# US 2004/0083082 A1 · Iterative detection in MIMO systems

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2004/0083082 A1
- Document ID: US20040083082A1
- Status: Published application
- Kind: A1
- Application number: 10/618,970
- Filed: 2003-07-14
- Published: 2004-04-29
- Earliest claimed: 2002-07-12
- Assignees: Texas Instruments Incorporated
- Inventors: Eko N. Onggosanusi; Anand G. Dabak
- Web page: https://patentgrep.com/patent/US20040083082A1

## CPC

- H04L 1/0631: {Receiver arrangements}
- H04L 1/005: {Iterative decoding, including iteration between signal detection and decoding operation}
- H04L 25/0204: {of multiple channels}
- H04L 2025/03426: {transmission using multiple-input and multiple-output channels}
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)

## Abstract

Detection for a MIMO wireless system with symbols iteratively detected in subsets with maximum likelihood hard decisions within subsets.

## Claims

### Claim 1

A method of detection, comprising:
(a) receiving a signal representing a set of P symbols where P is a positive integer greater than 2;
(b) jointly estimating a subset of P1 symbols of said set of P symbols where P1 is a positive integer;
(c) after step (b), jointly estimating a subset of P2 symbols of said set of P symbols where P2 is a positive integer and wherein said subset of P1 symbols and said subset of P2 symbols are members of a partition of said set of P symbols and P1+P2 is greater than 2.

### Claim 2 (depends on 1)

The method of claim 1, wherein:
P1=P2=P/2 (a).

### Claim 3 (depends on 1)

The method of claim 1, further comprising:
(a) after step (c) of claim 1, for each m in the set {3, . . . , M}, jointly estimating a subset of Pm symbols of said set of P symbols where Pm is a positive integer and wherein said subset of Pm symbols is a member of a partition of said set of P symbols and P1+P2+. . . +PM=P where M is a positive integer.

### Claim 4 (depends on 3)

The method of claim 3, wherein:
P1=P2=. . . =PM=P/M (a).

### Claim 5 (depends on 1)

The method of claim 1, wherein:
(a) said jointly estimating of step (b) of claim 1 includes a decision using P1-vector of soft estimates F1r where r is a Q-vector of said received signals of step (a) of claim 1 and F1 is a P1×Q matrix for zero-forcing estimation;
(b) said jointly estimating of step (c) of claim 1 includes a decision using P2-vector of soft estimates F2(r−G1s(1)) where F2 is a P2×Q matrix for zero-forcing estimation, G1 is a Q×P1 matrix for zero-forcing feedback cancellation, and s(1) is the P1-vector estimation result of step (b) of claim 1.

### Claim 6 (depends on 1)

The method of claim 1, wherein:
(a) said jointly estimating of step (b) of claim 1 includes a decision using P1-vector of soft estimates F1r where r is a Q-vector of said received signals of step (a) of claim 1 and F1 is a P1×Q matrix for minimum mean square error estimation
(b) said jointly estimating of step (c) of claim 1 includes a decision using P2-vector of soft estimates F2(r−G1s(1)) where F2 is a P2×Q matrix for minimum mean square error estimation, G1 is a Q×P1 matrix for zero-forcing feedback cancellation, and s(1) is the P1-vector estimation result of step (b) of claim 1.

### Claim 7 (depends on 1)

The method of claim 1, wherein:
(a) said jointly estimating of step (b) of claim 1 includes a decision using P1-vector of soft estimates F1r where r is a Q-vector of said received signals of step (a) of claim 1 and F1 is a P1×Q matrix for minimum mean square error estimation
(b) said jointly estimating of step (c) of claim 1 includes a decision using P2-vector of soft estimates F2 (r−G1 s(1)) where F2 is a P2×Q matrix for minimum mean square error estimation including feedback error compensation, G1 is a Q×P1 matrix for zero-forcing feedback cancellation including feedback error compensation, and s(1) is the P1-vector estimation result of step (b) of claim 1.

### Claim 8 (depends on 1)

The method of claim 1, wherein:
(a) said subset of P1 symbols of step (b) of claim 1 is determined according to signal-to-interference-plus-noise ratios of said P symbols prior to a decision in said estimating.

### Claim 9 (depends on 1)

The method of claim 1, wherein:
(a) said subset of P1 symbols of step (b) of claim 1 is determined according to projected signal-to-interference-plus-noise ratios of said P symbols after a decision in said estimating.

### Claim 10 (depends on 1)

The method of claim 1, wherein:
(a) said jointly estimating of step (b) of claim 1 includes a maximum likelihood decision; and
(b) said jointly estimating of step (c) of claim 1 includes a maximum likelihood decision.

### Claim 11 (depends on 1)

The method of claim 1, wherein:
(a) said jointly estimating of step (b) of claim 1 includes a soft decision; and
(b) said jointly estimating of step (c) of claim 1 includes a soft decision.

### Claim 12 (depends on 1)

The method of claim 1, further comprising:
(a) jointly re-estimating said subset of P1 symbols using error compensation determined by said jointly estimating said subset of P2 symbols of step (c) of claim 1.
