Method for operating a steam power installation and corresponding steam power installation
AssigneeSiemens Aktiengesellschaft
InventorsTilman Abel, Dieter Blanck, Georg Haberberger, Imke Riebeck
Life of this patent
Estimating the term…
Loading patent…
AssigneeSiemens Aktiengesellschaft
InventorsTilman Abel, Dieter Blanck, Georg Haberberger, Imke Riebeck
Estimating the term…
The invention relates to a method for operating a steam power installation, whereby steam produced in a boiler is condensed in a condenser after passing through at least one turbine, and the condensate obtained is preheated and redirected back to the boiler as boiler feed-water. In order to preheat the condensate, said condensate is split into a first partial current and a second partial current. Only the first partial current is preheated and the second partial current is then mixed with the preheated first partial current. The power of the turbine can thus be increased as required, up to the boiler reserve of the steam power installation.
A method for operating a steam power installation (1), whereby steam (D) generated in a boiler (3) is condensed in a condenser (7) after flowing through at least one turbine (5), and the condensate (K) obtained is preheated and fed back to the boiler (3) as feed-water (S),
The method as claimed in one of the preceding claims,
The method as claimed in one of the preceding claims,
The method as claimed in one of the preceding claims,
A steam power installation (1) for implementing the method as claimed in one of the preceding claims, comprising a boiler (3) for generating steam (D), at least one turbine (5), a condenser (7) connected on the steam outlet side of the turbine (5), a condensate line (13) for feeding the condensate (K) back to the boiler (3), and a preheating device (15) connected in the condensate line (13) for preheating condensate (K),
Dependencies are inferred from the claim text.