# US 2003/0042322 A1 · Double sleeper for getrac A3 fixed track

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2003/0042322 A1
- Document ID: US20030042322A1
- Status: Published application
- Kind: A1
- Application number: 10/210,773
- Filed: 2002-08-01
- Published: 2003-03-06
- Earliest claimed: 2001-09-04
- Assignees: Pfleiderer Infrastrukturtechnik GmbH & Co. KG
- Inventors: Winfried Mohr; Gerhard Berns; Gundolf Spitzner
- Web page: https://patentgrep.com/patent/US20030042322A1

## CPC

- E01B 1/007: {with interlocking means to withstand horizontal forces}
- E01B 1/00: Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway (draining by trenches, culverts, or conduits E01F5/00)
- E01B 3/32: with armouring or reinforcement (hollow sleepers E01B3/30)
- E01B 1/001: {Track with ballast}
- E01B 1/002: {Ballastless track, e.g. concrete slab trackway, or with asphalt layers}
- E01B 2204/13: Dowels for slabs, sleepers or rail-fixings
- E01B: PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS (derailing or rerailing blocks on track, track brakes or retarders B61K)

## Abstract

A railroad tie of compact design for a fixed track with an overlay of asphalt of the Getrac A3 construction with a dowel stone, which is inserted in a recess and which, reaching over the railroad tie and protruding downward, engages a cavity pocket of the asphalt track. The railroad tie is constructed as a double railroad tie, which forms only a narrow gap with the adjacent railroad tie in order to make radial laying (curve) possible and which is provided in the region of the dowel stone on the underside with lateral constrictions, so that the cavity pockets can be filled subsequently.

## Claims

### Claim 1

A railroad tie of compact design for a fixed track with an overlay of asphalt of the Getrac A3 construction with a dowel stone, which is inserted in a recess on the underside and which, reaching over the railroad tie and protruding downward, engages a cavity pocket of the asphalt track, wherein the railroad tie is constructed as a double railroad tie at (4), which forms only a narrow gap with the adjacent railroad tie in order to make radial laying (curve) possible and which is provided in the region of the dowel stone (7) on the underside with lateral constrictions (11, 12), so that the cavity pockets (10) can be filled subsequently.

### Claim 2 (depends on 1)

The double railroad tie of claim 1, wherein the dowel stone (7) is held by means of an elastic ring bearing (8) in the recess (9).

### Claim 3 (depends on 1, 2)

The double railroad tie of claims 1 or 2, wherein the railroad tie is provided in the region of the lateral constrictions (11, 12) on the underside with a cavity (13) of low height, which is continuous over the width.