property is disclosed. The apparatus includes a probe and a pretest piston positionable in fluid communication with the formation, and a series of flowlines pressure gauges, and valves configured to selectively draw into the apparatus for measurement of one of formation fluid and mud. The method includes performing a first pretest to determine an estimated formation parameter; using the first pretest to design a second pretest and generate refined formation parameters whereby formation properties may be estimated.

## Claims

### Claim 1

A method for determining formation parameters using a downhole tool positioned in a wellbore adjacent a subterranean formation, comprising:
performing a first pretest of the formation to determine an initial estimate of the formation parameters;
designing pretest criteria for performing a second pretest based on the initial estimate of the formation parameters;
performing a second pretest of the formation according to the designed criteria whereby a refined estimate of the formation parameters are determined.

### Claim 2 (depends on 1)

The method of claim 1 further comprising the step of setting the tool.

### Claim 3 (depends on 1)

The method of claim 1 further comprising establishing fluid communication between the tool and the formation.

### Claim 4 (depends on 1)

The method of claim 1 wherein the steps of performing a first pretest comprise the steps of performing a first drawdown, terminating the first drawdown, performing the first buildup, and terminating the first buildup.

### Claim 5 (depends on 1)

The method of claim 1 wherein the steps of performing a second pretest comprising performing a second drawdown, terminating the second drawdown, performing a second buildup and terminating the second buildup.

### Claim 6 (depends on 1)

The method of claim 1 further comprising the step of performing a mud compressibility test to determine mud compressibility criteria for performing the first pretest, and wherein the step of performing a first pretest comprises performing a first pretest according to the mud compressibility criteria to determine an initial estimate of the formation parameters.

### Claim 7 (depends on 5)

The method of claim 5 wherein the mud compressibility test comprises the steps of drawing mud from the wellbore into the tool, isolating mud volume in the flowline, compressing the mud volume, terminating compression, expanding mud volume, terminating expansion of mud volume, opening communication of the flowline to the wellbore, and equalizing pressure in the flowline to the wellbore pressure.

### Claim 8 (depends on 5)

The method of claim 5 wherein the mud compressibility criteria is determined by calculating a slope of a line defining the first drawdown based on the following equations:
p
⁡
(
t
)
=
p
+
-
q
p
V
⁡
(
0
)
⁢
⁢
C
m
⁢
t
⁢
⁢
=
b
-
at
where V(0) is the flowline volume at the beginning of the expansion, Cm is the mud compressibility, qp is the piston decompression rate, p+ is the apparent pressure at the initiation of the expansion process; and mud compressibility Cm is determined from the following equation:
C
m
=
-
1
V
⁢
ⅆ
V
ⅆ
p
⁢
⁢
or
,
equivalently
,
⁢
q
p
=
-
C
m
⁢
V
⁢
p
.
where Cm is the mud compressibility, V is the total volume of trapped mud, p is the measured flowline pressure, p is the time rate of change of the measured flowline pressure, and qp represents the pretest piston rate.

### Claim 9 (depends on 8)

The method of claim 8 wherein the step of performing a mud compressibility test comprises the steps of drawing mud from the wellbore into the tool, isolating mud volume in the flowline, compressing the mud volume, terminating compression, expanding mud volume, terminating expansion of mud volume, opening communication of the flowline to the wellbore, and equalizing pressure in the flowline to the wellbore pressure, redrawing mud from the wellbore into the tool and re-isolating the flowline from the wellbore.

### Claim 10 (depends on 9)

The method of claim 9 further comprising the step of performing a mud filtration test to determine a refined mud compressibility, and wherein the step of performing a first pretest comprises performing a first pretest according to the refined mud compressibility criteria to determine an initial estimate of the formation parameters.

### Claim 11 (depends on 10)

The method of claim 10 wherein the step of performing a mud filtration test comprises the steps of compressing a volume of mud, terminating compression, allowing flowline pressure to fall, opening communication of the flowline with the wellbore, equilibrating pressure between the tool and the wellbore, and isolating the flowline from the wellbore.

### Claim 12 (depends on 11)

The method of claim 11 further comprising the steps of recompressing mud in the flowline, terminating recompression, and allowing flowline pressure to fall.

### Claim 13 (depends on 11)

The method of claim 11 further comprising the steps of decompressing mud in the flowline, terminating decompression, and allowing flowline pressure to fall.

### Claim 14 (depends on 9)

The method of claim 9 wherein the refined mud compressibility criteria is determined by calculating a slope of a line defining the first drawdown based on the following equations:
p
⁡
(
t
)
=
p
+
-
q
p
-
q
f
V
⁡
(
0
)
⁢
⁢
C
m
⁢
t
⁢
⁢
=
b
-
at
where V(0) is the flowline volume at the beginning of the expansion, Cm is the mud compressibility, qp is the piston decompression rate, and p+ is the apparent pressure at the initiation of the expansion process, wherein a rate of filtration qf is determined by the equation:
qf=CmVtp.
where Vt is the total volume of trapped mud, and p represents the rate of pressure decline.

### Claim 15

A method for determining at least one formation fluid property using a formation tester, comprising:
collecting a first set of data points representing pressures in a pretest chamber of the formation tester as a function of time during a first pretest;
determining a set of parameters for a second pretest, the set of parameters being determined based on estimated formation properties derived from the first set of data points and a time remaining for performing the second pretest;
performing the second pretest using the set of parameters;
collecting a second set of data points representing pressures in the pretest chamber as a function of time during the second pretest; and
determining the at least one formation fluid property from the second set of data points.

### Claim 16 (depends on 15)

The method of claim 15, wherein the estimated formation properties comprise an estimated formation pressure and an estimated formation fluid mobility.

### Claim 17 (depends on 15)

The method of claim 15, wherein the at least one formation fluid property comprises one selected from the group consisting of formation pressure and formation fluid mobility.

### Claim 18 (depends on 15)

The method of claim 15, wherein the set of parameters comprise at least one selected from the group consisting of a drawdown volume for the second pretest, a flow rate for a drawdown phase in the second pretest, a duration for the drawdown phase in the second pretest, a duration for a buildup phase in the second pretest, and a criterion for terminating the drawdown phase in the second pretest.

### Claim 19 (depends on 15)

The method of claim 15, further comprising determining a mud compressibility before the collecting the first set of data points.

### Claim 20 (depends on 19)

The method of claim 19, wherein the determining the mud compressibility comprises:
isolating a volume of a drilling fluid in a flow line that is in fluid communication with the pretest chamber of the formation tester;
collecting a set of data points representing pressures in the pretest chamber as a function of time while moving a piston in the pretest chamber; and
determining the mud compressibility from the set of data points.

### Claim 21 (depends on 19)

The method of claim 19, wherein the mud compressibility is used to determine a condition for terminating a drawdown phase in the first pretest.

### Claim 22 (depends on 21)

The method of claim 21, wherein the condition for terminating the drawdown phase is based on finding a straight line having a fixed slope, the straight line representing a flow line expansion in the drawdown phase.

### Claim 23 (depends on 22)

The method of claim 22, wherein the fixed slope is determined by the mud compressibility, a flow line volume, and the piston drawdown rate.

### Claim 24 (depends on 22)

The method of claim 22, wherein the finding the straight line is performed by finding a series of consecutive data points in the drawdown phase having substantially identical intercepts on a pressure versus time plot when each of the data points is fitted to a line with the fixed slope.

### Claim 25 (depends on 22)

The method of claim 22, wherein the finding the straight line is performed by finding a series of consecutive data points in the drawdown phase having substantially identical variances when each of the data points is fitted to the straight line with the fixed slope.

### Claim 26 (depends on 19)

The method of claim 19, further comprising determining a mud filtration rate after the determining the mud compressibility.

### Claim 27 (depends on 26)

The method of claim 26, wherein the finding the mud filtration rate comprises:
isolating a volume of the drilling fluid in a flow line that is in fluid communication with the pretest chamber and a formation;
compressing the volume of the drilling fluid with the piston;
collecting data points representing pressures in the pretest chamber as a function of time after the compressing is terminated; and
determining the mud filtration rate from the data points.

### Claim 28 (depends on 26)

The method of claim 26, wherein the mud filtration rate is used to determine a condition for terminating a drawdown phase in the first pretest.

### Claim 29

A formation tester, comprising:
a housing having a flow line and a pretest chamber, the flow line and the pretest chamber are in fluid communication;
a probe disposed on an exterior of the housing, the probe being in fluid communication with the flow line, and the probe being adapted to establish fluid communication with formation fluids;
a probe isolation valve disposed in the flow line between the probe and the pretest chamber, the probe isolation valve being adapted to prevent fluid communication between the probe and the pretest chamber;
a probe pressure gauge disposed in the flow line between the probe isolation valve and the probe, the probe pressure gauge being adapted to measure fluid pressures in the probe;
a pretest chamber gauge disposed in the flow line between the probe isolation valve and the pretest chamber, the pretest chamber gauge being adapted to measure fluid pressures in the pretest chamber;
a flow line isolation valve disposed in the flow line such that the pretest chamber is located between the pretest chamber gauge and the flow line isolation valve, the flow line isolation valve being adapted to prevent fluid communication between the pretest chamber and a remainder of the flow line lying beyond the flow line isolation valve;
an equalization flow line branching off the flow line at a location between the pretest chamber and the flow line isolation valve, the equalization flow line being adapted to provide fluid communication between the flow line and the well fluids in the borehole; and
an equalization valve disposed in the equalization flow line, the equalization valve being adapted to prevent the fluid communication between the flow line and the well fluids in the borehole.

### Claim 30

A method for determining a termination condition for a drawdown operation using a formation tester in a formation penetrated by a borehole, comprising:
setting a probe of the formation tester against a wall of the borehole so that a pretest chamber is in fluid communication with the formation, a drilling fluid in the pretest chamber having a higher pressure than the formation pressure;
decompressing the drilling fluid in the pretest chamber by withdrawing a pretest piston at a constant drawdown rate;
collecting data points representing fluid pressures in the pretest chamber as a function of time;
identifying a range of consecutive data points that fit a line of pressure versus time with a fixed slope, the fixed slope being based on a compressibility of the drilling fluid, the constant drawdown rate, and a volume of the pretest chamber; and
terminating the drawdown operation based on a termination criterion after the range of the consecutive data points is identified.

### Claim 31 (depends on 30)

The method of claim 30, wherein the identifying the range of the consecutive data points is performed by finding a stretch of data points, each of which produces a substantially identical pressure intercept when fitted to the line with the fixed slope.

### Claim 32 (depends on 31)

The method of claim 31, wherein the finding the stretch of data points comprising:
determining a median of pressure intercepts that resulted from fitting the data points to the line with the fixed slope; and
finding a subset of data points whose pressure intercepts differ from the median by a value smaller than a preset error margin.

### Claim 33 (depends on 30)

The method of claim 30, wherein the identifying the range of the consecutive data points is performed by finding a stretch of data points, each of which produces a variance no more than a predetermined number when fitted to the line with the fixed slope.

### Claim 34 (depends on 33)

The method of claim 33, wherein the finding the stretch of data points comprising:
determining a minimum variance from a set of variances that resulted from fitting the data points to the line with the fixed slope; and
finding a subset of data points whose variances are no more than a constant multiple of the minimum variance.

### Claim 35 (depends on 34)

The method of claim 34, wherein the constant multiple is 2 or 3.

### Claim 36 (depends on 30)

The method of claim 30, wherein the termination criterion is a maximum drawdown pressure drop, a maximum volume withdrawn, or a maximum drawdown duration.

### Claim 37

A method for determining an estimated formation pressure from a drawdown operation using a formation tester in a formation penetrated by a borehole, comprising:
setting the formation tester against a wall of the borehole so that a pretest chamber of the formation tester is in fluid communication with the formation, a drilling fluid in the pretest chamber having a higher pressure than the formation pressure;
decompressing the drilling fluid in the pretest chamber by withdrawing a pretest piston in the formation tester at a constant drawdown rate;
collecting data points representing fluid pressures in the pretest chamber as a function of time;
identifying a range of consecutive data points that fit a line of pressure versus time with a fixed slope, the fixed slope being based on a compressibility of the drilling fluid, the constant drawdown rate, and a volume of the pretest chamber; and
determining the estimated formation pressure from a first data point after the range of the consecutive data points.

### Claim 38

A method for estimating a formation fluid mobility, comprising:
performing a pretest using a formation tester disposed in a formation penetrated by a borehole, the pretest comprising a drawdown phase and a buildup phase;
collecting data points representing pressures in a pretest chamber of the formation tester as a function of time during the drawdown phase and the buildup phase;
determining an estimated formation pressure from the data points;
determining an area bounded by a line passing through the estimated formation pressure and curves interpolating the data points during the drawdown phase and the buildup phase; and
estimating the formation fluid mobility from the area, a volume extracted from the formation during the pretest, a radius of the formation testing probe, and a shape factor that accounts for the effect of the borehole on a response of the formation testing probe.

### Claim 39 (depends on 38)

The method of claim 38, wherein the determining the estimated formation pressure is performed by finding a first data point which deviates from a linear trend representing a flowline decompression during the drawdown phase.

### Claim 40 (depends on 39)

The method of claim 39, wherein the linear trend is identified by fitting the data points to a line with a fixed slope.

### Claim 41 (depends on 38)

The method of claim 38, wherein the determining the estimated formation pressure is performed by finding a pressure that approximates a maximum buildup pressure.

### Claim 42 (depends on 38)

The method of claim 38, wherein the estimating the formation fluid mobility is performed according to:
(
K
μ
)
l
=
V
1
4
⁢
r
p
⁢
Ω
S
A
+
ɛ
K
where K is the formation permeability and μ is the formation fluid viscosity; V1 is the volume extracted from the formation during the investigation pretest, V1=V(t7+T1)−V(t7−T0)=V(t7)−V(t7−T0) where V is the volume of the pretest chamber; rp is the probe radius; εK is an error term, and A is the area defined by a region enclosed by the drawdown curve, a horizontal line at the pressure of termination and the buildup curve graphically depicted on a pressure versus time plot:

### Claim 43

A method for determining at least one formation fluid property using a formation tester in a formation penetrated by a borehole, comprising:
collecting a first set of data points representing pressures in a pretest chamber of the formation tester as a function of time during a first pretest;
determining an estimated formation pressure and an estimated formation fluid mobility from the first set of data points;
determining a set of parameters for a second pretest, the set of parameters being determined based on the estimated formation pressure, the estimated formation fluid mobility, and a time remaining for performing the second pretest;
performing the second pretest using the set of parameters;
collecting a second set of data points representing pressures in the pretest chamber as a function of time during the second pretest; and
determining the at least one formation fluid property from the second set of data points.

### Claim 44 (depends on 43)

The method of claim 43, wherein the at least one formation property comprises at least one selected from the group consisting of a formation pressure and a formation fluid mobility.

### Claim 45 (depends on 44)

The method of claim 44, wherein the set of parameters for the second pretest comprise at least one selected from the group consisting of a pretest piston drawdown rate, a drawdown volume, a maximum drawdown pressure drop, and a duration for a buildup phase.

### Claim 46 (depends on 45)

The method of claim 45, wherein a drawdown phase in the first pretest is terminated based on a criterion relative to a first data point past a stretch of data points representing a linear flowline expansion pressure trend, wherein the linear flowline expansion pressure trend is found by fitting data points to a line with a fixed slope, the first data point past the stretch deviates from the line with the fixed slope by a deviation greater than a predetermined value.

### Claim 47 (depends on 46)

The method of claim 46, wherein the criterion is one selected from a group consisting of a pressure drop, a withdrawn volume, and a duration.

### Claim 48 (depends on 47)

The method of claim 47, wherein a buildup phase of the first pretest is terminated based on a ratio of a duration of the drawdown phase and a duration of the buildup phase.

### Claim 49 (depends on 48)

The method of claim 48, wherein the first estimated formation pressure is determined from a last data point from the buildup phase of the first pretest.

### Claim 50

A method for determining formation parameters using a downhole tool positioned in a wellbore adjacent a subterranean formation, comprising:
