# US 2004/0083058 A1 · Method for selection of cementing composition

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2004/0083058 A1
- Document ID: US20040083058A1
- Status: Published application
- Kind: A1
- Application number: 10/739,430
- Filed: 2003-12-18
- Published: 2004-04-29
- Earliest claimed: 2002-02-22
- Assignees: Halliburton Energy Services, Inc.
- Inventors: Krishna M. Ravi; Olivier Gastebled; Martin Gerard Rene Bosma
- Web page: https://patentgrep.com/patent/US20040083058A1

## CPC

- E21B 33/14: for cementing casings into boreholes
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

A method is provided for selecting a cementing composition for sealing a subterranean zone penetrated by a well bore. The method involves comprising determining a group of effective cementing compositions from a group of cementing compositions given estimated conditions experienced during the life of the well, and estimating the risk parameters for each of the group of effective cementing compositions.

## Claims

### Claim 1

A method for selecting a cementing composition intended for use in a subterranean zone penetrated by a well bore comprising:
determining a total maximum stress difference for a cementing composition using data from the cementing composition;
determining well input data; and
comparing the well input data to the total maximum stress difference to determine whether the cementing composition is effective for the intended use.

### Claim 2 (depends on 1)

The method of claim 1 wherein the data from the cementing composition comprises at least one of tensile strength, unconfined and confined tri-axial data, hydrostatic data, oedometer data, compressive strength, porosity, permeability, Young's modulus, Poisson's Ratio, and Mohr-Coulomb plastic parameters.

### Claim 3 (depends on 1)

The method of claim 1 wherein the total maximum stress difference is determined according to the formula
2 Δσ sh = k ⁢ ∫ ϵ sh set ϵ sh tot ⁢ E ( ϵ sh ) · ⁢ ⅆ ϵ sh
where:
Δσsh is the total maximum stress difference;
k is a factor depending on the Poisson ratio of the cementing composition and the boundary conditions between rock in the subterranean zone penetrated by the wellbore and the cementing composition;
E(εsh) is the Young's modulus of the cementing composition; and
εsh represents shrinkage of the cementing composition at a time during setting.

### Claim 4 (depends on 1)

The method of claim 1 wherein said determining of the well input data comprises determining at least one of vertical depth of the well, overburden gradient, pore pressure, maximum and minimum horizontal stresses, hole size, casing outer diameter, casing inner diameter, density of drilling fluid, density of cement slurry, density of completion fluid, and top of cement.

### Claim 5 (depends on 1)

The method of claim 1 wherein said determining of the well input data comprises evaluating a stress state of rock in the subterranean zone penetrated by the well bore.

### Claim 6 (depends on 5)

The method of claim 5 wherein said evaluating the stress state of the rock comprises analyzing properties of the rock selected from the group consisting of Young's modulus, Poisson's ratio and yield parameters.

### Claim 7 (depends on 1)

The method of claim 1 further comprising determining risk of failure for the cementing composition determined to be effective for the intended use.

### Claim 8 (depends on 1)

The method of claim 1 further comprising
determining at least one well event stress state associated with at least one anticipated well event; and
comparing the well input data to the at least one well event stress state to determine whether the cementing composition is effective for the intended use.

### Claim 9 (depends on 8)

The method of claim 8 wherein the anticipated well event comprises at least one well event selected from the group consisting of cement hydration, pressure testing, well completions, hydraulic fracturing, hydrocarbon production, fluid injection, formation movement, perforation, and subsequent drilling.

### Claim 10 (depends on 8)

The method of claim 8 wherein said determining of the well event stress state comprises determining stress associated with at least one anticipated well event selected from the group consisting of shrinkage, pressure, temperature, load, and dynamic load.

### Claim 11 (depends on 1)

The method of claim 1 wherein the cementing composition is selected from the group consisting of cement with a Young's modulus of about 1.2e+6 psi (8.27 GPa), shrinkage compensated cement with a Young's modulus of about 1.2e+6 psi (8.27 GPa), and shrinkage compensated cement with a Young's modulus of about 1.35e+5 psi (0.93 GPa).

### Claim 12

A method for selecting a cementing composition intended for use in a subterranean zone penetrated by a well bore comprising:
defining initial conditions in the well bore by evaluating a stress state of rock in the subterranean zone penetrated by the well bore and evaluating a stress state associated with a cement composition introduced into the well bore; and
determining whether the cementing composition is effective for the intended use by determining whether the cement composition will de-bond from the rock.

### Claim 13 (depends on 12)

The method of claim 12 wherein the evaluating of the stress state associated with the cement composition introduced into the well bore comprises using data associated with the cementing composition that comprises at least one of tensile strength, unconfined and confined tri-axial data, hydrostatic data, oedometer data, compressive strength, porosity, permeability, Young's modulus, Poisson's Ratio, and Mohr-Coulomb plastic parameters.

### Claim 14 (depends on 12)

The method of claim 12 wherein said evaluating the stress state of the rock in the subterranean zone comprises analyzing properties of the rock selected from the group consisting of Young's modulus, Poisson's ratio and yield parameters.

### Claim 15 (depends on 12)

The method of claim 12 further comprising:
determining at least one well event stress state associated with at least one anticipated well event; and
determining whether the cementing composition will de-bond from the rock.

### Claim 16 (depends on 15)

The method of claim 15 wherein the anticipated well event comprises at least one well event selected from the group consisting of cement hydration, pressure testing, well completions, hydraulic fracturing, hydrocarbon production, fluid injection, formation movement, perforation, and subsequent drilling.

### Claim 17 (depends on 15)

The method of claim 15 wherein said determining of the well event stress state comprises determining stress associated with at least one anticipated well event selected from the group consisting of shrinkage, pressure, temperature, load, and dynamic load.

### Claim 18

A method of performing a cost-benefit analysis on a cementing composition intended for use in a subterranean zone penetrated by a well bore comprising:
determining a total maximum stress difference for a cementing composition using data from the cementing composition;
determining well input data;
comparing the well input data to the total maximum stress difference to determine whether the cementing composition is effective for the intended use;
determining at least one well event stress state associated with at least one anticipated well event;
comparing the well input data to the at least one well event stress state to determine whether the cementing composition is effective for the intended use;
determining the risk of failure for the cementing composition determined to be effective for the intended use; and
determining whether the risk of failure is acceptable given monetary costs associated with the cementing composition.

### Claim 19 (depends on 18)

The method of claim 18 wherein the data from the cementing composition comprises at least one of tensile strength, unconfined and confined tri-axial data, hydrostatic data, oedometer data, compressive strength, porosity, permeability, Young's modulus, Poisson's Ratio, and Mohr-Coulomb plastic parameters.

### Claim 20 (depends on 18)

The method of claim 18 wherein the total maximum stress difference is determined according to the formula
3 Δσ sh = k ⁢ ∫ ϵ sh set ϵ sh tot ⁢ E ( ϵ sh ) · ⁢ ⅆ ϵ sh
where:
Δσsh is the total maximum stress difference;
k is a factor depending on the Poisson ratio of the cementing composition and the boundary conditions between rock in the subterranean zone penetrated by the well bore and the cementing composition;
E(εsh) is the Young's modulus of the cementing composition; and
εsh represents shrinkage of the cementing composition at a time during setting.

### Claim 21 (depends on 18)

The method of claim 18 wherein said determining of the well input data comprises determining at least one of vertical depth of the well, overburden gradient, pore pressure, maximum and minimum horizontal stresses, hole size, casing outer diameter, casing inner diameter, density of drilling fluid, density of cement slurry, density of completion fluid, and top of cement.

### Claim 22 (depends on 18)

The method of claim 18 wherein said determining of the well input data comprises evaluating a stress state of rock in the subterranean zone penetrated by the well bore.

### Claim 23 (depends on 22)

The method of claim 22 wherein said evaluating the stress state of the rock comprises analyzing properties of the rock selected from the group consisting of Young's modulus, Poisson's ratio and yield parameters.

### Claim 24 (depends on 18)

The method of claim 18 wherein the anticipated well event comprises at least one well event selected from the group consisting of cement hydration, pressure testing, well completions, hydraulic fracturing, hydrocarbon production, fluid injection, formation movement, perforation, and subsequent drilling.

### Claim 25 (depends on 18)

The method of claim 18 wherein said determining of the well event stress state comprises determining stress associated with at least one anticipated well event selected from the group consisting of shrinkage, pressure, temperature, load, and dynamic load.

### Claim 26

A method for selecting a cementing composition intended for use in a subterranean zone penetrated by a well bore comprising:
determining a total maximum stress difference for a cementing composition using data from the cementing composition;
determining well input data;
comparing the well input data to the total maximum stress difference to determine at least in part whether the cementing composition is effective for the intended use;
determining at least one well event stress state associated with at least one anticipated well event; and
comparing the well input data to the at least one well event stress state to determine whether the cementing composition is effective for the intended use.

### Claim 27 (depends on 26)

The method of claim 26 wherein the data from the cementing composition comprises at least one of tensile strength, unconfined and confined tri-axial data, hydrostatic data, oedometer data, compressive strength, porosity, permeability, Young's modulus, Poisson's Ratio, and Mohr-Coulomb plastic parameters.

### Claim 28 (depends on 26)

The method of claim 26 wherein the total maximum stress difference is determined according to the formula
4 Δσ sh = k ⁢ ∫ ϵ sh set ϵ sh tot ⁢ E ( ϵ sh ) · ⁢ ⅆ ϵ sh
where:
Δσsh is the total maximum stress difference;
k is a factor depending on the Poisson ratio of the cementing composition and the boundary conditions between rock in the subterranean zone penetrated by the wellbore and the cementing composition;
E(εsh) is the Young's modulus of the cementing composition; and
εsh represents shrinkage of the cementing composition at a time during setting.

### Claim 29 (depends on 26)

The method of claim 26 wherein said determining of the well input data comprises determining at least one of vertical depth of the well, overburden gradient, pore pressure, maximum and minimum horizontal stresses, hole size, casing outer diameter, casing inner diameter, density of drilling fluid, density of cement slurry, density of completion fluid, and top of cement.

### Claim 30 (depends on 26)

The method of claim 26 wherein said determining of the well input data comprises evaluating a stress state of rock in the subterranean zone penetrated by the well bore.

### Claim 31 (depends on 30)

The method of claim 30 wherein said evaluating the stress state of the rock comprises analyzing properties of the rock selected from the group consisting of Young's modulus, Poisson's ratio and yield parameters.

### Claim 32 (depends on 26)

The method of claim 26 further comprising determining risk of failure for the cementing composition determined to be effective for the intended use.

### Claim 33 (depends on 26)

The method of claim 26 wherein the anticipated well event comprises at least one well event selected from the group consisting of cement hydration, pressure testing, well completions, hydraulic fracturing, hydrocarbon production, fluid injection, formation movement, perforation, and subsequent drilling.

### Claim 34 (depends on 26)

The method of claim 26 wherein said determining of the well event stress state comprises determining stress associated with at least one anticipated well event selected from the group consisting of shrinkage, pressure, temperature, load, and dynamic load.
