# US 2003/0221835 A1 · Modular coiled tubing system for drilling and production platforms

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2003/0221835 A1
- Document ID: US20030221835A1
- Status: Published application
- Kind: A1
- Application number: 10/191,645
- Filed: 2002-07-09
- Published: 2003-12-04
- Earliest claimed: 2002-06-04
- Assignees: Schlumberger Technology Corporation
- Inventors: Yarom Polsky; Rod Shampine; Terry McCafferty
- Web page: https://patentgrep.com/patent/US20030221835A1

## CPC

- E21B 19/22: Handling reeled pipe or rod units, e.g. flexible drilling pipes {(lifting or hauling appliances using two or more cooperating endless chains B66D3/003)}
- E21B 15/003: {adapted to be moved on their substructure, e.g. with skidding means; adapted to drill a plurality of wells}
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

A modular work system permits Rig Up time to be substantially reduced by reducing the number of crane lifts required to offload equipment for a transport boat or vehicle. This is achieved by developing transport skids capable of holding multiple system components. The number of equipment components that must be mechanically coupled on location is reduced by pre-assembling the components and maintaining the assembly in operating condition during storage and transport. Skid design concepts are employed, wherein a skid system carries various pre-assembled components for transport, storage and operation. Specifically, a skid sub-system includes various related components. The components are either pre-assembled or are designed to complete a sub-assembly through final assembly on the rig. The skid is moved into place using the crane, and the assembly is completed. Additional sub-systems are mounted on additional skids which are designed to be mated with the other related skids and sub-assemblies. Each skid sub-system fits in an envelope meeting transportation regulations for vehicle width and height. The system is particularly suitable for jacking frame operations.

## Claims

### Claim 1

A modular assembly for transporting and deploying multiple pre-assembled subassemblies for coiled tubing operating systems for a rig, the modular assembly comprising:
a. A first skid assembly for housing subassemblies, the first skid including a lower support surface for supporting the skid on the rig and an upper support surface for supporting additional components;
b. Subassemblies mounted on the base skid;
c. A second skid assembly including a support surface adapted to be mounted on the upper support surface of the base skid for securing and positioning the work specific assembly on the base skid.

### Claim 2 (depends on 1)

The modular assembly of claim 1, wherein the subassemblies housed in the first skid include:
a. A lower wellhead assembly;
b. A riser;
c. An assembled BOP stack.

### Claim 3 (depends on 2)

The modular assembly of claim 2, wherein the lower wellhead assembly includes at least one shear ram.

### Claim 4 (depends on 2)

The modular assembly of claim 2, wherein the lower wellhead assembly includes a safety head.

### Claim 5 (depends on 2)

The modular assembly of claim 2, wherein the lower wellhead assembly, the riser and the assembled BOP stack components are positioned on the first skid such that the first skid and components occupy an envelope suitable for transport by standard transport means.

### Claim 6 (depends on 1)

The modular assembly of claim 1, wherein the subassemblies housed in the first skid include:
a) a well control stack, said well control stack including an upper BOP connected to a riser.

### Claim 7 (depends on 5)

The modular assembly of claim 5, further including a lower BOP.

### Claim 8 (depends on 6)

The modular assembly of claim 6, further including an additional riser.

### Claim 9 (depends on 1)

The modular assembly of claim 1, further including a removable crash frame on the first skid for protecting the subassemblies mounted thereon.

### Claim 10 (depends on 1)

The modular assembly of claim 1, wherein the work specific assembly is a jacking frame which permits horizontal movement relative to a wellbore.

### Claim 11 (depends on 9)

The modular assembly of claim 9, wherein said jacking frame is a single column-type design.

### Claim 12 (depends on 9)

The modular assembly of claim 9, further including a support frame for supporting the jacking frame in a rotated position whereby the jacking frame occupies an envelope suitable for transport by standard support means.

### Claim 13 (depends on 11)

The modular assembly of claim 11, wherein the support frame is a removable crash frame.

### Claim 14 (depends on 9)

The modular assembly of claim 9, further including means for rotating the jacking frame from the rotated position to an operating position while in the support frame.

### Claim 15 (depends on 9)

The modular assembly of claim 9, further including a stowable work platform on the jacking frame.

### Claim 16 (depends on 2)

The modular assembly of claim 2, further including a stowable work platform on the riser/BOP assembly.

### Claim 17

A method for setting up and assembling a work operation on a rig floor comprising the steps of:
a. Positioning a skid mounted lower wellhead assembly and riser/BOP assembly on a rig floor near the wellhead;
b. Removing the lower wellhead assembly from the skid and lowering it onto the wellhead;
c. Positioning the skid over the wellhead;
d. Positioning the riser/BOP on the lower wellhead assembly through the skid and the rig floor;
e. Positioning a work specific assembly on the skid and in position on the riser/BOP and mounting the work specific assembly to the skid.

### Claim 18 (depends on 16)

The method of claim 16, wherein the lower wellhead assembly comprises a shear ram.

### Claim 19 (depends on 16)

The method of claim 16, wherein the lower wellhead assembly comprises a safety head.

### Claim 20 (depends on 16)

The method of claim 16, wherein the work specific assembly comprises a jacking frame.

### Claim 21 (depends on 19)

The method of claim 19, wherein the jacking frame is mounted in a support frame in a rotated position and wherein the method includes rotating the jacking frame to a work position while in the frame and before positioning the jacking frame on the skid.