# US 2003/0075322 A1 · Method and system for management of by-products from subterranean zones

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2003/0075322 A1
- Document ID: US20030075322A1
- Status: Published application
- Kind: A1
- Application number: 10/046,001
- Filed: 2001-10-19
- Published: 2003-04-24
- Earliest claimed: 2001-10-19
- Assignees: CDX Gas, LLC
- Inventors: Joseph A. Zupanick; Monty H. Rial
- Web page: https://patentgrep.com/patent/US20030075322A1

## CPC

- E21B 43/305: {comprising at least one inclined or horizontal well}
- E21B 43/00: Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells (applicable only to water E03B)
- E21B 43/006: {Production of coal-bed methane (E21B43/243 takes precedence)}
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

An improved method for management of by-products from subterranean zones, comprising drilling a first well system into a subterranean zone, wherein the first well system comprises a first drainage pattern. By-product and gas from a first volume of the subterranean zone is removed via the first well system. A second well system is drilled into the subterranean zone, wherein the second well system comprises a second drainage pattern, and by-product is moved from a second volume of the subterranean zone to the first volume of the subterranean zone. Gas is then produced from the second volume of the subterranean zone. Subsequent drainage patterns repeat the process.

## Claims

### Claim 1

A method for management of subterranean by-product, comprising:
drilling a first well system into a subterranean zone, wherein the first well system comprises a first drainage pattern;
removing via the first well system by-product from a first volume of the subterranean zone;
producing gas from the first volume of the subterranean zone;
drilling a second well system into the subterranean zone, wherein the second well system comprises a second drainage pattern;
moving by-product from a second volume of the subterranean zone to the first volume of the subterranean zone; and
producing gas from the second volume of the subterranean zone.

### Claim 2 (depends on 1)

The method of claim 1, wherein the subterranean zone has an initial formation pressure below 250 pounds per square inch (psi).

### Claim 3 (depends on 1)

The method of claim 1, wherein the subterranean zone has an initial formation pressure below 150 pounds per square inch (psi).

### Claim 4 (depends on 1)

The method of claim 1, wherein at least one of the drainage patterns comprises a main bore with a plurality of lateral bores.

### Claim 5 (depends on 1)

The method of claim 1, wherein at least one of the drainage patterns provides substantially uniform fluid flow within a subterranean area.

### Claim 6 (depends on 1)

The method of claim 1, wherein at least one of the drainage patterns comprises a main bore extending from a first end of an area in the subterranean zone to a distant end of the area, and at least one set of lateral bores extending outwardly from a side of the main bore.

### Claim 7 (depends on 6)

The method of claim 6, wherein the lateral well bores progressively shorten as a distance between a respective lateral well bore and the first end increases.

### Claim 8 (depends on 1)

The method of claim 1, wherein the subterranean zone comprises a coal seam, the by-product comprises water, and the gas comprises coalbed methane.

### Claim 9 (depends on 1)

The method of claim 1, wherein the second well system is substantially updip of the first well system.

### Claim 10 (depends on 1)

The method of claim 1, wherein a majority of the by-product feasibly removable from the second volume is moved from the second volume of the subterranean zone to the first volume of the subterranean zone.

### Claim 11 (depends on 1)

The method of claim 1, wherein the moving by-product from a second volume of the subterranean zone to the first volume of the subterranean zone is by pumping the by-product from the second volume to the surface followed by re-injecting the by-product into the first volume.

### Claim 12 (depends on 11)

The method of claim 11, wherein the pumping is via a pump, an inlet of which is disposed in an enlarged cavity formed in a well-bore and the pump operable to pump fluid accumulated in the enlarged cavity to the surface.

### Claim 13 (depends on 1)

The method of claim 1, wherein the moving by-product from a second volume of the subterranean zone to the first volume of the subterranean zone is by forming a subsurface hydraulic connection between the first drainage pattern and the second drainage pattern.

### Claim 14

A method for management of subterranean by-product, comprising:
drilling a first well system into a subterranean zone, the subterranean zone having a structural dip, wherein the first well system comprises a first substantially dip-parallel drainage pattern extending updip in the subterranean zone and ending at a first terminus;
removing via the first well system by-product from a first volume of the subterranean zone to allow gas production from the first volume;
producing gas from the first volume via the first well system;
drilling a second well system into the subterranean zone, wherein the second well system comprises a second substantially dip-parallel drainage pattern extending updip in the subterranean zone and updip of the first terminus and ending at a second terminus; and
moving via the first well system and the second well system by-product from a second volume of the subterranean zone to the first volume of the subterranean zone; and
producing gas from the second volume of the subterranean zone via the second well system.

### Claim 15 (depends on 14)

The method of claim 14, wherein the moving comprises removing to the surface the fluid from the second volume and causing the fluid to flow from the surface to the first volume of the subterranean zone.

### Claim 16 (depends on 15)

The method of claim 15, wherein the flow from the surface to the first volume of the subterranean zone is via the first well system.

### Claim 17 (depends on 14)

The method of claim 14, wherein the moving comprises forming a hydraulic connection between the first substantially dip-parallel drainage pattern and the second substantially dip-parallel drainage pattern.

### Claim 18 (depends on 14)

The method of claim 14, wherein the hydraulic connection is subsurface.

### Claim 19 (depends on 18)

The method of claim 18, further comprising:
drilling a third well system into the subterranean zone, wherein the third well system comprises a third substantially dip-parallel drainage pattern extending updip in the subterranean zone and updip from the second terminus; and
moving by-product from a third volume of the subterranean zone to at least one of the first and second volume of the subterranean zone.

### Claim 20 (depends on 19)

The method of claim 19, wherein the moving comprises removing to the surface the fluid from the third volume of the subterranean zone and causing the fluid to flow from the surface to at least one of the first and second volume of the subterranean zone.

### Claim 21 (depends on 20)

The method of claim 20, wherein the flow from the surface to at least one of the first and second volume of the subterranean zones is via the first or second well system.

### Claim 22 (depends on 19)

The method of claim 19, wherein the moving comprises forming a hydraulic connection between the first substantially dip-parallel drainage pattern and the second substantially dip-parallel drainage pattern.

### Claim 23 (depends on 22)

The method of claim 22, wherein the hydraulic connection is subsurface.

### Claim 24 (depends on 14)

The method of claim 14, wherein at least one of the substantially dip-parallel drainage patterns comprises a main bore with a plurality of lateral bores.

### Claim 25 (depends on 14)

The method of claim 14, wherein at least one of the substantially dip-parallel drainage patterns provides substantially uniform fluid flow within a subterranean area.

### Claim 26 (depends on 14)

The method of claim 14, wherein at least one of the substantially dip-parallel drainage patterns comprises a main bore extending from a first end of an area in the subterranean zone to a distant end of the area, and at least one set of lateral bores extending outwardly from a side of the main bore.

### Claim 27 (depends on 14)

The method of claim 14, wherein the subterranean zone comprises a coal seam, the by-product comprises water, and the gas comprises coalbed methane.

### Claim 28 (depends on 14)

The method of claim 14, wherein the drainage patterns each comprise an area of about 150-200 acres.

### Claim 29 (depends on 14)

The method of claim 14, wherein at least 80% of the gas in the first and second volumes of the subterranean zone is produced and wherein substantially all of the by-product from the second volume of the subterranean zone is moved back into the subterranean zone.

### Claim 30

A field operable to remove materials from the subsurface, comprising:
a plurality of drainage pattern sets, each set comprising one or more substantially dip-parallel well-bore patterns extending through a formation, and a majority of the sets used to drain water, produce gas, and receive by-product from an up-dip set of patterns.
