# US 2004/0073369 A1 · Supplemental referencing techniques in borehole surveying

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2004/0073369 A1
- Document ID: US20040073369A1
- Status: Published application
- Kind: A1
- Application number: 10/368,742
- Filed: 2003-02-18
- Published: 2004-04-15
- Earliest claimed: 2002-10-09
- Assignees: PathFinder Energy Services, Inc.
- Inventors: Graham McElhinney
- Web page: https://patentgrep.com/patent/US20040073369A1

## CPC

- E21B 47/022: of the borehole, e.g. using geomagnetism
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

A method for surveying a borehole is disclosed which uses first and second gravity measurement devices disposed at corresponding first and second positions in the borehole and a supplemental reference measurement device disposed at the first position. Exemplary supplemental reference measurement devices include magnetometers and gyroscopes. The method includes determining a reference borehole azimuth at the first position using the supplemental reference measurement device, determining a change in borehole azimuth between the first and second positions using the first and second gravity measurement devices and determining the borehole azimuth at the second position by applying the change in borehole azimuth the reference azimuth. A system adapted to execute the disclosed method and a computer system including computer-readable logic configured to instruct a processor to execute the disclosed method are also provided.

## Claims

### Claim 1

A method for surveying a borehole, the method comprising:
(a) providing a downhole tool including first and second gravity measurement devices disposed at corresponding first and second positions in the borehole, the first and second gravity measurement devices being constrained from rotating with respect to one another about a substantially cylindrical borehole axis, the tool further including a supplemental reference measurement device disposed at the first position;
(b) determining a reference borehole azimuth at the first position using the supplemental reference measurement device;
(c) determining a change in borehole azimuth between the first and second positions using the first and second gravity measurement devices; and
(d) determining borehole azimuth at the second position by applying the change in borehole azimuth determined in (c) to the reference borehole azimuth determined in (b).

### Claim 2 (depends on 1)

The method of claim 1, wherein the first and second gravity measurement devices comprise accelerometers.

### Claim 3 (depends on 1)

The method of claim 1, wherein the supplemental reference measurement device is selected from the group consisting of: (A) a gyroscope, and (B) a magnetometer.

### Claim 4 (depends on 1)

The method of claim 1, wherein the tool further comprises first and second supplemental reference measurement devices disposed at the first and second positions, respectively.

### Claim 5 (depends on 4)

The method of claim 4, wherein the first supplemental reference measurement device comprises a magnetometer and the second supplemental reference measurement device comprises a gyroscope.

### Claim 6 (depends on 4)

The method of claim 4, wherein each of the first and second supplemental reference measurement devices comprises a magnetometer.

### Claim 7 (depends on 1)

The method of claim 1, wherein the supplemental reference measurement device comprises three magnetometers, the magnetometers deployed in mutually orthogonal directions.

### Claim 8 (depends on 1)

The method of claim 1, wherein (c) further comprises:
causing the first and second gravity measurement devices to measure corresponding first and second gravity vector sets; and
processing the gravity vector sets to determine the change in borehole azimuth.

### Claim 9 (depends on 8)

The method of claim 8, wherein the gravity vector sets each comprise first and second gravity vectors.

### Claim 10 (depends on 9)

The method of claim 9, wherein (c) further comprises deriving a third gravity vector for each of the gravity vector sets, each third gravity vector derived from processing the corresponding first and second gravity vectors and a known total gravitational field of the Earth.

### Claim 11 (depends on 10)

The method of claim 10, wherein the third gravity vector is derived according to the equation:
G3={square root}{square root over (G2−G12−G22)}
wherein G3 is the third gravity vector, G is the known total gravitational field of the earth, and G1 and G2 are the first and second gravity vectors, respectively.

### Claim 12 (depends on 8)

The method of claim 8, wherein each gravity vector set comprises first, second, and third gravity vectors.

### Claim 13 (depends on 1)

The method of claim 1, wherein (b) comprises measuring a magnetic field.

### Claim 14 (depends on 13)

The method of claim 13, wherein (b) comprises measuring first and second magnetic field vectors.

### Claim 15 (depends on 14)

The method of claim 14, wherein (b) further comprises deriving a third magnetic field vector based on the first and second magnetic field vectors and a known total magnetic field of the Earth.

### Claim 16 (depends on 15)

The method of claim 15, wherein the third magnetic field vector is derived according to the equation:
B3={square root}{square root over (B2−B12−B22)}
wherein B3 is the third magnetic field vector, B is the known total magnetic field of the Earth, and B1 and B2 are the first and second magnetic field vectors, respectively.

### Claim 17 (depends on 13)

The method of claim 13, wherein (b) comprises measuring first, second, and third magnetic field vectors.

### Claim 18 (depends on 13)

The method of claim 13, wherein the reference borehole azimuth determined in (b) is processed according to the equation:
8 RefAzi = arctan ⁡ ( ( Gx1 * By1 - Gy1 * Bx1 ) * Gx1 2 + Gy1 2 + Gz1 2 Bz1 * ( Gx1 2 + Gy1 2 ) - Gz1 * ( Gx1 * Bx1 - Gy1 * By1 ) )
wherein RefAzi represents the reference borehole azimuth, Bx1, By1, and Bz1 represent first, second, and third magnetic field vectors measured at the first position, and Gx1, Gy1, and Gz1, represent first, second, and third gravity vectors measured at the first position.

### Claim 19 (depends on 1)

The method of claim 1, wherein the borehole azimuth determined in (d) is processed according to the equation:
BoreAzi=RefAzi+DeltaAzi
wherein BoreAzi represents the borehole reference azimuth, RefAzi represents the reference borehole azimuth, and DeltaAzi represents the change in borehole azimuth.

### Claim 20 (depends on 19)

The method of claim 19, wherein:
9 RefAzi = arctan ( ( Gx1 * By1 - Gy1 * Bx1 ) * Gx1 2 + Gy1 2 + Gz1 2 Bz1 * ( Gx1 2 + Gy1 2 ) - Gz1 * ( Gx1 * Bx1 - Gy1 * By1 ) ; DeltaAzi = Beta 1 - Sin ⁡ ( ( Inc1 + Inc2 ) / 2 ) ; Beta = arctan ⁡ ( ( Gx2 * Gy1 - Gy2 * Gx1 ) * Gx1 * Gy1 * Gz1 Gz2 * ( Gx1 2 + Gy1 2 ) + Gz1 * ( Gx2 * Gx1 + Gy2 * Gy1 ) ) ; Inc1 = arctan ( ( Gx1 2 + Gy1 2 Gz1 ) ; Inc2 = arctan ( ( Gx2 2 + Gy2 2 Gz2 ) ; and
wherein Bx1, By1, and Bz1 represent first, second, and third magnetic field vectors measured at the first position, Gx1, Gy1, and Gz1, represent first, second, and third gravity vectors measured at the first position, Gx2, Gy2, and Gz2, represent first, second, and third gravity vectors measured at the second position, and Inc1 and Inc2 represent borehole inclination values at the first and second positions, respectively.

### Claim 21 (depends on 1)

The method of claim 1, wherein the first position is located shallower into the borehole than the second position.

### Claim 22 (depends on 1)

The method of claim 1, wherein the first position is located deeper into the borehole than the second position.

### Claim 23 (depends on 1)

The method of claim 1, wherein the tool comprises a measurement while drilling tool.

### Claim 24 (depends on 1)

The method of claim 1, wherein the tool is coupled to a drill string.

### Claim 25 (depends on 23)

The method of claim 23, wherein the second position is located in a bottom hole assembly.

### Claim 26 (depends on 1)

The method of claim 1, further comprising:
(e) determining the borehole inclination at at least one of the first and second positions.

### Claim 27 (depends on 26)

The method of claim 26, wherein (e) comprises determining the inclination of the borehole at the first position according to the equation:
10 Inc1 = arctan ⁡ ( ( Gx1 2 + Gy1 2 Gz1 )
wherein Inc1 represents the borehole inclination at the first position and Gx1, Gy1, and Gz1, represent first, second, and third gravity vectors measured at the first position.

### Claim 28 (depends on 26)

The method of claim 26, wherein (e) comprises determining the inclination of the borehole at the second position according to the equation:
11 Inc ⁢ ⁢ 2 = arc ⁢ ⁢ tan ⁡ ( ( Gx ⁢ ⁢ 2 2 + Gy ⁢ ⁢ 2 2 Gz ⁢ ⁢ 2 )
wherein Inc2 represents the borehole inclination at the second position and Gx2, Gy2, and Gz2, represent first, second, and third gravity vectors measured at the second position.

### Claim 29 (depends on 1)

The method of claim 1, further comprising:
(f) establishing borehole azimuth at one of the first and second positions via reference to a previously surveyed azimuthal reference point in the borehole.

### Claim 30 (depends on 1)

The method of claim 1, further comprising:
(e) repeating (a) through (d) to determine borehole azimuth at multiple selected locations in the borehole.

### Claim 31 (depends on 30)

The method of claim 30, wherein the borehole azimuth at two or more of said multiple selected locations is chain referenced to a previously surveyed azimuthal reference point in the borehole.

### Claim 32 (depends on 30)

The method of claim 30, wherein at least one contiguous pair of said multiple selected locations are selected to be a predetermined borehole distance apart, said predetermined borehole distance exceeding twice the borehole distance between the first position and the second position.

### Claim 33 (depends on 1)

The method of claim 1 further comprising:
(f) correcting previously surveyed azimuthal reference points in the borehole with the reference borehole azimuth determined in (b).

### Claim 34

A method for determining azimuth in a borehole, the method comprising:
(a) positioning first and second gravity measurement devices and a supplemental reference measurement device in the borehole, the first and second gravity measurement devices being positioned at corresponding first and second positions in the borehole, the first and second gravity measurement devices being substantially constrained from rotating with respect to one another about a substantially cylindrical borehole axis, the supplemental reference measurement device being positioned at the first position;
(b) determining a reference borehole azimuth at the first position using the supplemental reference measurement device;
(c) determining a change in borehole azimuth between the first and second positions using the first and second sets of gravity measurement devices; and
(d) determining borehole azimuth at the second position by applying the change in borehole azimuth determined in (c) to the reference borehole azimuth determined in (b).

### Claim 35

A method for surveying a borehole, the method comprising:
(a) providing a downhole tool including first and second gravity measurement devices disposed at corresponding first and second positions in the borehole, the first and second gravity measurement devices being constrained from rotating with respect to one another about a substantially cylindrical borehole axis, and a supplemental reference measurement device disposed at the first position;
(b) causing the first and second gravity measurement devices to measure corresponding first and second gravity vector sets;
(c) processing the first and second gravity vector sets to determine a change in borehole azimuth between the first and second positions;
(d) causing the supplemental reference measurement device to measure a magnetic field vector set at the first position;
(e) processing the first gravity vector set and the magnetic field vector set to determine a reference borehole azimuth at the first position;
(f) determining borehole azimuth at the second position by applying the change in borehole azimuth determined in (e) to the reference borehole azimuth determined in (c) when a difference between a total magnetic field and a magnetic field of the Earth is less than a predetermined threshold value.

### Claim 36 (depends on 35)

The method of claim 35, further comprising
(g) determining an azimuth at the second position by referencing an azimuth at the first position to an azimuth of a previously surveyed location in the borehole when a difference between the total magnetic field and the magnetic field of the Earth is greater than a predetermined threshold value.

### Claim 37 (depends on 35)

The method of claim 35, wherein the difference between the total magnetic field and the magnetic field of the Earth is a member of the group consisting of a difference in: (A) magnitude and (B) magnetic dip.

### Claim 38 (depends on 35)

The method of claim 35, wherein:
a total magnetic interference is determined from the difference between the total magnetic field and the magnetic field of the Earth; and
the azimuth at the second position is determined by adding the change in borehole azimuth determined in (e) to the reference borehole azimuth determined in (c) when the total magnetic interference is less than a predetermined value.

### Claim 39 (depends on 35)

The method of claim 35 further comprising:
(g) determining an interference vector from the total magnetic field and the magnetic field of the Earth; and
(h) repeating (a) through (g) to determine an azimuth value and an interference vectors at each of selected multiple locations in the borehole.

### Claim 40 (depends on 39)

The method of claim 39, further comprising:
(i) utilizing the interference vectors at the selected multiple locations in the borehole to determine at least one of a distance and a direction to a source of magnetic interference external to the borehole.

### Claim 41 (depends on 40)

The method of claim 40, wherein the source of magnetic interference is an adjacent borehole.

### Claim 42 (depends on 39)

The method of claim 39, further comprising:
(i) utilizing the interference vectors at the selected multiple locations in the borehole to determine at least one of an inclination and an azimuth of an adjacent borehole.

### Claim 43

A system for surveying a borehole, the system comprising:
a downhole tool including first and second gravity measurement devices and a supplemental reference measurement device deployed thereon, the first and second gravity measurement devices disposed at corresponding first and second positions along a substantially cylindrical axis, the gravity measurement devices constrained from rotational movement with respect to one another about the cylindrical axis, the supplemental reference measurement device disposed at the first position, the tool operable to be positioned in a borehole; and
a processor configured to determine:
(A) a change in borehole azimuth between the first and second positions using outputs from the gravity measurement devices;
(B) a reference borehole azimuth at the first position using an output from the supplemental reference measurement device; and
(C) a borehole azimuth at the second position by applying the change in borehole azimuth determined in (A) to the reference borehole azimuth determined in (B).

### Claim 44 (depends on 43)

The system of claim 43, wherein:
each of the gravity measurement devices comprises first, second, and third accelerometers; and
the supplemental reference measurement device comprises first, second, and third magnetometers.

### Claim 45 (depends on 43)

The system of claim 43, comprising first and second supplemental reference measurement devices disposed at the first and second positions, respectively.

### Claim 46 (depends on 45)

The system of claim 45, wherein one of the supplemental reference measurement devices comprises a gyroscope.

### Claim 47 (depends on 45)

The system of claim 45, wherein:
each of the gravity measurement devices comprises first, second, and third accelerometers; and
each of the supplemental reference measurement devices comprises first, second, and third magnetometers.

### Claim 48

A computer system comprising:
at least one processor; and
a storage device having computer-readable logic stored therein, the computer-readable logic accessible by and intelligible to the processor;
the processor further disposed to receive input from first and second gravity measurement devices when said first and second measurement devices are (1) deployed at corresponding first and second positions in a borehole, and (2) also substantially constrained from rotating with respect to one another about a substantially cylindrical axis along the borehole;
the processor further disposed to receive input from a supplemental reference measurement device when said supplemental reference measurement device is deployed at the first position in the borehole;
the computer-readable logic further configured to instruct the processor to execute a method for determining borehole azimuth, the method comprising:
(a) determining a reference borehole azimuth at the first position using input from the supplemental reference measurement device;
(b) determining a change in borehole azimuth between the first and second positions using input from the first and second sets of gravity measurement devices; and
(c) determining borehole azimuth at the second position by applying the change in borehole azimuth determined in (b) to the reference borehole azimuth measured in (a).

### Claim 49 (depends on 48)

The computer system of claim 48, wherein the reference borehole azimuth determined in (a) is processed according to the equation:
12 RefAzi = arctan ⁡ ( ( Gx ⁢ ⁢ 1 * By ⁢ ⁢ 1 - Gy ⁢ ⁢ 1 * Bx ⁢ ⁢ 1 ) * Gx ⁢ ⁢ 1 2 + Gy ⁢ ⁢ 1 2 + Gz ⁢ ⁢ 1 2 Bz ⁢ ⁢ 1 * ( Gx ⁢ ⁢ 1 2 + Gy ⁢ ⁢ 1 2 ) - Gz ⁢ ⁢ 1 * ( Gx ⁢ ⁢ 1 * Bx ⁢ ⁢ 1 - Gy ⁢ ⁢ 1 * By ⁢ ⁢ 1 ) )
wherein RefAzi represents the reference borehole azimuth, Bx1, By1, and Bz1 represent first, second, and third magnetic field vectors measured at the first position, and Gx1, Gy1, and Gz1, represent first, second, and third gravity vectors measured at the first position.

### Claim 50 (depends on 48)

The computer system of claim 48, wherein the change in borehole azimuth determined in (b) is processed according to the equation:
13 Delta ⁢ ⁢ Azi = ⁢ Beta 1 - Sin ⁡ ( ( Inc ⁢ ⁢ 1 + Inc ⁢ ⁢ 2 ) / 2 ) ; ⁢ ⁢ wherein : Beta = arctan ⁢ ( ( Gx ⁢ ⁢ 2 * Gy ⁢ ⁢ 1 - Gy ⁢ ⁢ 2 * Gx ⁢ ⁢ 1 ) * Gx ⁢ ⁢ 1 * Gy ⁢ ⁢ 1 * Gz ⁢ ⁢ 1 ( Gz ⁢ ⁢ 2 * ( Gx ⁢ ⁢ 1 2 + Gy ⁢ ⁢ 1 2 ) + Gz ⁢ ⁢ 1 * ( Gx ⁢ ⁢ 2 * Gx ⁢ ⁢ 1 + Gy ⁢ ⁢ 2 * Gy ⁢ ⁢ 1 ) ) ; Inc ⁢ ⁢ 1 = ⁢ arctan ⁡ ( ( Gx ⁢ ⁢ 1 2 + Gy ⁢ ⁢ 1 2 Gz ⁢ ⁢ 1 ) ; Inc ⁢ ⁢ 2 = ⁢ arctan ⁡ ( ( Gx ⁢ ⁢ 2 2 + Gy ⁢ ⁢ 2 2 Gz ⁢ ⁢ 2 ) ; and
wherein DeltaAzi represents the change in borehole azimuth, Gx1, Gy1, and Gz1, represent first, second, and third gravity vectors measured at the first position, Gx2, Gy2, and Gz2, represent first, second, and third gravity vectors measured at the second position, and Inc1 and Inc2 represent borehole inclination values at the first and second positions, respectively.

### Claim 51 (depends on 48)

The computer system of claim 48, wherein the borehole azimuth determined in (c) is processed according to the equation:
BoreAzi=RefAzi+DeltaAzi
wherein BoreAzi represents the borehole azimuth, RefAzi represents the reference borehole azimuth, and DeltaAzi represents the change in borehole azimuth.

### Claim 52 (depends on 51)

The computer system of claim 51, wherein:
14 Ref ⁢ ⁢ Azi = ⁢ arctan ( ( Gx ⁢ ⁢ 1 * By ⁢ ⁢ 1 - Gy ⁢ ⁢ 1 * Bx ⁢ ⁢ 1 ) * Gx ⁢ ⁢ 1 2 + Gy ⁢ ⁢ 1 2 + Gz ⁢ ⁢ 1 2 Bz ⁢ ⁢ 1 * ( Gx ⁢ ⁢ 1 2 + Gy ⁢ ⁢ 1 2 ) - Gz ⁢ ⁢ 1 * ( Gx ⁢ ⁢ 1 * Bx ⁢ ⁢ 1 - Gy ⁢ ⁢ 1 * By ⁢ ⁢ 1 ) ; Delta ⁢ ⁢ Azi = ⁢ Beta 1 - Sin ⁡ ( ( Inc ⁢ ⁢ 1 + Inc ⁢ ⁢ 2 ) / 2 ) ; Beta = arctan ⁢ ( ( Gx ⁢ ⁢ 2 * Gy ⁢ ⁢ 1 - Gy ⁢ ⁢ 2 * Gx ⁢ ⁢ 1 ) * Gx ⁢ ⁢ 1 * Gy ⁢ ⁢ 1 * Gz ⁢ ⁢ 1 ( Gz ⁢ ⁢ 2 * ( Gx ⁢ ⁢ 1 2 + Gy ⁢ ⁢ 1 2 ) + Gz ⁢ ⁢ 1 * ( Gx ⁢ ⁢ 2 * Gx ⁢ ⁢ 1 + Gy ⁢ ⁢ 2 * Gy ⁢ ⁢ 1 ) ) ; Inc ⁢ ⁢ 1 = ⁢ arctan ⁡ ( ( Gx ⁢ ⁢ 1 2 + Gy ⁢ ⁢ 1 2 Gz ⁢ ⁢ 1 ) ; Inc ⁢ ⁢ 2 = ⁢ arctan ⁡ ( ( Gx ⁢ ⁢ 2 2 + Gy ⁢ ⁢ 2 2 Gz ⁢ ⁢ 2 ) ; and
wherein Bx1, By1, and Bz1 represent first, second, and third magnetic field vectors measured at the first position, Gx1, Gy1, and Gz1, represent first, second, and third gravity vectors measured at the first position, Gx2, Gy2, and Gz2, represent first, second, and third gravity vectors measured at the second position, and Inc1 and Inc2 represent borehole inclination values at the first and second positions, respectively.
