# US 2004/0016200 A1 · Anchor and method for reinforcing a structure

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2004/0016200 A1
- Document ID: US20040016200A1
- Status: Published application
- Kind: A1
- Application number: 10/205,294
- Filed: 2002-07-24
- Published: 2004-01-29
- Earliest claimed: 2002-07-24
- Assignees: Fyfe Co., LLC
- Inventors: Edward R. Fyfe
- Web page: https://patentgrep.com/patent/US20040016200A1

## CPC

- E04B 7/04: supported by horizontal beams or the equivalent resting on the walls (E04B7/06 takes precedence)
- E02D 27/42: Foundations for poles, masts or chimneys {(sockets or holders for poles or masts per se E04H12/22)}
- E02D 27/50: Anchored foundations
- E04G 23/0218: {Increasing or restoring the load-bearing capacity of building construction elements (E04G23/0203 and E04G23/0266 take precedence)}
- E04G 2023/0251: {by using fiber reinforced plastic elements}
- E04G 2023/0262: {Devices specifically adapted for anchoring the fiber reinforced plastic elements, e.g. to avoid peeling off}
- E04B: GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS (border constructions of opening in walls, floors or ceilings E06B1/00; {electromagnetic shielding H05K9/0001})
- E02D: FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B); UNDERGROUND OR UNDERWATER STRUCTURES {(tunnels, tunnelling, mining E21)}
- E04G: SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS

## Abstract

Anchor 10 for reinforcing a structure against displacement forces and a method of installation includes drilling a borehole 50 in an anchor medium 110 adjacent the structure A length of roving 21 composed of filaments 24 is doubled and pushed into borehole 50 with free end 23 of roving 21 protruding. Backfill grout 41 or resin 42 is pumped or poured into bore hole 50 to embed roving 21 Filaments 24 of free end 23 are spread apart and attached to the structure by adhesive.

## Claims

### Claim 1

A method for reinforcing a structure adjacent an anchoring medium, including the steps of:
making a borehole having a top in the anchoring medium close to the structure;
inserting a length of roving comprising a plurality of elongate filaments into the borehole such that the roving is partly disposed inside the borehole and protrudes as a free end from the top of the borehole;
attaching the protruding free end of the roving to the structure; and
backfilling the borehole with a solidifiable fluid.

### Claim 2 (depends on 1)

The method of claim 1, wherein the step of attaching the protruding free end of the roving to the structure includes the steps of:
spreading apart the plurality of filaments,
splaying the plurality of filaments against a surface of the structure; and
attaching the filaments to the surface with an adhesive.

### Claim 3 (depends on 1)

The method of claim 1, wherein the step of backfilling the borehole with a solidifiable fluid includes the steps of:
inserting an injection tube having an end part having an opening into the borehole; and
injecting a solidifiable fluid into the borehole from the opening of the injection tube.

### Claim 4 (depends on 3)

The method of claim 3, wherein the step of inserting a length of roving comprising a plurality of filaments into the borehole such that roving is partly disposed inside the borehole and protrudes as a free end from the top of the borehole includes the steps of.
folding the length of roving approximately in half such that the length of roving has two free ends and a central bent portion,
placing the central bent portion over the top of the borehole; and
pushing on the central bent portion with the end part of the injection tube until the central bent portion reaches the desired depth in the borehole.

### Claim 5 (depends on 3)

The method of claim 3, wherein the step of injecting a solidifiable fluid into the borehole from the opening of the injection tube further includes the step of
withdrawing the injection tube from the borehole at a rate such that the end part of the injection tube remains above and close to the level of the solidifiable fluid being injected.

### Claim 6 (depends on 1)

The method of claim 1, wherein the step of inserting a length of roving comprising a plurality of filaments into the borehole such that roving is partly disposed inside the borehole and protrudes as a free end from the top of the borehole includes the steps of
folding the length of roving approximately in half such that the length of roving has two free ends and a central bent portion;
placing the central bent portion over the top of the borehole, and
pushing on the central bent portion with the end part of an insertion shaft until the central bent portion reaches the desired depth in the borehole.

### Claim 7 (depends on 6)

The method of claim 6, wherein the step of backfilling the borehole with a solidifiable fluid further includes the steps of.
introducing the solidifiable fluid into the top of the borehole,
allowing the insertion shaft to remain in the borehole

### Claim 8

An anchor for a structure adjacent an anchor medium, including
a borehole in the anchor medium adjacent the structure, including.
a top, and
a longitudinal axis;
a length of roving partly disposed within said borehole generally parallel to said longitudinal axis of said borehole including.
a free end protruding from said top of said borehole and attached to the structure; and
backfill material filling said borehole and surrounding said roving.

### Claim 9 (depends on 8)

The ground anchor of claim 8, wherein said free end is attached to the structure by adhesive means.

### Claim 10 (depends on 9)

The ground anchor of claim 9, wherein said adhesive means is a glue from the group of synthetic resins consisting of epoxy, silicone, polyurea, polyester, or acrylic.

### Claim 11 (depends on 8)

The ground anchor of claim 8, wherein said backfill material includes a solidifiable fluid.

### Claim 12 (depends on 11)

The ground anchor of claim 11, wherein said solidifiable fluid comprises a resin from the group of synthetic resins consisting of epoxy, polyester, and acrylic

### Claim 13 (depends on 11)

The ground anchor of claim 11, wherein said solidifiable fluid is a an inorganic slurry from the group consisting of cementitious grout, clay, and plaster.

### Claim 14 (depends on 11)

The ground anchor of claim 11, said backfill material further including an injection tube used for injecting said solidifiable fluid.

### Claim 15

In combination:
a structure;
an anchor medium adjacent said structure; and
an anchor attaching said structure to said anchor medium for reinforcing said structure, including:
a borehole in said anchor medium adjacent said structure. including:
a top; and
a longitudinal axis;
a length of roving partly disposed within said borehole generally parallel to said longitudinal axis of said borehole including:
a free end protruding from said top of said borehole and attached to said structure; and
backfill material filling said borehole and surrounding said roving.

### Claim 16 (depends on 15)

The combination of claim 15, said free end further including adhesive means.

### Claim 17 (depends on 16)

The combination of claim 16, said adhesive means comprising epoxy resin

### Claim 18 (depends on 15, 18)

The combination of claim 15, said backfill material including a solidifiable fluid 19. The combination of claim 18, said solidifiable fluid being a member of the group consisting of synthetic resins, inorganic grouts, fiber-reinforced resin, and resin/cement blended grouts.

### Claim 20 (depends on 15)

The combination of claim 15, wherein said anchor medium is the ground