# US 2003/0224771 A1 · Method for coordinating tasks in a GSM network

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2003/0224771 A1
- Document ID: US20030224771A1
- Status: Published application
- Kind: A1
- Application number: 10/455,089
- Filed: 2003-06-05
- Published: 2003-12-04
- Earliest claimed: 2000-12-05
- Assignees: Infineon Technologies AG
- Inventors: Luis Alfredo Alonso Nogueiro; Holger Kufner
- Web page: https://patentgrep.com/patent/US20030224771A1

## CPC

- G06F 9/4887: {involving deadlines, e.g. rate based, periodic}
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

In a mobile unit of a GSM network (Global System for Mobile Communications), various tasks are performed under real-time constraints. After starting an execution of a first task, the execution of the first task is suspended a plurality of times for a respective plurality of time intervals. A second task is executed during at least one of the plurality of time intervals. The first and second tasks are performed by a single-core microprocessor digital signal processor with a microprocessor and a digital signal processor combined on a single chip

## Claims

### Claim 1

A method of coordinating tasks in a GSM system, the method which comprises:
providing a first task including GSM layer 1 tasks, and providing a second task including GSM upper layer tasks;
providing a single-core microprocessor digital signal processor having a microprocessor and a digital signal processor combined on a single chip;
starting an execution of the first task with the single-core microprocessor digital signal processor;
suspending the execution of the first task a plurality of times for a respective plurality of time intervals; and
executing the second task with the single-core microprocessor digital signal processor during at least one of the plurality of time intervals.

### Claim 2 (depends on 1)

The method according to claim 1, which comprises:
assigning a first priority to the first task; and
assigning a second priority to the second task, the first priority being a higher priority than the second priority.

### Claim 3 (depends on 1)

The method according to claim 1, which comprises:
estimating a termination time of the first task to form an estimated termination time; and
suspending the execution of the first task based on the estimated termination time.

### Claim 4 (depends on 1)

The method according to claim 1, which comprises executing the first task without interruption until real-time requirements of the first task are met.

### Claim 5 (depends on 1)

The method according to claim 1, which comprises scheduling the suspending step with a real-time operating system.

### Claim 6 (depends on 1)

The method according to claim 1, which comprises scheduling the suspending step with a real-time operating system having interruptible system calls.

### Claim 7 (depends on 1)

The method according to claim 1, which comprises:
scheduling the suspending step with a real-time operating system having non-interruptible system calls; and
providing the non-interruptible system calls as deterministic systems calls having durations shorter than a latency period of the first task.

### Claim 8 (depends on 1)

The method according to claim 1, which comprises:
providing, as the first and second tasks, a GSM Interrupt Service Routine, an application Interrupt Service Routine, a GSM Interrupt Service Thread, an application Interrupt Service Thread, and an application task; and
assigning respective priorities in a descending order to the GSM Interrupt Service Routine, the application Interrupt Service Routine, the GSM Interrupt Service Thread, the application Interrupt Service Thread, and the application task, respectively.
