# US 2004/0081516 A1 · Bundle of pipes and method for parallel arrangement of pipes according to a bore and swivel method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2004/0081516 A1
- Document ID: US20040081516A1
- Status: Published application
- Kind: A1
- Application number: 10/470,496
- Filed: 2003-07-29
- Published: 2004-04-29
- Earliest claimed: 2001-01-30
- Assignees: Stadtwerke Schwerte GmbH
- Inventors: Martin John; Klaus Rous
- Web page: https://patentgrep.com/patent/US20040081516A1

## CPC

- E21B 7/28: Enlarging drilled holes, e.g. by counterboring
- E21B 7/20: Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes
- F16L 7/00: Supporting pipes or cables inside other pipes or sleeves, e.g. for enabling pipes or cables to be inserted or withdrawn from under roads or railways without interruption of traffic (sleeves for supporting pipes, cables or protective tubing, between relatively movable points F16L3/01)
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- F16L: PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL

## Abstract

The inventions concerns to a bundle (1) of tubes for the laying of tubes (2) by means of a trenchless laying according to the fluid-assisted drilling method, in which in a first drilling process a drilling channel (9) is generated and during the retracting movement of the boring-flushing head (5) this drilling channel (9) is expanded and in this process the bundle (1) of tubes is retracted into the drilling channel (9). Such a bundle (1) of tubes stands out by that the bundle (1) of tubes is formed by a number of single tubes (2) which are ordered in distance to each other by means of flanges (3) distantly arranged at the tubes (2) in lengthwise direction (15) of the tubes (2). Further a procedure is described for the laying of tubes (2) by means of a trenchless laying according to the fluid-assisted drilling method, in which in during the retraction of the rotating boring-flushing head (5) and expanding of the drilling channel (9) the rotary movement of the boring-flushing head (5) is not transmitted to the bundle (1) of tubes by means of a device (6) for rotary decoupling and the bundle (1) of tubes is pulled through the drilling channel (9) supported in constant spatial position of the tubes (2) to each other and to the surroundings by means of stabilizing devices (3, 4, 17) inside the drilling channel (9).

## Claims

### Claim 1

A bundle (1) of tubes for the laying of tubes (2) by means of a trenchless laying according to the fluid-assisted drilling method, in which in a first drilling process a drilling channel (9) is generated and during the retracting movement of the boring-flushing head (5) this drilling channel (9) is expanded and in this process the bundle (1) of tubes is retracted into the drilling channel (9),
characterized in that
the bundle (1) of tubes is formed by a number of single tubes (2) which are ordered in distance to each other by means of flanges (3) distantly arranged at the tubes (2) in lengthwise direction (15) of the tubes (2).

### Claim 2 (depends on 1)

A bundle (1) of tubes according to claim 1, characterized in that at the rotating boring-flushing head (5) a non co-rotating expanding cone (4) is arranged in such a manner, that the expanding cone (4) expands during the pulling back the drilling channel (9) generated by the boring-flushing head (5) to the needed crosscut dimensions for the laying of the bundle (1) of tubes.

### Claim 3 (depends on 1, 2)

A bundle (1) of tubes according to one of the claims 1 or 2, characterized in that the expanding cone (4) presses flat against the walls (16) of the drilling channel (9) covered with mud and generated by the boring-flushing head (5) and is supported by these walls (16) and stabilizes the spatial position of the expanding cone (4) relative to the surroundings.

### Claim 4

A bundle (1) of tubes according to one of the preceding claims, characterized in that the expanding cone (4) shows a number of, preferably symmetric, essentially axial recesses (17), distributed at the periphery, which stabilizes the spatial position of the expanding cone (4) relative to the surroundings by means of the drilling mud, which penetrates here in lengthwise direction (15) of the drilling channel (9).

### Claim 5

A bundle (1) of tubes according to one of the preceding claims, characterized in that between the boring-flushing head (5) and the expanding cone (4) at least one device (6) for rotary decoupling is arranged, which decouples the rotary movement (19) of the boring-flushing head (5) from the bundle (1) of tubes connected to the expanding cone (4).

### Claim 6

A bundle (1) of tubes according to one of the preceding claims, characterized in that the flanges (3) show dimensions, which are smaller or correspond at least in sections essentially to the cross-section of the largest diameter of the expanding cone (4).

### Claim 7

A bundle (1) of tubes according to one of the preceding claims, characterized in that the flanges (3) are formed essentially plate-shaped and are secured to the tubes (2) perpendicular to the lengthwise direction (15) of the tubes (2).

### Claim 8

A bundle (1) of tubes according to one of the preceding claims, characterized in that the flanges (3) show essentially at least two plate-shaped component parts (20, 21, 22), in which in the respective component parts (20, 21, 22) supplementary, essentially semicircular openings (23) are provided, in which the tubes (2) can be inserted and which are closable by the respectively accompanying other component part (20, 21, 22) sticking the tubes (2).

### Claim 9 (depends on 8)

A bundle (1) of tubes according to claim 8, characterized in that the at least two plate-shaped component parts (20, 21, 22) of the flanges (3) can be screwed together (10) or stucked together or glued together.

### Claim 10

A bundle (1) of tubes according to one of the preceding claims, characterized in that the flanges (3) are arranged in essentially regular distances at the tubes (2) on behalf of forming the bundle (1) of tubes.

### Claim 11

A bundle (1) of tubes according to one of the preceding claims, characterized in that the flanges (3) near to the expanding cone (4) are arranged in a smaller distance to each other, here preferably essentially between 0.5-2 metres, as in the pull-in direction (15) further behind the expanding cone (4), here preferably essentially between 3-6 metres.

### Claim 12

A bundle (1) of tubes according to one of the preceding claims, characterized in that the flanges (3) stay fixed to the bundle (1) of tubes after pulling-in into the drilling channel (9).

### Claim 13 (depends on 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11)

A bundle (1) of tubes according to one of the claims 1 to 11, characterized in that the flanges (3) can be fixed to the bundle (1) of tubes in such a manner, that after pulling-in them into the drilling channel (9) the flanges (3) come to lie in stress-relieving pits driven down from the surface and can be accessibly dismantled from the bundle (1) of tubes again.

### Claim 14

A bundle (1) of tubes according to one of the preceding claims, characterized in that in the flanges (3) openings (14) in the region of the flanges (3) surrounded by the tubes (2) are provided in such a manner, that mud generated by the boring-flushing head (5) can enter the space (24) between two adjacent flanges (3) and essentially body it out.

### Claim 15 (depends on 14)

A bundle (1) of tubes according to claim 14, characterized in that the mud bodying out the space (24) formed between two adjacent flanges (3) causes a pressure build-up in this space (24), which stabilizes the bundle (1) of tubes on behalf of its spatial position relative to the surroundings.

### Claim 16

A bundle (1) of tubes according to one of the preceding claims, characterized in that the outer edges of the flanges (3) are supported by the walls (16) of the drilling channel (9) formed by the expanding cone (4) in such a manner, that the flanges (3) and the hereto fixed tubes (2) during the pulling-in of the bundle (1) of tubes are guided during gliding by the inner wall (16) of the drilling channel (9).

### Claim 17

A bundle (1) of tubes according to one of the preceding claims, characterized in that the mud operates as antiseize agent during the movement of the flanges (3) on the walls (16) of the drilling channel (9).

### Claim 18

A bundle (1) of tubes according to one of the preceding claims, characterized in that the outer profile of the flanges (3) is formed irregular.

### Claim 19 (depends on 18)

A bundle (1) of tubes according to claim 18, characterized in that the irregular outer profile of the flanges (3) causes a hardening of the mud adjacent to these irregular forms, by which the flanges (3) glide guided against torsion by this hardened mud along the inner wall (16) of the drilling channel (9).

### Claim 20 (depends on 1)

Procedure for the parallel laying of tubes (2) by means of a trenchless laying according to the fluid-assisted drilling method, in which in a first drilling process one drilling channel (9) is generated and during the retracting movement of the boring-flushing head (5) this drilling channel (9) is expanded and in this process a bundle (1) of tubes is retracted into the drilling channel (9), especially procedure for the laying of a bundle (1) of tubes according to claim 1,
characterized in that
during the retraction of the rotating boring-flushing head (5) and expanding of the drilling channel (9) the rotary movement of the boring-flushing head (5) is not transmitted to the bundle (1) of tubes by means of a device (6) for rotary decoupling and the bundle (1) of tubes is pulled through the drilling channel (9) supported in constant spatial position of the tubes (2) to each other and to the surroundings by means of stabilizing devices (3, 4, 17) inside the drilling channel (9).

### Claim 21 (depends on 1, 2, 20)

Procedure according to claim 20, characterized in that as stabilizing devices (3, 4, 17) are used an expanding cone (4), especially an expanding cone (4) according to claim 2, and flanges (3) for the connection of the tubes (2) to a bundle (1) of tubes, especially flanges (3) according to claim 1.

### Claim 22 (depends on 20, 21)

Procedure according to one of the claims 20 or 21, characterized in that the bundle (1) of tubes is pulled into the drilling channel (9) in such a spatial position relative to the surroundings, which corresponds to the spatial position of the bundle (1) of tubes in the pulled-in state.

### Claim 23 (depends on 20, 21, 22)

Procedure according to one of the claims 20 to 22, characterized in that tubes (2) consisting of materials capable of bearing tensile forces are pulled in, preferably tubes (2) made of metallic materials and/or tubes made of synthetic materials like PEHD or PEX.

### Claim 24 (depends on 20, 21, 22, 23)

Procedure according to one of the claims 20 to 23, characterized in that tubes (2) with different diameters and/or different usage are pulled in in one common pass.

### Claim 25 (depends on 20, 21, 22, 23, 24)

Procedure according to one of the claims 20 to 24, characterized in that the bundle (1) of tubes is pulled off a feed roll and the flanges (3) are pre-assembled before the pulling in.

### Claim 26 (depends on 20, 21, 22, 23, 24)

Procedure according to one of the claims 20 to 24, characterized in that the bundle (1) of tubes is manufactured of single bar-shaped tube sections and than the flanges (3) are pre-assembled before the pulling in.
