Method of controlling print job schedule and printing system using the method
AssigneeSamsung Electronics Co., Ltd.
InventorHo-sung Han
Life of this patent
Estimating the term…
Loading patent…
AssigneeSamsung Electronics Co., Ltd.
InventorHo-sung Han
Estimating the term…
A printing system including a first memory unit storing a printer operating system and at least two interpreters; a second memory unit having an operating area for the printer operating system, an operating area and a heap area for each interpreter of the first memory unit, and at least two reception buffers temporarily storing incoming print job data; a printing control unit controlling operation of the printing system based on the printer operating system, controlling the interpreters of the first memory unit to interpret the print job data, and transmitting the interpreted print job data to a printer engine; and a print job scheduling unit providing a first scheduling procedure regarding initiation of the interpreters for multiple print jobs and a second scheduling procedure regarding interpretation of the multiple print jobs that have been initiated, the printer control unit using the first scheduling procedure and the second scheduling procedure to control the operation of the interpreters.
A printing system comprising:
A method of controlling a print job schedule, the method comprising:
A method of controlling a print job schedule, the method comprising:
A computer-readable storage having embodied thereon a computer program for controlling a print job schedule in a printing system having a first memory unit storing a printer operating system and a least two interpreters, and a second memory unit having an operating area for the printer operating system, an operating area and a heap area for each interpreter of the first memory unit, and at least two reception buffers for temporarily storing incoming print job data, the computer program in the computer-readable storage comprising a process of:
A method of controlling a print job schedule for multiple print jobs that are requested in sequential order, the method comprising:
Dependencies are inferred from the claim text.