# US 2004/0024629 A1 · Methods and apparatus for project management

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2004/0024629 A1
- Document ID: US20040024629A1
- Status: Published application
- Kind: A1
- Application number: 10/210,923
- Filed: 2002-08-02
- Published: 2004-02-05
- Earliest claimed: 2002-08-02
- Inventors: Jack Reese Kirby JR.; Janice Ellen Frick Burr; Stephen Sterling Fisk; Edward Buchanan Wagstaff; John Douglas D'Atre
- Web page: https://patentgrep.com/patent/US20040024629A1

## CPC

- G06Q 10/063118: {Staff planning in a project environment}
- G06Q 10/06: Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

A method for project management using a project management tool and a network is provided. The project management tool includes a database and at least one client system configured to communicate with the network and the project management tool. The method includes entering a project time entry into the database using the at least one client system and the network, storing the project time entry in the database, and allowing a user to at least one of view, modify, delete, and report the project time entry using the at least one client system and the network.

## Claims

### Claim 1

A method for project management using a project management tool and a network, the project management tool including a database and at least one client system, wherein the at least one client system is configured to communicate with the network and the project management tool, said method comprising:
entering a project time entry into the database using the at least one client system and the network;
storing the project time entry in the database; and
allowing a user to at least one of view, modify, delete, and report the project time entry using the at least one client system and the network.

### Claim 2 (depends on 1)

A method in accordance with claim 1 further comprising displaying at least one project stored in the database on the client system using a “tree-like” structure format.

### Claim 3 (depends on 1)

A method in accordance with claim 1 further comprising displaying at least one of a person and at least one of a group of persons associated with a project on the client system using a “tree-like” structure format.

### Claim 4 (depends on 1)

A method in accordance with claim 1 further comprising displaying multiple views of the project time entry on the client system using the network and the project management tool.

### Claim 5 (depends on 1)

A method in accordance with claim 1 further comprising summing a group of project time entries for a period of time.

### Claim 6 (depends on 5)

A method in accordance with claim 5 wherein summing a group of project time entries for a period of time comprises summing a group of project time entries for a time period of seven days.

### Claim 7 (depends on 5)

A method in accordance with claim 5 wherein summing a group of project time entries for a period of time comprises summing a group of related project time entries for a period of time.

### Claim 8 (depends on 1)

A method in accordance with claim 1 further comprising allowing a user to report a project time entry to another user using the client system and the network.

### Claim 9 (depends on 8)

A method in accordance with claim 8 wherein allowing a user to report a project time entry to another user using the client system and the network comprises allowing a user to report a project time entry to at least one of a project leader and a personnel manager.

### Claim 10 (depends on 1)

A method in accordance with claim 1 wherein the project time entry comprises at least one of paid hours, non-paid hours, regular hours, overtime hours, doubletime hours, and casual hours.

### Claim 11 (depends on 1)

A method in accordance with claim 1 further comprising tracking costs for the number of hours in the at least one project time entry using the project management tool.

### Claim 12 (depends on 1)

A method in accordance with claim 1 further comprising allowing a user to at least one of create, modify, maintain and report information for at least one project using the client system, the project management tool, and the network.

### Claim 13 (depends on 1)

A method in accordance with claim 1 further comprising allowing a user to at least one of create, modify, maintain and report information for at least one user using the client system, the project management tool, and the network.

### Claim 14 (depends on 1)

A method in accordance with claim 1 further comprising connecting the at least one client system and the project management tool via the network, wherein the network includes one of a wide area network, a local area network, an intranet and the Internet.

### Claim 15

A project management apparatus comprising:
at least one computer configured as a server, said server containing a centralized database;
at least one client system connected to said server through a network, said client system configured with a browser;
said centralized database containing at least one project time entry;
said server configured to:
store said at least one project time entry in said database; and
allow a user to at least one of view, modify, delete, and report said at least one project time entry using said at least one client system and said network.

### Claim 16 (depends on 15)

An apparatus in accordance with claim 15 wherein said server further configured to display at least one project stored in said database on said client system using a “tree-like” structure format.

### Claim 17 (depends on 15)

An apparatus in accordance with claim 15 wherein said server further configured to display at least one of a person and at least one of a group of persons associated with a project on said client system using a “tree-like” structure format.

### Claim 18 (depends on 15)

An apparatus in accordance with claim 15 wherein said server further configured to display multiple views of said at least one project time entry on said client system using said network and said project management system.

### Claim 19 (depends on 15)

An apparatus in accordance with claim 15 wherein said server further configured to sum a group of project time entries for a period of time.

### Claim 20 (depends on 15)

An apparatus in accordance with claim 15 wherein said server further configured to sum a group of project time entries for a time period of seven days.

### Claim 21 (depends on 15)

An apparatus in accordance with claim 15 wherein said server further configured to sum a group of related project time entries for a period of time.

### Claim 22 (depends on 15)

An apparatus in accordance with claim 15 wherein said server further configured to allow a user to report said at least one project time entry to another user using said client system and said network.

### Claim 23 (depends on 22)

An apparatus in accordance with claim 22 wherein said server further configured to allow a user to report said at least one project time entry to at least one of a project leader and a personnel manager.

### Claim 24 (depends on 15)

An apparatus in accordance with claim 15 wherein said at least one project time entry comprises at least one of paid hours, non-paid hours, regular hours, overtime hours, doubletime hours, and casual hours.

### Claim 25 (depends on 15)

An apparatus in accordance with claim 15 wherein said server further configured to track costs for the number of hours in said at least one project time entry.

### Claim 26 (depends on 15)

An apparatus in accordance with claim 15 wherein said server further configured to allow a user to at least one of create, modify, maintain and report information for at least one project using said client system, said project management tool, and said network.

### Claim 27 (depends on 15)

An apparatus in accordance with claim 15 wherein said server further configured to allow a user to at least one of create, modify, maintain and report information for at least one user using said client system, said project management tool, and said network.

### Claim 28 (depends on 15)

An apparatus in accordance with claim 15 wherein said server and said at least one client system are connected through a network that includes one of a wide area network, a local area network, an intranet and the Internet.

### Claim 29

A computer program embodied on a computer readable medium for managing projects, said program comprising a code segment that:
maintains a database by adding, deleting and updating information relating to at least one project;
stores at least one project time entry in said database; and
enables a user to at least one of view, modify, delete, and report said at least one project time entry through a client system.

### Claim 30 (depends on 29)

A program in accordance with claim 29 wherein said code segment is further configured to display at least one project stored in said database on said client system using a “tree-like” structure format.

### Claim 31 (depends on 29)

A program in accordance with claim 29 wherein said code segment is further configured to display at least one of a person and at least one of a group of persons associated with a project on said client system using a “tree-like” structure format.

### Claim 32 (depends on 29)

A program in accordance with claim 29 wherein said code segment is further configured to display multiple views of said at least one project time entry on said client system.

### Claim 33 (depends on 29)

A program in accordance with claim 29 wherein said code segment is further configured to:
sum a group of project time entries for a period of time;
sum a group of project time entries for a time period of seven days; and
sum a group of related project time entries for a period of time.

### Claim 34 (depends on 29)

A program in accordance with claim 29 wherein said code segment is further configured to:
generate a report relating to said at least one project time entry and transmit said report to another user; and
generate a report relating to said at least one project time entry and transmit said report to at least one of a project leader and a personnel manager.

### Claim 35 (depends on 29)

A program in accordance with claim 29 wherein said code segment is further configured to track time relating to at least one project including at least one of paid hours, non-paid hours, regular hours, overtime hours, doubletime hours, and casual hours.

### Claim 36 (depends on 29)

A program in accordance with claim 29 wherein said code segment is further configured to track costs for a number of hours in said at least one project time entry.

### Claim 37 (depends on 29)

A program in accordance with claim 29 wherein said code segment is further configured to create, modify, maintain and report information for at least one project.