Enhanced process for conducting potential problem analysis
AssigneeKimberly-Clark Worldwide, Inc.
InventorRicky W. Purcell
Life of this patent
Estimating the term…
Loading patent…
AssigneeKimberly-Clark Worldwide, Inc.
InventorRicky W. Purcell
Estimating the term…
A methodology for prioritizing between a number of anticipated problems employs a mathematical formula that considers probability and seriousness for each of a plurality of identified problems. Each of a plurality of problems is assigned a value for its seriousness, a value for its coefficient of seriousness, and a value for the probability of its occurrence. Once each of the identified problems is assigned these numerical values, then for each problem, the values of probability (P), coefficient of seriousness (σ) and seriousness (S) are entered into the following formula: [P×S]+[σ×S]=RP. The relative priority (RP) value that is calculated by this formula for each rated problem is then ranked to enable the decision-maker to decide which problems deserve to receive the most attention in the shortest period of time.
A method of analyzing potential problems, the steps of the method comprising:
A method of analyzing potential problems, the steps of the method comprising:
Dependencies are inferred from the claim text.